Skip to content
The People's CodeSearch
Menu

Changes to the Code

H.R. 2093 · To amend the Federal Water Pollution Control Act with respect to permitting terms, and for other purposes. ·

In committee · step 2 of 5

Sections are cited like “7 U.S.C. § 2012”: 7 of the , 2012.

33 U.S.C. § 1342 National pollutant discharge elimination system

+7 −34 of 7 shown
More for 33 U.S.C. § 1342
Read § 1342Only this section
7 changes the bill asks for here, 4 carried out
  1. Carried out:

    Section 402(b)(1)(B) of the Federal Water Pollution Control Act (33 U.S.C. 1342(b)(1)(B)) is amended to read as follows:(B) are for fixed terms— (i) not exceeding 10 years, for a permit issued to a State or municipality; and (ii) not exceeding 5 years, for a permit issued to any person not described in clause (i); and.

  2. Carried out:

    by striking section 402 and inserting this section; and

  3. Carried out:

    by striking federal and inserting Federal; and

  4. Carried out:

    by striking Section and inserting section;

  5. Not carried out:

    by striking 402(p)(6) and inserting subsection (p)(6);

    “402(p)(6)” isn't in § 1342(l)(3)(C) in the Code as we have it. The law may have changed since the bill was drafted.

    Technical detail“402(p)(6)” not found in /us/usc/t33/s1342/l/3/C
  6. Not carried out:

    by striking 402(l)(3)(A), and inserting subparagraph (A),; and

    “402(l)(3)(A),” isn't in § 1342(l)(3)(C) in the Code as we have it. The law may have changed since the bill was drafted.

    Technical detail“402(l)(3)(A),” not found in /us/usc/t33/s1342/l/3/C
  7. Not carried out:

    by striking 402(l)(3)(A). and inserting such subparagraph..

    “402(l)(3)(A).” isn't in § 1342(l)(3)(C) in the Code as we have it. The law may have changed since the bill was drafted.

    Technical detail“402(l)(3)(A).” not found in /us/usc/t33/s1342/l/3/C

§ 1342(b)(1)To issue permits which—(A)–(C)

Start of § 1342 to (b)(1) unchanged ·

(A) apply, and insure compliance with, any applicable requirements of sections 1311, 1312, 1316, 1317, and 1343 of this title;

(B) [inserted: are for fixed terms—]

(i) [inserted: not exceeding 10 years, for a permit issued to a State or municipality; and]

(ii) [inserted: not exceeding 5 years, for a permit issued to any person not described in clause (i); and]

[struck: are for fixed terms not exceeding five years; and]

(C) can be terminated or modified for cause including, but not limited to, the following:

(i) violation of any condition of the permit;

§ 1342(l)–(n)

(b)(1)(C)(ii)–(l)(3) unchanged ·

(A) NPDES permit requirements for silvicultural activities.— The Administrator shall not require a permit under this section nor directly or indirectly require any State to require a permit under this section for a discharge from runoff resulting from the conduct of the following silviculture activities conducted in accordance with standard industry practice: nursery operations, site preparation, reforestation and subsequent cultural treatment, thinning, prescribed burning, pest and fire control, harvesting operations, surface drainage, or road construction and maintenance.

(B) Other requirements.— Nothing in this paragraph exempts a discharge from silvicultural activity from any permitting requirement under section 1344 of this title, existing permitting requirements under [struck: section 1342 of ]this [struck: title][inserted: section], or from any other [struck: federal][inserted: Federal] law.

(C) The authorization provided in [struck: Section][inserted: section] 1365(a) of this title does not apply to any non-permitting program established under 1342(p)(6) of this title for the silviculture activities listed in 1342(l)(3)(A) of this title, or to any other limitations that might be deemed to apply to the silviculture activities listed in 1342(l)(3)(A) of this title.

(m) Additional pretreatment of conventional pollutants not required To the extent a treatment works (as defined in section 1292 of this title) which is publicly owned is not meeting the requirements of a permit issued under this section for such treatment works as a result of inadequate design or operation of such treatment works, the Administrator, in issuing a permit under this section, shall not require pretreatment by a person introducing conventional pollutants identified pursuant to section 1314(a)(4) of this title into such treatment works other than pretreatment required to assure compliance with pretreatment standards under subsection (b)(8) of this section and section 1317(b)(1) of this title. Nothing in this subsection shall affect the Administrator’s authority under sections 1317 and 1319 of this title, affect State and local authority under sections 1317(b)(4) and 1370 of this title, relieve such treatment works of its obligations to meet requirements established under this chapter, or otherwise preclude such works from pursuing whatever feasible options are available to meet its responsibility to comply with its permit under this section.

(n) Partial permit program

Rest of § 1342 unchanged ·

Step through the changes