Changes to the Code
H.R. 2774 · Safeguarding Our Levees Act · Introduced The text as a member of Congress first filed it. Most bills never get further than this.
In committee · step 2 of 5
33 U.S.C. § 701n Emergency response to natural disasters
2 changes the bill asks for here, 2 carried out
- Carried out:
in subsection (a) by adding at the end the following:
(6) Deadline.— Not later than 180 days after receiving from a non-Federal sponsor of a project a request to repair or rehabilitate a flood control work described in paragraph (1), the Secretary shall initiate the repair or restoration of such flood control work.; and
- Carried out:
in subsection (d)(2) by inserting
25 percent of
beforethe difference
.
§ 701n(a)–(b)
Start of § 701n to (a)(5) unchanged ·
(A) Determination.— Not later than 180 days after receiving, from a non-Federal sponsor of a project to repair or rehabilitate a flood control work described in paragraph (1), a request to initiate a feasibility study to further modify the relevant flood control work to provide for an increased level of protection, the Secretary shall provide to the non-Federal sponsor a written decision on whether the Secretary has the authority under section 549a of this title to undertake the requested feasibility study.
(B) Recommendation.— If the Secretary determines under subparagraph (B) that the Secretary does not have the authority to undertake the requested feasibility study, the Secretary shall include the request for a feasibility study in the annual report submitted under section 2282d of this title.
(6) [inserted: Deadline.—] [inserted: Not later than 180 days after receiving from a non-Federal sponsor of a project a request to repair or rehabilitate a flood control work described in paragraph (1), the Secretary shall initiate the repair or restoration of such flood control work.]
(b) Emergency supplies of drinking water; drought; well construction and water transportation
(1) The Secretary, upon a written request for assistance under this paragraph made by any farmer, rancher, or political subdivision within a distressed area, and after a determination by the Secretary that (A) as a result of the drought such farmer, rancher, or political subdivision has an inadequate supply of water, (B) an adequate supply of water can be made available to such farmer, rancher, or political subdivision through the construction of a well, and (C) as a result of the drought such well could not be constructed by a private business, the Secretary, subject to paragraph (3) of this subsection, may enter into an agreement with such farmer, rancher, or political subdivision for the construction of such well.
§ 701n(d)–(e)
(b)(2)–(d)(1) unchanged ·
(C) there is an opportunity to decrease total life cycle rehabilitation costs for the project; and
(2) the non-Federal sponsor agrees to pay [inserted: 25 percent of ]the difference between the cost of repair or restoration to the original design level or original capacity and the cost of achieving the higher level of protection or capacity sought by the non-Federal sponsor.
(e) Notice The Secretary shall notify and consult with the non-Federal sponsor regarding the opportunity to request implementation of nonstructural alternatives to the repair or restoration of a flood control work under subsection (a).