Changes to the Code
H.R. 3168 · National Earthquake Hazards Reduction Program Reauthorization Act of 2025 · Introduced The text as a member of Congress first filed it. Most bills never get further than this.
Reported by committee · step 2 of 5
42 U.S.C. § 7704 National Earthquake Hazards Reduction Program
19 changes the bill asks for here, 15 carried out
- Carried out:
by striking
and local
and insertinglocal, and Tribal
; and - Carried out:
by striking
and constructing
and inserting, designing, constructing, evaluating, and retrofitting
; - Not carried out:
in clause (ii), to read as follows:
(ii) development of standards, guidelines, and voluntary standards, guidelines, and consensus codes for earthquake hazards reduction for buildings, structures, and lifeline infrastructure, including post-earthquake recovery-based performance objectives that address reoccupancy …
We can't read how this instruction is worded yet, so it isn't shown in the text.
Technical detail
no-pattern: to read as follows: QCONTENT; - Carried out:
in clause (iii), by striking
and hazards reduction; and
and insertingfunctional recovery, and other hazards reduction topics;
; and - Carried out:
by inserting
and maintaining
afterpublishing
; and - Carried out:
by inserting
in coordination with the National Tsunami Hazards Mitigation Program, tsunami susceptibility,
afterliquefaction susceptibility,
. - Carried out:
in subclause (V), by inserting
and associated secondary hazards
before the period at the end; and - Carried out:
by adding at the end the following:
(VIII) Coordinating with the Chair of the Federal Communications Commission on the timely broadcasting of emergency alerts generated by the earthquake early warning system..
- Carried out:
Subsection (a)(4)(A) of such section is amended by striking
under paragraph (3)(D)(i)(I)
each place it appears and insertingunder paragraph (3)(D)(ii)(I)
. - Carried out:
by inserting
the Chair of the Scientific Earthquake Studies Advisory Committee and
afterincluding
; and - Carried out:
by striking
and local government
and inserting, local, and Tribal governments
. - Carried out:
in subparagraph (B), by striking
and local
and inserting, local, and Tribal
; - Carried out:
in subparagraph (C), by inserting
, the Chair of the Federal Communications Commission,
afterAgency
; - Carried out:
by redesignating subparagraphs (D) through (K) as subparagraphs (I) through (P), respectively;
- Carried out:
by inserting after subparagraph (C) the following:
(D) coordinate with the Administrator of the National Oceanic and Atmospheric Administration and the Administrator of the Federal Emergency Management Agency on data sharing and resource allocation to support a timely response to oceanic earthquakes and tsunamis; (E) in …
- Carried out:
in subparagraph (I), as redesignated by paragraph (3), by inserting
the Chair of the Federal Communications Commission,
afterAgency,
; - Not carried out:
in subparagraph (L), as redesignated by paragraph (3), by striking
; and
and inserting a semicolon;
The bill points to subparagraph (L) of § 7704(b)(3), which isn't there in the Code as we have it. It may have been renumbered or removed since the bill was drafted.
Technical detail
target not found: no subparagraph (L) in /us/usc/t42/s7704/b/3 - Not carried out:
in subparagraph (M), as redesignated by paragraph (3), by striking the period at the end and inserting a semicolon
;
andThe bill points to subparagraph (M) of § 7704(b)(3), which isn't there in the Code as we have it. It may have been renumbered or removed since the bill was drafted.
Technical detail
target not found: no subparagraph (M) in /us/usc/t42/s7704/b/3 - Not carried out:
in subparagraph (O), as redesignated by paragraph (3), by inserting
maps of natural hazards associated with earthquakes and
afterincluding
.The bill points to subparagraph (O) of § 7704(b)(3), which isn't there in the Code as we have it. It may have been renumbered or removed since the bill was drafted.
Technical detail
target not found: no subparagraph (O) in /us/usc/t42/s7704/b/3
§ 7704(a)(2)Program activities(A)–(D)
Start of § 7704 to (a)(2) unchanged ·
(A) develop effective measures for earthquake hazards reduction;
(B) promote the adoption of earthquake hazards reduction measures by Federal, State, [inserted: local, ]and [struck: local][inserted: Tribal] governments, national standards and model code organizations, architects and engineers, building owners, and others with a role in planning [struck: and][inserted: ,] [inserted: designing, ]constructing[inserted: ,] [inserted: evaluating, and retrofitting ]buildings, structures, and lifeline infrastructure through—
(i) grants, contracts, cooperative agreements, and technical assistance;
(ii) development of standards, guidelines, and voluntary consensus codes for earthquake hazards reduction for buildings, structures, and lifeline infrastructure;
(iii) development and maintenance of a repository of information, including technical data, on seismic risk, community resilience, [inserted: functional recovery, ]and [inserted: other ]hazards reduction[struck: ;] [struck: and][inserted: topics;]
(iv) publishing [inserted: and maintaining ]a systematic set of maps of active faults and folds, liquefaction susceptibility, [inserted: in coordination with the National Tsunami Hazards Mitigation Program, tsunami ]susceptibility[inserted: ,] [inserted: susceptibility ]for earthquake induced landslides, and other seismically induced hazards; and
(C) improve the understanding of earthquakes and their effects on communities, buildings, structures, and lifeline infrastructure, through interdisciplinary research that involves engineering, natural sciences, and social, economic, and decisions sciences; and
(D) continue the development of the Advanced National Seismic System, including earthquake early warning capabilities and the Global Seismographic Network.
§ 7704(a)Establishment(3)–(4)
(a)(3) unchanged ·
(IV) Coordinating with the Interagency Coordinating Committee on Windstorm Impact Reduction and other natural hazards coordination committees as the Director determines appropriate to share data and best practices.
(V) Coordinating with the Administrator of the National Aeronautics and Space Administration and the Administrator of the National Oceanic and Atmospheric Administration on data sharing and resource allocation to ensure judicious use of Government resources and the free-flowing exchange of information related to earthquakes[inserted: and associated secondary hazards].
(VI) Coordinating with the Secretary of Agriculture and the Secretary of the Interior on the use of public lands for earthquake monitoring and research stations, and related data collection.
(VII) Coordinating with the Secretary of Transportation and the Secretary of Housing and Urban Development on the effects of earthquakes on transportation and housing stocks.
(VIII) [inserted: Coordinating with the Chair of the Federal Communications Commission on the timely broadcasting of emergency alerts generated by the earthquake early warning system.]
(iii) Assistance from Secretary of Agriculture and Secretary of the Interior To the extent practicable, the Secretary of Agriculture and the Secretary of the Interior shall expedite any request for a permit to use public land under clause (ii)(VI).
(4) Biennial report
(A) In general Not less frequently than once every two years, the Interagency Coordinating Committee shall submit to the Committee on Commerce, Science, and Transportation, the Committee on Energy and Natural Resources, and the Committee on Homeland Security and Governmental Affairs of the Senate and the Committee on Science, Space, and Technology, the Committee on Energy and Commerce, the Committee on Natural Resources, and the Committee on Homeland Security of the House of Representatives a report on the Program. Such report shall include—
(i) the Program budget for the current fiscal year for each agency that participates in the Program, and for each major goal established for the Program activities under paragraph (3)(D)([struck: i][inserted: ii])(I);
(ii) the proposed Program budget for the next fiscal year for each agency that participates in the Program, and for each major goal established for the Program activities under paragraph (3)(D)([struck: i][inserted: ii])(I); 2
(iii) a description of the activities and results of the Program during the previous year, including an assessment of the effectiveness of the Program in furthering the goals established in the strategic plan under paragraph (3)(D)([struck: i][inserted: ii])(I); 2
(iv) a description of the extent to which the Program has incorporated the recommendations of the Advisory Committee;
(v) a description of activities, including budgets for the current fiscal year and proposed budgets for the next fiscal year, that are carried out by Program agencies and contribute to the Program, but are not included in the Program;
§ 7704(a)Establishment(4)–(5)
(a)(4)(A)(vi)–(vii) unchanged ·
(B) Support for preparation of report Each head of a Program agency shall submit to the Director of the National Institute of Standards and Technology such information as the Director may request for the preparation of a report under subparagraph (A) not later than 90 days after the date on which the Director requests such information.
(5) Advisory Committee
(A) In general The Director shall establish an Advisory Committee on Earthquake Hazards Reduction of at least 11 members, none of whom may be an employee (as defined in subparagraphs (A) through (F) of section 7342(a)(1) of title 5 including [inserted: the Chair of the Scientific Earthquake Studies Advisory Committee and ]representatives of research and academic institutions, industry standards development organizations, State [struck: and][inserted: ,] local[inserted: ,] [struck: government][inserted: and Tribal governments], and financial communities who are qualified to provide advice on earthquake hazards reduction and represent all related scientific, architectural, and engineering disciplines. The recommendations of the Advisory Committee shall be considered by Federal agencies in implementing the Program.
(B) Assessment The Advisory Committee shall assess—
(i) trends and developments in the science and engineering of earthquake hazards reduction;
§ 7704(b)Responsibilities of Program agencies(3)–(4)
(a)(5)(B)(ii)–(b)(3) unchanged ·
(A) conduct a systematic assessment of the seismic risks in each region of the Nation prone to earthquakes, including, where appropriate, the establishment and operation of intensive monitoring projects on hazardous faults, seismic microzonation studies in urban and other developed areas where earthquake risk is determined to be significant, and engineering seismology studies;
(B) work with officials of State [struck: and][inserted: ,] local[inserted: ,] [inserted: and Tribal ]governments to ensure that they are knowledgeable about the specific seismic risks in their areas;
(C) develop standard procedures, in consultation with the Administrator of the Federal Emergency Management Agency[inserted: ,] [inserted: the Chair of the Federal Communications Commission, ]and the Director of the National Institute of Standards and Technology, for issuing earthquake alerts and early warnings;
(D) [inserted: coordinate with the Administrator of the National Oceanic and Atmospheric Administration and the Administrator of the Federal Emergency Management Agency on data sharing and resource allocation to support a timely response to oceanic earthquakes and tsunamis;]
(E) [inserted: in consultation with the Chair of the Federal Communications Commission, ensure that earthquake alerts and early warnings are broadcast as rapidly and reliably as possible, in the predominant languages in the affected region, to ensure maximum warning time for nearby persons;]
(F) [inserted: expand the earthquake early warning system within and to additional high risk hazard areas, including making improvements as practicable to improve detection and increase the time between warning messages and perceptible ground motion;]
(G) [inserted: coordinating with affected State and Tribal governments on earthquake early warning system improvements;]
(H) [inserted: issue earthquake forecasts, when appropriate, for aftershocks associated with significant earthquakes in the United States;]
[struck: (D)] [inserted: (I)] issue when necessary and feasible, and notify the Administrator of the Federal Emergency Management Agency, the [inserted: Chair of the Federal Communications Commission, the ]Director of the National Institute of Standards and Technology, and State and local officials, an alert and an earthquake warning;
[struck: (E)] [inserted: (II)] operate, including the National Earthquake Information Center, a forum for the international exchange of earthquake information which shall—
(i) promote the exchange of information on earthquake research and earthquake preparedness between the United States and other nations;
(ii) maintain a library containing selected reports, research papers, and data produced through the Program;
(iii) answer requests from other nations for information on United States earthquake research and earthquake preparedness programs; and
(iv) direct foreign requests to the agency involved in the Program which is best able to respond to the request;
[struck: (F)] [inserted: (III)] operate a National Seismic System;
[struck: (G)] [inserted: (IV)] support regional seismic networks, which shall complement the National Seismic Network; and 1
[struck: (H)] [inserted: (V)] work with the National Science Foundation, the Federal Emergency Management Agency, and the National Institute of Standards and Technology to develop a comprehensive plan for earthquake engineering research to effectively use existing testing facilities and laboratories (in existence at the time of the development of the plan), upgrade facilities and equipment as needed, and integrate new, innovative testing approaches to the research infrastructure in a systematic manner.6
[struck: (I)] [inserted: (VI)] work with other Program agencies to coordinate Program activities with similar earthquake hazards reduction efforts in other countries, to ensure that the Program benefits from relevant information and advances in those countries;
[struck: (J)] [inserted: (VII)] maintain suitable seismic hazard maps and data in support of building codes for structures and lifeline infrastructure, including additional maps needed for performance-based design approaches; and
[struck: (K)] [inserted: (VIII)] support the Director of the National Institute of Standards and Technology in the completion of programmatic goals.
(4) National Science Foundation
(A) In general The National Science Foundation shall be responsible for funding research on earth sciences to improve the understanding of the causes and behavior of earthquakes, on earthquake engineering, and on human response to earthquakes. In carrying out this paragraph, the Director of the National Science Foundation shall—
Rest of § 7704 unchanged ·