H.R. 161 · New Source Review Permitting Improvement Act ·

Reported by committee · step 2 of 5

Sections are cited like “7 U.S.C. § 2012”: 7 of the , 2012.

42 U.S.C. § 7411 Standards of performance for new stationary sources

+8 −1Shown
More for 42 U.S.C. § 7411
Read § 7411Only this section
3 changes the bill asks for here, 3 carried out
  1. Carried out:

    by inserting (A) before The term;

  2. Carried out:

    by inserting before the period at the end the following: . For purposes of the preceding sentence, a change increases the amount of any air pollutant emitted by such source only if the maximum hourly emission rate of an air pollutant that is achievable by such source after the change is higher than the maximum hourly emission rate of such air pollutant that was achievable by such source during any hour in the 10-year period immediately preceding the change; and

  3. Carried out:

    by adding at the end the following:(B) Notwithstanding subparagraph (A), the term “modification” does not include a change at a stationary source that is designed— (i) to reduce the amount of any air pollutant emitted by the source per unit of production; or (ii) to restore, maintain, or improve the reliability …

§ 7411(a)Definitions(3)–(6)

Start of § 7411 to (a)(2) unchanged

WhereMarkThe Code nowMarkAs the bill would leave it
(3)(3) (3)
The term “stationary source” means any building, structure, facility, or installation which emits or may emit any air pollutant. Nothing in subchapter II of this chapter relating to nonroad engines shall be construed to apply to stationary internal combustion engines.The term “stationary source” means any building, structure, facility, or installation which emits or may emit any air pollutant. Nothing in subchapter II of this chapter relating to nonroad engines shall be construed to apply to stationary internal combustion engines.
(4)(4) (4)
The term “modification” means any physical change in, or change in the method of operation of, a stationary source which increases the amount of any air pollutant emitted by such source or which results in the emission of any air pollutant not previously emitted.[inserted: (A) ]The term “modification” means any physical change in, or change in the method of operation of, a stationary source which increases the amount of any air pollutant emitted by such source or which results in the emission of any air pollutant not previously emitted.[inserted: For purposes of the preceding sentence, a change increases the amount of any air pollutant emitted by such source only if the maximum hourly emission rate of an air pollutant that is achievable by such source after the change is higher than the maximum hourly emission rate of such air pollutant that was achievable by such source during any hour in the 10-year period immediately preceding the change.]
(4)(B)(B) [inserted: ]
[inserted: Notwithstanding subparagraph (A), the term “modification” does not include a change at a stationary source that is designed—]
(4)(B)(i)(i) [inserted: ]
[inserted: to reduce the amount of any air pollutant emitted by the source per unit of production; or]
(4)(B)(ii)(ii) [inserted: ]
[inserted: to restore, maintain, or improve the reliability of operations at, or the safety of, the source,]
(4)(B)[inserted: except, with respect to either clause (i) or (ii), when the change would be a modification as defined in subparagraph (A) and the Administrator determines that the increase in the maximum achievable hourly emission rate of a pollutant from such change would cause an adverse effect on human health or the environment.]
(5)(5) (5)
The term “owner or operator” means any person who owns, leases, operates, controls, or supervises a stationary source.The term “owner or operator” means any person who owns, leases, operates, controls, or supervises a stationary source.
(6)(6) (6)
The term “existing source” means any stationary source other than a new source.The term “existing source” means any stationary source other than a new source.

Rest of § 7411 unchanged

42 U.S.C. § 7475 Preconstruction requirements

+13 −0Shown
More for 42 U.S.C. § 7475
Read § 7475Only this section
1 change the bill asks for here, 1 carried out
  1. Carried out:

    Section 165 of the Clean Air Act (42 U.S.C. 7475) is amended by adding at the end the following:(f) Applicability to construction.— (1) In general.— The requirements of subsection (a) that apply with respect to authorizing construction of a major emitting facility shall apply only with respect to construction that involves physical construction of the discrete parts of an …

§ 7475(e)–(f)

Start of § 7475 to (e)(3)(C) unchanged

WhereMarkThe Code nowMarkAs the bill would leave it
(e)(3)(D)(D) (D)
shall specify with reasonable particularity each air quality model or models to be used under specified sets of conditions for purposes of this part.shall specify with reasonable particularity each air quality model or models to be used under specified sets of conditions for purposes of this part.
(e)(3)Any model or models designated under such regulations may be adjusted upon a determination, after notice and opportunity for public hearing, by the Administrator that such adjustment is necessary to take into account unique terrain or meteorological characteristics of an area potentially affected by emissions from a source applying for a permit required under this part.Any model or models designated under such regulations may be adjusted upon a determination, after notice and opportunity for public hearing, by the Administrator that such adjustment is necessary to take into account unique terrain or meteorological characteristics of an area potentially affected by emissions from a source applying for a permit required under this part.
(f)(f) [inserted: Applicability to construction.—]
(f)(1)(1) [inserted: In general.—]
[inserted: The requirements of subsection (a) that apply with respect to authorizing construction of a major emitting facility shall apply only with respect to construction that involves physical construction of the discrete parts of an emissions unit at a major emitting facility, regardless of whether the construction involves other physical on-site activities at the major emitting facility, including any such other physical on-site activity that—]
(f)(1)(A)(A) [inserted: ]
[inserted: may be costly;]
(f)(1)(B)(B) [inserted: ]
[inserted: may significantly alter the site;]
(f)(1)(C)(C) [inserted: ]
[inserted: is permanent in nature; or]
(f)(1)(D)(D) [inserted: ]
[inserted: is to accommodate an installation to an emissions unit.]
(f)(2)(2) [inserted: Definition of emissions unit.—]
[inserted: In this subsection, the term “emissions unit” means any part of a stationary source that emits, or has the potential to emit, any air pollutant that is regulated under this title.]

42 U.S.C. § 7479 Definitions

+1 −1Shown
More for 42 U.S.C. § 7479
Read § 7479Only this section
1 change the bill asks for here, 1 carried out
  1. Carried out:

    Subparagraph (C) of section 169(2) of the Clean Air Act (42 U.S.C. 7479(2)) is amended to read as follows:(C) The term “construction”, when used in connection with a major emitting facility, includes a modification (as defined in section 111(a)) at such facility, except that for purposes of this subparagraph a modification does not include a change at a major emitting facility that …

§ 7479(2)–(4)

Start of § 7479 to (2)(A) unchanged

WhereMarkThe Code nowMarkAs the bill would leave it
(2)(B)(B) (B)
The term “necessary preconstruction approvals or permits” means those permits or approvals, required by the permitting authority as a precondition to undertaking any activity under clauses (i) or (ii) of subparagraph (A) of this paragraph.The term “necessary preconstruction approvals or permits” means those permits or approvals, required by the permitting authority as a precondition to undertaking any activity under clauses (i) or (ii) of subparagraph (A) of this paragraph.
(2)(C)(C) (C)
The term “construction” when used in connection with [struck: any] [struck: source] [struck: or] facility, includes [struck: the] modification (as defined in section [struck: 7411](a) of this [struck: title)] [struck: of] [struck: any] [struck: source] or facility.The term “construction”[inserted: ,] when used in connection with [inserted: a] [inserted: major] [inserted: emitting] facility, includes [inserted: a] modification (as defined in section [inserted: 111](a)[inserted: )] [inserted: at such facility, except that for purposes ]of this [inserted: subparagraph] [inserted: a] [inserted: modification] [inserted: does] [inserted: not include a change at a major emitting facility that does not result in a significant emissions increase, ]or [inserted: a significant net emissions increase, in annual actual emissions at such ]facility.
(3)(3) (3)
The term “best available control technology” means an emission limitation based on the maximum degree of reduction of each pollutant subject to regulation under this chapter emitted from or which results from any major emitting facility, which the permitting authority, on a case-by-case basis, taking into account energy, environmental, and economic impacts and other costs, determines is achievable for such facility through application of production processes and available methods, systems, and techniques, including fuel cleaning, clean fuels, or treatment or innovative fuel combustion techniques for control of each such pollutant. In no event shall application of “best available control technology” result in emissions of any pollutants which will exceed the emissions allowed by any applicable standard established pursuant to section 7411 or 7412 of this title. Emissions from any source utilizing clean fuels, or any other means, to comply with this paragraph shall not be allowed to increase above levels that would have been required under this paragraph as it existed prior to November 15, 1990.The term “best available control technology” means an emission limitation based on the maximum degree of reduction of each pollutant subject to regulation under this chapter emitted from or which results from any major emitting facility, which the permitting authority, on a case-by-case basis, taking into account energy, environmental, and economic impacts and other costs, determines is achievable for such facility through application of production processes and available methods, systems, and techniques, including fuel cleaning, clean fuels, or treatment or innovative fuel combustion techniques for control of each such pollutant. In no event shall application of “best available control technology” result in emissions of any pollutants which will exceed the emissions allowed by any applicable standard established pursuant to section 7411 or 7412 of this title. Emissions from any source utilizing clean fuels, or any other means, to comply with this paragraph shall not be allowed to increase above levels that would have been required under this paragraph as it existed prior to November 15, 1990.
(4)(4) (4)
The term “baseline concentration” means, with respect to a pollutant, the ambient concentration levels which exist at the time of the first application for a permit in an area subject to this part, based on air quality data available in the Environmental Protection Agency or a State air pollution control agency and on such monitoring data as the permit applicant is required to submit. Such ambient concentration levels shall take into account all projected emissions in, or which may affect, such area from any major emitting facility on which construction commenced prior to January 6, 1975, but which has not begun operation by the date of the baseline air quality concentration determination. Emissions of sulfur oxides and particulate matter from any major emitting facility on which construction commenced after January 6, 1975, shall not be included in the baseline and shall be counted against the maximum allowable increases in pollutant concentrations established under this part.The term “baseline concentration” means, with respect to a pollutant, the ambient concentration levels which exist at the time of the first application for a permit in an area subject to this part, based on air quality data available in the Environmental Protection Agency or a State air pollution control agency and on such monitoring data as the permit applicant is required to submit. Such ambient concentration levels shall take into account all projected emissions in, or which may affect, such area from any major emitting facility on which construction commenced prior to January 6, 1975, but which has not begun operation by the date of the baseline air quality concentration determination. Emissions of sulfur oxides and particulate matter from any major emitting facility on which construction commenced after January 6, 1975, shall not be included in the baseline and shall be counted against the maximum allowable increases in pollutant concentrations established under this part.

42 U.S.C. § 7501 Definitions

+1 −1Shown
More for 42 U.S.C. § 7501
Read § 7501Only this section
1 change the bill asks for here, 1 carried out
  1. Carried out:

    Paragraph (4) of section 171 of the Clean Air Act (42 U.S.C. 7501) is amended to read as follows:(4) The terms “modifications” and “modified” mean a modification as defined in section 111(a)(4), except that such terms do not include a change at a major emitting facility that does not result in a significant emissions increase, or a significant net emissions increase, in annual actual emissions at such facility..

§ 7501(3)–(4)

Start of § 7501 to (3)(A) unchanged

WhereMarkThe Code nowMarkAs the bill would leave it
(3)(B)(B) (B)
the most stringent emission limitation which is achieved in practice by such class or category of source, whichever is more stringent.the most stringent emission limitation which is achieved in practice by such class or category of source, whichever is more stringent.
(3)In no event shall the application of this term permit a proposed new or modified source to emit any pollutant in excess of the amount allowable under applicable new source standards of performance.In no event shall the application of this term permit a proposed new or modified source to emit any pollutant in excess of the amount allowable under applicable new source standards of performance.
(4)(4) (4)
The terms “modifications” and “modified” mean [struck: the] [struck: same as the term “]modification[struck: ”] as [struck: used] in section [struck: 7411](a)(4) [struck: of] [struck: this] [struck: title].The terms “modifications” and “modified” mean [inserted: a] modification as [inserted: defined] in section [inserted: 111](a)(4)[inserted: ,] [inserted: except] [inserted: that] [inserted: such terms do not include a change at a major emitting facility that does not result in a significant emissions increase, or a significant net emissions increase, in annual actual emissions at such facility].

42 U.S.C. § 7502 Nonattainment plan provisions in general

+8 −0Shown
More for 42 U.S.C. § 7502
Read § 7502Only this section
1 change the bill asks for here, 1 carried out
  1. Carried out:

    Section 172(c)(5) of the Clean Air Act (42 U.S.C. 7502(c)(5)) is amended by adding at the end the following:(A) may be costly; (B) may significantly alter the site; (C) is permanent in nature; or (D) is to accommodate an installation to an emissions unit. The construction for which a permit is required under this paragraph is construction that involves physical construction of the …

§ 7502(c)Nonattainment plan provisions(4)–(7)

Start of § 7502 to (c)(3) unchanged

WhereMarkThe Code nowMarkAs the bill would leave it
(4)(4) Identification and quantification(4) Identification and quantification
Such plan provisions shall expressly identify and quantify the emissions, if any, of any such pollutant or pollutants which will be allowed, in accordance with section 7503(a)(1)(B) of this title, from the construction and operation of major new or modified stationary sources in each such area. The plan shall demonstrate to the satisfaction of the Administrator that the emissions quantified for this purpose will be consistent with the achievement of reasonable further progress and will not interfere with attainment of the applicable national ambient air quality standard by the applicable attainment date.Such plan provisions shall expressly identify and quantify the emissions, if any, of any such pollutant or pollutants which will be allowed, in accordance with section 7503(a)(1)(B) of this title, from the construction and operation of major new or modified stationary sources in each such area. The plan shall demonstrate to the satisfaction of the Administrator that the emissions quantified for this purpose will be consistent with the achievement of reasonable further progress and will not interfere with attainment of the applicable national ambient air quality standard by the applicable attainment date.
(5)(5) Permits for new and modified major stationary sources(5) Permits for new and modified major stationary sources
Such plan provisions shall require permits for the construction and operation of new or modified major stationary sources anywhere in the nonattainment area, in accordance with section 7503 of this title.Such plan provisions shall require permits for the construction and operation of new or modified major stationary sources anywhere in the nonattainment area, in accordance with section 7503 of this title.
(5)(A)(A) [inserted: ]
[inserted: may be costly;]
(5)(B)(B) [inserted: ]
[inserted: may significantly alter the site;]
(5)(C)(C) [inserted: ]
[inserted: is permanent in nature; or]
(5)(D)(D) [inserted: ]
[inserted: is to accommodate an installation to an emissions unit.]
(6)(6) Other measures(6) Other measures
Such plan provisions shall include enforceable emission limitations, and such other control measures, means or techniques (including economic incentives such as fees, marketable permits, and auctions of emission rights), as well as schedules and timetables for compliance, as may be necessary or appropriate to provide for attainment of such standard in such area by the applicable attainment date specified in this part.Such plan provisions shall include enforceable emission limitations, and such other control measures, means or techniques (including economic incentives such as fees, marketable permits, and auctions of emission rights), as well as schedules and timetables for compliance, as may be necessary or appropriate to provide for attainment of such standard in such area by the applicable attainment date specified in this part.
(7)(7) Compliance with section 7410(a)(2)(7) Compliance with section 7410(a)(2)
Such plan provisions shall also meet the applicable provisions of section 7410(a)(2) of this title.Such plan provisions shall also meet the applicable provisions of section 7410(a)(2) of this title.

Rest of § 7502 unchanged