Title 26 · Internal Revenue CodeTaxes

Changes to 26 U.S.C. § 45Y

H.R. 3291 · Certainty for Our Energy Future Act ·

In committee · step 2 of 5

Sections are cited like “7 U.S.C. § 2012”: 7 of the , 2012.

26 U.S.C. § 45Y Clean electricity production credit

+4 −0Shown
More for 26 U.S.C. § 45Y
Read § 45Y
1 change the bill asks for here, 1 carried out
  1. Carried out:

    Section 45Y(d) of the Internal Revenue Code of 1986 is amended by adding at the end the following new paragraphs:(4) Special rule for wind and solar energy.— The term “qualified facility” shall not include any facility used for the generation of electricity using wind or solar energy the construction of which begins after December 31, 2030. (5) Beginning of construction definition.— For …

    The section already has a provision under this letter or number, so it would have two.

This bill puts a provision under a letter or number this section already uses, so the section would have two. The law has probably changed since the bill was written.

§ 45Y(d)–(e)

Start of § 45Y to (d)(4)(B) unchanged ·

(i) uses wind to produce electricity (within the meaning of such term as used in section 45(d)(1), as determined without regard to any requirement under such section with respect to the date on which construction of property begins), or

(ii) uses solar energy to produce electricity (within the meaning of such term as used in section 45(d)(4), as determined without regard to any requirement under such section with respect to the date on which construction of property begins).

(4) [inserted: Special rule for wind and solar energy.—] [inserted: The term “qualified facility” shall not include any facility used for the generation of electricity using wind or solar energy the construction of which begins after December 31, 2030.]

(5) [inserted: Beginning of construction definition.—] [inserted: For purposes of determining when construction begins for purposes of this section, principles similar to those under Notice 2013–29, 2013–20 I.R.B. 1085, and any subsequent guidance clarifying, modifying, or updating such notice, as in effect on January 1, 2025, including the Physical Work Test, Five Percent Safe Harbor, Continuity Requirement, and Continuity Safe Harbor, shall apply.]

(e) Definitions For purposes of this section:

(1) CO2e per KWh The term “CO2e per KWh” means, with respect to any greenhouse gas, the equivalent carbon dioxide (as determined based on global warming potential) per kilowatt hour of electricity produced.

Rest of § 45Y unchanged ·

Step through the changes