Changes to the Code
H.R. 1148 · SMARTER Act · Introduced The text as a member of Congress first filed it. Most bills never get further than this.
In committee · step 2 of 5
16 U.S.C. § 2621 Consideration and determination respecting certain ratemaking standards
2 changes the bill asks for here, 2 carried out
- Carried out:
Section 111(d)(18)(B) of the Public Utility Regulatory Policies Act of 1978 (16 U.S.C. 2621(d)(18)(B)) is repealed.
- Carried out:
Section 111(d) of the Public Utility Regulatory Policies Act of 1978 (16 U.S.C. 2621(d)) is amended by adding at the end the following:
(22) Prohibition on rate recovery for smart grid investments.— No electric utility may recover from ratepayers any capital, operating expenditure, or other costs of the electric utility relating to the deployment of any smart grid system..
§ 2621(d)Establishment(18)–(19)
Start of § 2621 to (d)(18)(A)(v) unchanged
| Where | Mark | The Code now | Mark | As the bill would leave it |
|---|---|---|---|---|
| (18)(A)(vi) | (vi) | (vi) | ||
| societal benefit. | societal benefit. | |||
| (18)(B) | (B) Rate recovery | (B) Rate recovery | ||
| (18)(C) | (C) Obsolete equipment | (C) Obsolete equipment | ||
| Each State shall consider authorizing any electric utility or other party of the State to deploy a qualified smart grid system to recover in a timely manner the remaining book-value costs of any equipment rendered obsolete by the deployment of the qualified smart grid system, based on the remaining depreciable life of the obsolete equipment. | Each State shall consider authorizing any electric utility or other party of the State to deploy a qualified smart grid system to recover in a timely manner the remaining book-value costs of any equipment rendered obsolete by the deployment of the qualified smart grid system, based on the remaining depreciable life of the obsolete equipment. | |||
| (19) | (19) Smart grid information | (19) Smart grid information | ||
§ 2621(d)Establishment(21)–(22)
(d)(19)(A)–(21)(B) unchanged
| Where | Mark | The Code now | Mark | As the bill would leave it |
|---|---|---|---|---|
| (21)(C) | (C) | (C) | ||
| accelerate third-party investment in electric vehicle charging for light-, medium-, and heavy-duty vehicles; and | accelerate third-party investment in electric vehicle charging for light-, medium-, and heavy-duty vehicles; and | |||
| (21)(D) | (D) | (D) | ||
| appropriately recover the marginal costs of delivering electricity to electric vehicles and electric vehicle charging infrastructure. | appropriately recover the marginal costs of delivering electricity to electric vehicles and electric vehicle charging infrastructure. | |||
| (22) | (22) [inserted: Prohibition on rate recovery for smart grid investments.—] | |||
| [inserted: No electric utility may recover from ratepayers any capital, operating expenditure, or other costs of the electric utility relating to the deployment of any smart grid system.] | ||||
16 U.S.C. § 2622 Obligations to consider and determine
3 changes the bill asks for here, 3 carried out
- Carried out:
Section 112(b) of the Public Utility Regulatory Policies Act of 1978 (16 U.S.C. 2622(b)) is amended by adding at the end the following:
(8) (A) Not later than 1 year after the date of enactment of this paragraph, each State regulatory authority (with respect to each electric utility for which the State has ratemaking authority) and each nonregulated utility shall commence consideration under section 111, or set …
The section already has a provision under this letter or number, so it would have two.
- Carried out:
Section 112(c) of the Public Utility Regulatory Policies Act of 1978 (16 U.S.C. 2622(c)) is amended by adding at the end the following:
In the case of the standard established by paragraph (22) of section 111(d), the reference contained in this subsection to the date of enactment of this Act shall be deemed to be a reference to the date of enactment of that paragraph (22).
. - Carried out:
Section 112 of the Public Utility Regulatory Policies Act of 1978 (16 U.S.C. 2622) is amended by adding at the end the following:
(i) Prior State actions.— Subsections (b) and (c) shall not apply to the standard established by paragraph (22) of section 111(d) in the case of any electric utility in a State if, before the date of enactment of this subsection— (1) the State has implemented for the electric …
This bill puts a provision under a letter or number this section already uses, so the section would have two. The law has probably changed since the bill was written.
§ 2622(b)–(d)
Start of § 2622 to (b)(8) unchanged
| Where | Mark | The Code now | Mark | As the bill would leave it |
|---|---|---|---|---|
| (b)(8)(A) | (A) | (A) | ||
| Not later than 1 year after November 15, 2021, each State regulatory authority (with respect to each electric utility for which the State has ratemaking authority) and each nonregulated utility shall commence consideration under section 2621 of this title, or set a hearing date for consideration, with respect to the standard established by paragraph (21) of section 2621(d) of this title. | Not later than 1 year after November 15, 2021, each State regulatory authority (with respect to each electric utility for which the State has ratemaking authority) and each nonregulated utility shall commence consideration under section 2621 of this title, or set a hearing date for consideration, with respect to the standard established by paragraph (21) of section 2621(d) of this title. | |||
| (b)(8)(B) | (B) | (B) | ||
| Not later than 2 years after November 15, 2021, each State regulatory authority (with respect to each electric utility for which the State has ratemaking authority), and each nonregulated electric utility shall complete the consideration and make the determination under section 2621 of this title with respect to the standard established by paragraph (21) of section 2621(d) of this title. | Not later than 2 years after November 15, 2021, each State regulatory authority (with respect to each electric utility for which the State has ratemaking authority), and each nonregulated electric utility shall complete the consideration and make the determination under section 2621 of this title with respect to the standard established by paragraph (21) of section 2621(d) of this title. | |||
| (b)(8) | (8) [inserted: ] | |||
| (b)(8)(A) | (A) [inserted: ] | |||
| [inserted: Not later than 1 year after the date of enactment of this paragraph, each State regulatory authority (with respect to each electric utility for which the State has ratemaking authority) and each nonregulated utility shall commence consideration under section 111, or set a hearing date for consideration, with respect to the standard established by paragraph (22) of section 111(d).] | ||||
| (b)(8)(B) | (B) [inserted: ] | |||
| [inserted: Not later than 2 years after the date of enactment of this paragraph, each State regulatory authority (with respect to each electric utility for which the State has ratemaking authority), and each nonregulated electric utility shall complete the consideration and make the determination under section 111 with respect to the standard established by paragraph (22) of section 111(d).] | ||||
| (c) | (c) Failure to comply | (c) Failure to comply | ||
| Each State regulatory authority (with respect to each electric utility for which it has ratemaking authority) and each nonregulated electric utility shall undertake the consideration, and make the determination, referred to in section 2621 of this title with respect to each standard established by section 2621(d) of this title in the first rate proceeding commenced after the date three years after November 9, 1978, respecting the rates of such utility if such State regulatory authority or nonregulated electric utility has not, before such date, complied with subsection (b)(2) with respect to such standard. In the case of each standard established by paragraphs (11) through (13) of section 2621(d) of this title, the reference contained in this subsection to November 9, 1978, shall be deemed to be a reference to August 8, 2005. In the case of the standard established by paragraph (14) of section 2621(d) of this title, the reference contained in this subsection to November 9, 1978, shall be deemed to be a reference to August 8, 2005. In the case of the standard established by paragraph (15) of section 2621(d) of this title, the reference contained in this subsection to November 9, 1978, shall be deemed to be a reference to August 8, 2005. In the case of the standards established by paragraphs (16) through (19) of section 2621(d) of this title, the reference contained in this subsection to November 9, 1978, shall be deemed to be a reference to December 19, 2007. In the case of the standard established by paragraph (20) of section 2621(d) of this title, the reference contained in this subsection to November 9, 1978, shall be deemed to be a reference to November 15, 2021. In the case of the standard established by paragraph (21) of section 2621(d) of this title, the reference contained in this subsection to November 9, 1978, shall be deemed to be a reference to November 15, 2021. | Each State regulatory authority (with respect to each electric utility for which it has ratemaking authority) and each nonregulated electric utility shall undertake the consideration, and make the determination, referred to in section 2621 of this title with respect to each standard established by section 2621(d) of this title in the first rate proceeding commenced after the date three years after November 9, 1978, respecting the rates of such utility if such State regulatory authority or nonregulated electric utility has not, before such date, complied with subsection (b)(2) with respect to such standard. In the case of each standard established by paragraphs (11) through (13) of section 2621(d) of this title, the reference contained in this subsection to November 9, 1978, shall be deemed to be a reference to August 8, 2005. In the case of the standard established by paragraph (14) of section 2621(d) of this title, the reference contained in this subsection to November 9, 1978, shall be deemed to be a reference to August 8, 2005. In the case of the standard established by paragraph (15) of section 2621(d) of this title, the reference contained in this subsection to November 9, 1978, shall be deemed to be a reference to August 8, 2005. In the case of the standards established by paragraphs (16) through (19) of section 2621(d) of this title, the reference contained in this subsection to November 9, 1978, shall be deemed to be a reference to December 19, 2007. In the case of the standard established by paragraph (20) of section 2621(d) of this title, the reference contained in this subsection to November 9, 1978, shall be deemed to be a reference to November 15, 2021. In the case of the standard established by paragraph (21) of section 2621(d) of this title, the reference contained in this subsection to November 9, 1978, shall be deemed to be a reference to November 15, 2021.[inserted: In the case of the standard established by paragraph (22) of section 111(d), the reference contained in this subsection to the date of enactment of this Act shall be deemed to be a reference to the date of enactment of that paragraph (22).] | |||
| (d) | (d) Prior State actions relating to standard under certain paragraphs of section 2621(d) | (d) Prior State actions relating to standard under certain paragraphs of section 2621(d) | ||
| Subsections (b) and (c) of this section shall not apply to the standards established by paragraphs (11) through (13) and paragraphs (16) through (19) of section 2621(d) of this title in the case of any electric utility in a State if, before August 8, 2005— | Subsections (b) and (c) of this section shall not apply to the standards established by paragraphs (11) through (13) and paragraphs (16) through (19) of section 2621(d) of this title in the case of any electric utility in a State if, before August 8, 2005— | |||
| (d)(1) | (1) | (1) | ||
| the State has implemented for such utility the standard concerned (or a comparable standard); | the State has implemented for such utility the standard concerned (or a comparable standard); | |||
§ 2622(h)–(i)
(d)(2)–(h)(1) unchanged
| Where | Mark | The Code now | Mark | As the bill would leave it |
|---|---|---|---|---|
| (h)(2) | (2) | (2) | ||
| the State regulatory authority for the State or the relevant nonregulated electric utility has conducted a proceeding to consider implementation of the standard (or a comparable standard) for the electric utility; or | the State regulatory authority for the State or the relevant nonregulated electric utility has conducted a proceeding to consider implementation of the standard (or a comparable standard) for the electric utility; or | |||
| (h)(3) | (3) | (3) | ||
| the State legislature has voted on the implementation of the standard (or a comparable standard) for the electric utility during the 3-year period ending on November 15, 2021. | the State legislature has voted on the implementation of the standard (or a comparable standard) for the electric utility during the 3-year period ending on November 15, 2021. | |||
| (i) | (i) [inserted: Prior State actions.—] | |||
| [inserted: Subsections (b) and (c) shall not apply to the standard established by paragraph (22) of section 111(d) in the case of any electric utility in a State if, before the date of enactment of this subsection—] | ||||
| (i)(1) | (1) [inserted: ] | |||
| [inserted: the State has implemented for the electric utility the standard (or a comparable standard);] | ||||
| (i)(2) | (2) [inserted: ] | |||
| [inserted: the State regulatory authority for the State or the relevant nonregulated electric utility has conducted a proceeding to consider implementation of the standard (or a comparable standard) for the electric utility; or] | ||||
| (i)(3) | (3) [inserted: ] | |||
| [inserted: the State legislature has voted on the implementation of the standard (or a comparable standard) for the electric utility during the 3-year period ending on that date of enactment.] | ||||
16 U.S.C. § 2634 Prior and pending proceedings
1 change the bill asks for here, 1 carried out
- Carried out:
Section 124 of the Public Utility Regulatory Policies Act of 1978 (16 U.S.C. 2634) is amended by adding at the end the following:
In the case of the standard established by paragraph (22) of section 111(d), the reference contained in this section to the date of enactment of this Act shall be deemed to be a reference to the date of enactment of that paragraph (22).
.
§ 2634
| Where | Mark | The Code now | Mark | As the bill would leave it |
|---|---|---|---|---|
| § 2634. Prior and pending proceedings | § 2634. Prior and pending proceedings | |||
| For purposes of subchapters I and II, and this subchapter, proceedings commenced by State regulatory authorities (with respect to electric utilities for which it has ratemaking authority) and nonregulated electric utilities before November 9, 1978, and actions taken before such date in such proceedings shall be treated as complying with the requirements of subchapters I and II, and this subchapter if such proceedings and actions substantially conform to such requirements. For purposes of subchapters I and II, and this subchapter, any such proceeding or action commenced before November 9, 1978, but not completed before such date, shall comply with the requirements of subchapters I and II, and this subchapter, to the maximum extent practicable, with respect to so much of such proceeding or action as takes place after such date, except as otherwise provided in section 2631(c) of this title. In the case of each standard established by paragraphs (11) through (13) of section 2621(d) of this title, the reference contained in this section to November 9, 1978, shall be deemed to be a reference to August 8, 2005. In the case of the standard established by paragraph (14) of section 2621(d) of this title, the reference contained in this section to November 9, 1978, shall be deemed to be a reference to August 8, 2005. In the case of each standard established by paragraph (15) of section 2621(d) of this title, the reference contained in this section to November 9, 1978, shall be deemed to be a reference to August 8, 2005. In the case of the standard established by paragraph (20) of section 2621(d) of this title, the reference contained in this section to November 9, 1978, shall be deemed to be a reference to November 15, 2021. In the case of the standard established by paragraph (21) of section 2621(d) of this title, the reference contained in this section to November 9, 1978, shall be deemed to be a reference to November 15, 2021. | For purposes of subchapters I and II, and this subchapter, proceedings commenced by State regulatory authorities (with respect to electric utilities for which it has ratemaking authority) and nonregulated electric utilities before November 9, 1978, and actions taken before such date in such proceedings shall be treated as complying with the requirements of subchapters I and II, and this subchapter if such proceedings and actions substantially conform to such requirements. For purposes of subchapters I and II, and this subchapter, any such proceeding or action commenced before November 9, 1978, but not completed before such date, shall comply with the requirements of subchapters I and II, and this subchapter, to the maximum extent practicable, with respect to so much of such proceeding or action as takes place after such date, except as otherwise provided in section 2631(c) of this title. In the case of each standard established by paragraphs (11) through (13) of section 2621(d) of this title, the reference contained in this section to November 9, 1978, shall be deemed to be a reference to August 8, 2005. In the case of the standard established by paragraph (14) of section 2621(d) of this title, the reference contained in this section to November 9, 1978, shall be deemed to be a reference to August 8, 2005. In the case of each standard established by paragraph (15) of section 2621(d) of this title, the reference contained in this section to November 9, 1978, shall be deemed to be a reference to August 8, 2005. In the case of the standard established by paragraph (20) of section 2621(d) of this title, the reference contained in this section to November 9, 1978, shall be deemed to be a reference to November 15, 2021. In the case of the standard established by paragraph (21) of section 2621(d) of this title, the reference contained in this section to November 9, 1978, shall be deemed to be a reference to November 15, 2021.[inserted: In the case of the standard established by paragraph (22) of section 111(d), the reference contained in this section to the date of enactment of this Act shall be deemed to be a reference to the date of enactment of that paragraph (22).] |