Title 16 · ConservationParks and public lands
Changes to 16 U.S.C. § 824p
H.R. 10539 · Integrated Local, Regional, and Interregional Transmission Planning Act of 2026 · Introduced The text as a member of Congress first filed it. Most bills never get further than this.
In committee · step 2 of 5
16 U.S.C. § 824p Siting of interstate electric transmission facilities
1 change the bill asks for here, 1 carried out
- Carried out:
Section 216(b) of the Federal Power Act (16 U.S.C. 824p(b)) is amended by inserting
selected for construction or modification pursuant to a joint transmission plan approved by the Commission pursuant to section 224 or
afterconstruction or modification of electric transmission facilities
.
§ 824p(a)–(b)
Start of § 824p to (a)(4)(G)(ii) unchanged ·
(H) the designation would result in a reduction in the cost to purchase electric energy for consumers.
(b) Construction permit Except as provided in subsection (i), the Commission may, after notice and an opportunity for hearing, issue one or more permits for the construction or modification of electric transmission facilities [inserted: selected for construction or modification pursuant to a joint transmission plan approved by the Commission pursuant to section 224 or ]in a national interest electric transmission corridor designated by the Secretary under subsection (a) if the Commission finds that—
(1)
(A) a State in which the transmission facilities are to be constructed or modified does not have authority to—
Rest of § 824p unchanged ·