H.R. 10635 · Saving Rural Reservoirs Act ·

In committee · step 2 of 5

Sections are cited like “7 U.S.C. § 2012”: 7 of the , 2012.

16 U.S.C. § 1012 Rehabilitation of structural measures near, at, or past their evaluated life expectancy

+11 −1Shown
More for 16 U.S.C. § 1012
Read § 1012Only this section
2 changes the bill asks for here, 2 carried out
  1. Carried out:

    in paragraph (2), in the matter preceding subparagraph (A), by inserting a covered dam or before a work of improvement; and

  2. Carried out:

    by adding at the end the following:(4) Covered dam.— The term “covered dam” means— (A) an eligible high hazard potential dam (as such term is defined in section 2 of the National Dam Safety Program Act (33 U.S.C. 467)); or (B) any dam— (i) located in a town with a population of less than 5,000 people; and (ii) …

§ 1012(a)–(b)

WhereMarkText
§ 1012. Rehabilitation of structural measures near, at, or past their evaluated life expectancy
(a)(a) Definitions
For purposes of this section:
(a)(1)(1) Rehabilitation
The term “rehabilitation”, with respect to a structural measure constructed as part of a covered water resource project, means the completion of all work necessary to extend the service life of the structural measure and meet applicable safety and performance standards. This may include: (A) protecting the integrity of the structural measure or prolonging the useful life of the structural measure beyond the original evaluated life expectancy; (B) correcting damage to the structural measure from a catastrophic event; (C) correcting the deterioration of structural components that are deteriorating at an abnormal rate; (D) upgrading the structural measure to meet changed land use conditions in the watershed served by the structural measure or changed safety criteria applicable to the structural measure; or (E) decommissioning the structure, if requested by the local organization.
(a)(2)(2) Covered water resource project
The term “covered water resource project” means a work of improvement carried out under any of the following:
The term “covered water resource project” means a [inserted: covered dam or a ]work of improvement carried out under any of the following:
(a)(2)(A)(A)
This chapter.
(a)(2)(B)(B)
Section 13 of the Act of December 22, 1944 (Public Law 78–534; 58 Stat. 905).
(a)(2)(C)(C)
The pilot watershed program authorized under the heading “Flood Prevention” of the Department of Agriculture Appropriation Act, 1954 (Public Law 156; 67 Stat. 214).
(a)(2)(D)(D)
Subtitle H of title XV of the Agriculture and Food Act of 1981 (16 U.S.C. 3451 et seq.; commonly known as the Resource Conservation and Development Program).
(a)(3)(3) Structural measure
The term “structural measure” means a physical improvement that impounds water, commonly known as a dam, which was constructed as part of a covered water resource project, including the impoundment area and flood pool.
(a)(4)(4) [inserted: Covered dam.—]
[inserted: The term “covered dam” means—]
(a)(4)(A)(A) [inserted: ]
[inserted: an eligible high hazard potential dam (as such term is defined in section 2 of the National Dam Safety Program Act (33 U.S.C. 467)); or]
(a)(4)(B)(B) [inserted: ]
[inserted: any dam—]
(a)(4)(B)(i)(i) [inserted: ]
[inserted: located in a town with a population of less than 5,000 people; and]
(a)(4)(B)(ii)(ii) [inserted: ]
[inserted: for which more than 50 percent of the total volume of the embankment of the dam is formed of compacted earth layers.]
(b)(b) Cost share assistance for rehabilitation
(b)(1)(1) Assistance authorized
The Secretary may provide financial assistance to a local organization to cover a portion of the total costs incurred for the rehabilitation of structural measures originally constructed as part of a covered water resource project. The total costs of rehabilitation include the costs associated with all components of the rehabilitation project, including acquisition of land, easements, and rights-of-ways, rehabilitation project administration, the provision of technical assistance, contracting, and construction costs, except that the local organization shall be responsible for securing all land, easements, or rights-of-ways necessary for the project.

Rest of § 1012 unchanged