H.R. 3231 · American Energy Act · Introduced The text as a member of Congress first filed it. Most bills never get further than this.
In committee · step 2 of 5
30 U.S.C. § 226 Leasing of oil and gas parcels
2 changes the bill asks for here, 2 carried out
- Carried out:
Section 17(p) of the Mineral Leasing Act (30 U.S.C. 226(p)) is amended by adding at the end the following:
(4) Effect of pending civil action on processing applications for permits to drill.— Pursuant to the requirements of paragraph (2), notwithstanding the existence of any pending civil actions affecting the application or related lease, the Secretary shall process an application …
The section already has a provision under this letter or number, so it would have two.
- Carried out:
Section 17 of the Mineral Leasing Act (30 U.S.C. 226) is further amended by adding at the end the following:
(r) Term of permit To drill.— A permit to drill issued under this section after the date of the enactment of this subsection shall be valid for one four-year term from the date that the permit is approved, or until the lease regarding which the permit is issued expires, whichever occurs first..
This bill puts a provision under a letter or number this section already uses, so the section would have two. The law has probably changed since the bill was written.
§ 226(p)–(r)
Start of § 226 to (p)(3)(B) unchanged ·
(C) Denial of permit If the applicant does not complete the requirements within the period specified in subparagraph (A) or if the applicant does not comply with applicable law, the Secretary shall deny the permit.
(4) Term A permit to drill approved under this subsection shall be valid for a single, non-renewable 4-year period beginning on the date that the permit to drill is approved.
(4) [inserted: Effect of pending civil action on processing applications for permits to drill.—] [inserted: Pursuant to the requirements of paragraph (2), notwithstanding the existence of any pending civil actions affecting the application or related lease, the Secretary shall process an application for a permit to drill or other authorizations or approvals under a valid existing lease, unless a United States Federal court vacated such lease. Nothing in this paragraph shall be construed as providing authority to a Federal court to vacate a lease.]
(q) Commingling of production The Secretary of the Interior shall approve applications allowing for the commingling of production from 2 or more sources (including the area of an oil and gas lease, the area included in a drilling spacing unit, a unit participating area, a communitized area, or non-Federal property) before production reaches the point of royalty measurement regardless of ownership, the royalty rates, and the number or percentage of acres for each source if the applicant agrees to install measurement devices for each source, utilize an allocation method that achieves volume measurement uncertainty levels within plus or minus 2 percent during the production phase reported on a monthly basis, or utilize an approved periodic well testing methodology. Production from multiple oil and gas leases, drilling spacing units, communitized areas, or participating areas from a single wellbore shall be considered a single source. Nothing in this subsection shall prevent the Secretary of the Interior from continuing the current practice of exercising discretion to authorize higher percentage volume measurement uncertainty levels if appropriate technical and economic justifications have been provided.
(r) [inserted: Term of permit To drill.—] [inserted: A permit to drill issued under this section after the date of the enactment of this subsection shall be valid for one four-year term from the date that the permit is approved, or until the lease regarding which the permit is issued expires, whichever occurs first.]