Skip to content
The People's CodeSearch
Menu

Title 46 · Shipping

Changes to 46 U.S.C. § 40702

H.R. 3151 · Shipbuilding and Harbor Infrastructure for Prosperity and Security for America Act of 2025 ·

SHIPS for America Act of 2025

In committee · step 2 of 5

Sections are cited like “7 U.S.C. § 2012”: 7 of the , 2012.

46 U.S.C. § 40702 Rate standards

+3 −3Shown
More for 46 U.S.C. § 40702
Read § 40702
3 changes the bill asks for here, 3 carried out
  1. Carried out:

    in the matter preceding paragraph (1), by striking rule, or regulation and inserting rule, regulation, or fare;

  2. Carried out:

    in paragraph (1), by striking rate or charge and inserting rate, charge, or fare; and

  3. Carried out:

    in paragraph (2), by striking rule, or regulation and inserting rule, regulation, or fare;

§ 40702(a)–(b)

WhereMarkThe Code nowMarkAs the bill would leave it
§ 40702. Rate standards§ 40702. Rate standards
(a)(a) Definition.—(a) Definition.—
In this section, the term “constructive costs” means the costs of another carrier, other than a controlled carrier, operating similar vessels and equipment in the same or a similar trade.In this section, the term “constructive costs” means the costs of another carrier, other than a controlled carrier, operating similar vessels and equipment in the same or a similar trade.
(b)(b) Standards.—(b) Standards.—
In determining whether a rate, charge, classification, rule, or [struck: regulation] of a controlled carrier is just and reasonable, the Federal Maritime Commission—In determining whether a rate, charge, classification, rule, [inserted: regulation, ]or [inserted: fare] of a controlled carrier is just and reasonable, the Federal Maritime Commission—
(b)(1)(1) (1)
shall take into account whether the rate or [struck: charge] that has been published or assessed, or that would result from the pertinent classification, rule, or regulation, is below a level that is fully compensatory to the controlled carrier based on the carrier’s actual costs or constructive costs; andshall take into account whether the rate[inserted: ,] [inserted: charge, ]or [inserted: fare] that has been published or assessed, or that would result from the pertinent classification, rule, or regulation, is below a level that is fully compensatory to the controlled carrier based on the carrier’s actual costs or constructive costs; and
(b)(2)(2) (2)
may take into account other appropriate factors, including whether the rate, charge, classification, rule, or [struck: regulation] is—may take into account other appropriate factors, including whether the rate, charge, classification, rule, [inserted: regulation, ]or [inserted: fare] is—
(b)(2)(A)(A) (A)
the same as, or similar to, those published or assessed by other carriers in the same trade;the same as, or similar to, those published or assessed by other carriers in the same trade;
(b)(2)(B)(B) (B)
required to ensure movement of particular cargo in the same trade; orrequired to ensure movement of particular cargo in the same trade; or
(b)(2)(C)(C) (C)
required to maintain acceptable continuity, level, or quality of common carrier service to or from affected ports.required to maintain acceptable continuity, level, or quality of common carrier service to or from affected ports.

Step through the changes