H.R. 2774 · Safeguarding Our Levees Act ·

In committee · step 2 of 5

Sections are cited like “7 U.S.C. § 2012”: 7 of the , 2012.

33 U.S.C. § 701n Emergency response to natural disasters

+3 −1Shown
More for 33 U.S.C. § 701n
Read § 701nOnly this section
2 changes the bill asks for here, 2 carried out
  1. Carried out:

    in subsection (a) by adding at the end the following:(6) Deadline.— Not later than 180 days after receiving from a non-Federal sponsor of a project a request to repair or rehabilitate a flood control work described in paragraph (1), the Secretary shall initiate the repair or restoration of such flood control work.; and

  2. Carried out:

    in subsection (d)(2) by inserting 25 percent of before the difference.

§ 701n(a)–(b)

Start of § 701n to (a)(5) unchanged

WhereMarkThe Code nowMarkAs the bill would leave it
(a)(5)(A)(A) Determination.—(A) Determination.—
Not later than 180 days after receiving, from a non-Federal sponsor of a project to repair or rehabilitate a flood control work described in paragraph (1), a request to initiate a feasibility study to further modify the relevant flood control work to provide for an increased level of protection, the Secretary shall provide to the non-Federal sponsor a written decision on whether the Secretary has the authority under section 549a of this title to undertake the requested feasibility study.Not later than 180 days after receiving, from a non-Federal sponsor of a project to repair or rehabilitate a flood control work described in paragraph (1), a request to initiate a feasibility study to further modify the relevant flood control work to provide for an increased level of protection, the Secretary shall provide to the non-Federal sponsor a written decision on whether the Secretary has the authority under section 549a of this title to undertake the requested feasibility study.
(a)(5)(B)(B) Recommendation.—(B) Recommendation.—
If the Secretary determines under subparagraph (B) that the Secretary does not have the authority to undertake the requested feasibility study, the Secretary shall include the request for a feasibility study in the annual report submitted under section 2282d of this title.If the Secretary determines under subparagraph (B) that the Secretary does not have the authority to undertake the requested feasibility study, the Secretary shall include the request for a feasibility study in the annual report submitted under section 2282d of this title.
(a)(6)(6) [inserted: Deadline.—]
[inserted: Not later than 180 days after receiving from a non-Federal sponsor of a project a request to repair or rehabilitate a flood control work described in paragraph (1), the Secretary shall initiate the repair or restoration of such flood control work.]
(b)(b) Emergency supplies of drinking water; drought; well construction and water transportation(b) Emergency supplies of drinking water; drought; well construction and water transportation
(b)(1)(1) (1)
The Secretary, upon a written request for assistance under this paragraph made by any farmer, rancher, or political subdivision within a distressed area, and after a determination by the Secretary that (A) as a result of the drought such farmer, rancher, or political subdivision has an inadequate supply of water, (B) an adequate supply of water can be made available to such farmer, rancher, or political subdivision through the construction of a well, and (C) as a result of the drought such well could not be constructed by a private business, the Secretary, subject to paragraph (3) of this subsection, may enter into an agreement with such farmer, rancher, or political subdivision for the construction of such well.The Secretary, upon a written request for assistance under this paragraph made by any farmer, rancher, or political subdivision within a distressed area, and after a determination by the Secretary that (A) as a result of the drought such farmer, rancher, or political subdivision has an inadequate supply of water, (B) an adequate supply of water can be made available to such farmer, rancher, or political subdivision through the construction of a well, and (C) as a result of the drought such well could not be constructed by a private business, the Secretary, subject to paragraph (3) of this subsection, may enter into an agreement with such farmer, rancher, or political subdivision for the construction of such well.

§ 701n(d)–(e)

(b)(2)–(d)(1) unchanged

WhereMarkThe Code nowMarkAs the bill would leave it
(d)(1)(C)(C) (C)
there is an opportunity to decrease total life cycle rehabilitation costs for the project; andthere is an opportunity to decrease total life cycle rehabilitation costs for the project; and
(d)(2)(2) (2)
the non-Federal sponsor agrees to pay the difference between the cost of repair or restoration to the original design level or original capacity and the cost of achieving the higher level of protection or capacity sought by the non-Federal sponsor.the non-Federal sponsor agrees to pay [inserted: 25 percent of ]the difference between the cost of repair or restoration to the original design level or original capacity and the cost of achieving the higher level of protection or capacity sought by the non-Federal sponsor.
(e)(e) Notice(e) Notice
The Secretary shall notify and consult with the non-Federal sponsor regarding the opportunity to request implementation of nonstructural alternatives to the repair or restoration of a flood control work under subsection (a).The Secretary shall notify and consult with the non-Federal sponsor regarding the opportunity to request implementation of nonstructural alternatives to the repair or restoration of a flood control work under subsection (a).