16 U.S.C. § 2621 Consideration and determination respecting certain ratemaking standards
2 changes the bill asks for here, 2 carried out
- Carried out:
Section 111(d)(18)(B) of the Public Utility Regulatory Policies Act of 1978 (16 U.S.C. 2621(d)(18)(B)) is repealed.
- Carried out:
Section 111(d) of the Public Utility Regulatory Policies Act of 1978 (16 U.S.C. 2621(d)) is amended by adding at the end the following:
(22) Prohibition on rate recovery for smart grid investments.— No electric utility may recover from ratepayers any capital, operating expenditure, or other costs of the electric utility relating to the deployment of any smart grid system..
§ 2621(d)Establishment(18)–(19)
Start of § 2621 to (d)(18)(A)(v) unchanged
| Where | Mark | The Code now | Mark | As the bill would leave it |
|---|---|---|---|---|
| (18)(A)(vi) | (vi) | (vi) | ||
| societal benefit. | societal benefit. | |||
| (18)(B) | (B) Rate recovery | (B) Rate recovery | ||
| (18)(C) | (C) Obsolete equipment | (C) Obsolete equipment | ||
| Each State shall consider authorizing any electric utility or other party of the State to deploy a qualified smart grid system to recover in a timely manner the remaining book-value costs of any equipment rendered obsolete by the deployment of the qualified smart grid system, based on the remaining depreciable life of the obsolete equipment. | Each State shall consider authorizing any electric utility or other party of the State to deploy a qualified smart grid system to recover in a timely manner the remaining book-value costs of any equipment rendered obsolete by the deployment of the qualified smart grid system, based on the remaining depreciable life of the obsolete equipment. | |||
| (19) | (19) Smart grid information | (19) Smart grid information | ||
§ 2621(d)Establishment(21)–(22)
(d)(19)(A)–(21)(B) unchanged
| Where | Mark | The Code now | Mark | As the bill would leave it |
|---|---|---|---|---|
| (21)(C) | (C) | (C) | ||
| accelerate third-party investment in electric vehicle charging for light-, medium-, and heavy-duty vehicles; and | accelerate third-party investment in electric vehicle charging for light-, medium-, and heavy-duty vehicles; and | |||
| (21)(D) | (D) | (D) | ||
| appropriately recover the marginal costs of delivering electricity to electric vehicles and electric vehicle charging infrastructure. | appropriately recover the marginal costs of delivering electricity to electric vehicles and electric vehicle charging infrastructure. | |||
| (22) | (22) [inserted: Prohibition on rate recovery for smart grid investments.—] | |||
| [inserted: No electric utility may recover from ratepayers any capital, operating expenditure, or other costs of the electric utility relating to the deployment of any smart grid system.] | ||||