Title 26 · Internal Revenue CodeTaxes
Changes to 26 U.S.C. § 48A
H.R. 3338 · MARKET CHOICE Act · Introduced The text as a member of Congress first filed it. Most bills never get further than this.
In committee · step 2 of 5
26 U.S.C. § 48A Qualifying advanced coal project credit
12 changes the bill asks for here, 12 carried out
- Carried out:
Section 48A(e)(1)(G) of the Internal Revenue Code of 1986 is amended by inserting
and 60 percent in the case of an application for a reallocation of credits under subsection (d)(4) with respect to an electrical generating unit in existence on October 3, 2008
afterunder subsection (d)(4)
. - Carried out:
Section 48A(e)(1)(C) of such Code is amended by striking
400 megawatts
and inserting200 megawatts
. - Carried out:
Section 48A(f)(1) of such Code is amended by striking
generation technology if—
and all that follows throughthe unit is designed
and insertinggeneration technology if the unit is designed
. - Carried out:
Section 48A(f) of such Code, as amended by this Act, is amended by adding at the end the following:
In the case of a retrofit of a unit which has undergone a best available control technology analysis after August 8, 2005, with respect to the removal or emissions of any pollutant which is SO2 or NOx, the removal or emissions design level with respect to such pollutant shall be the level determined in such analysis.
. - Carried out:
by striking
Not later than 6 years after the date of enactment of this section, the
and insertingThe
; and - Carried out:
by inserting
and every 6 months thereafter until all credits available under this section have been allowed
afterthe date which is 6 years after the date of enactment of this section
; - Carried out:
by striking
may reallocate credits available under clauses (i) and (ii) of paragraph (3)(B)
and insertingshall reallocate credits remaining available under paragraph (3)
; - Carried out:
by striking
or
at the end of clause (i); and - Carried out:
by striking clause (ii) and inserting the following:
(ii) any applicant for certification which submitted an accepted application has subsequently failed to satisfy the requirements under paragraph (2)(D), or (iii) any certification made pursuant to paragraph (2) has been revoked pursuant to paragraph (2)(E).; and
- Carried out:
by striking
clause (i) or (ii) of paragraph (3)(B)
and insertingparagraph (3)
; - Carried out:
by striking
is authorized to
and insertingshall
; and - Carried out:
by striking
an additional program
and insertingadditional programs
.
§ 48A(d)–(e)
Start of § 48A to (d)(3)(B)(ii) unchanged ·
(iii) $1,250,000,000 for advanced coal-based generation technology projects the application for which is submitted during the period described in paragraph (2)(A)(ii).
(4) Review and redistribution
(A) Review [struck: Not][inserted: The] [struck: later than 6 years after the date of enactment of this section, the ]Secretary shall review the credits allocated under this section as of the date which is 6 years after the date of enactment of this section[inserted: and every 6 months thereafter until all credits available under this section have been allowed].
(B) Redistribution The Secretary [struck: may][inserted: shall] reallocate credits [inserted: remaining ]available under [struck: clauses (i) and (ii) of ]paragraph (3)[struck: (B)] if the Secretary determines that—
(i) there is an insufficient quantity of qualifying applications for certification pending at the time of the review,[struck: or]
(ii) any [inserted: applicant for ]certification [struck: made][inserted: which] [struck: pursuant][inserted: submitted] [struck: to][inserted: an] [struck: paragraph][inserted: accepted] [struck: (2)][inserted: application] has [struck: been][inserted: subsequently] [struck: revoked][inserted: failed] [struck: pursuant ]to [inserted: satisfy the requirements under ]paragraph (2)(D)[inserted: ,] [struck: because the project subject to the certification has been delayed as a result of third party opposition ]or[struck: litigation to the proposed project.]
(iii) [inserted: any certification made pursuant to paragraph (2) has been revoked pursuant to paragraph (2)(E).]
(C) Reallocation If the Secretary determines that credits under [struck: clause (i) or (ii) of ]paragraph (3)[struck: (B)] are available for reallocation pursuant to the requirements set forth in paragraph (2), the Secretary [struck: is][inserted: shall] [struck: authorized to ]conduct [struck: an ]additional [struck: program][inserted: programs] for applications for certification.
(5) Disclosure of allocations The Secretary shall, upon making a certification under this subsection or section 48B(d), publicly disclose the identity of the applicant and the amount of the credit certified with respect to such applicant.
(e) Qualifying advanced coal projects
§ 48A(e)Qualifying advanced coal projects(1)–(2)
(e)(1) unchanged ·
(B) the fuel input for the project, when completed, is at least 75 percent coal;
(C) the project, consisting of one or more electric generation units at one site, will have a total nameplate generating capacity of at least [struck: 400][inserted: 200] megawatts;
(D) the applicant provides evidence that a majority of the output of the project is reasonably expected to be acquired or utilized;
(E) the applicant provides evidence of ownership or control of a site of sufficient size to allow the proposed project to be constructed and to operate on a long-term basis;
(F) the project will be located in the United States; and
(G) in the case of any project the application for which is submitted during the period described in subsection (d)(2)(A)(ii), the project includes equipment which separates and sequesters at least 65 percent (70 percent in the case of an application for reallocated credits under subsection (d)(4)[inserted: and 60 percent in the case of an application for a reallocation of credits under subsection (d])[inserted: (4)] [inserted: with respect to an electrical generating unit in existence on October 3, 2008) ]of such project’s total carbon dioxide emissions.
(2) Requirements for certification For the purpose of subsection (d)(2)(D), a project shall be eligible for certification only if the Secretary determines that—
(A) the applicant for certification has received all Federal and State environmental authorizations or reviews necessary to commence construction of the project; and
§ 48A(e)–(f)
(e)(2)(B)–(3)(B) unchanged ·
(C) give highest priority to projects with the greatest separation and sequestration percentage of total carbon dioxide emissions.
(f) Advanced coal-based generation technology
(1) In general [inserted: For the purpose of this section, an electric generation unit uses advanced coal-based generation technology if the unit is designed to meet the performance requirements in the following table: Performance characteristic: Design level for project: SO2 (percent removal) 99 percent NOx (emissions) 0.07 lbs/MMBTU PM* (emissions) 0.015 lbs/MMBTU Hg (percent removal) 90 percent]
[struck: For the purpose of this section, an electric generation unit uses advanced coal-based generation technology if—]
[struck: (A)] [struck: the unit—]
[struck: (i)] [struck: uses integrated gasification combined cycle technology, or]
[struck: (ii)] [struck: except as provided in paragraph (3), has a design net heat rate of 8530 Btu/kWh (40 percent efficiency), and]
[struck: (B)] [struck: the unit is designed to meet the performance requirements in the following table: Performance characteristic: Design level for project: SO2 (percent removal) 99 percent NOx (emissions) 0.07 lbs/MMBTU PM* (emissions) 0.015 lbs/MMBTU Hg (percent removal) 90 percent]
For purposes of the performance requirement specified for the removal of SO2 in the table contained in subparagraph (B), the SO2 removal design level in the case of a unit designed for the use of feedstock substantially all of which is subbituminous coal shall be 99 percent SO2 removal or the achievement of an emission level of 0.04 pounds or less of SO2 per million Btu, determined on a 30-day average.
(2) Design net heat rate For purposes of this subsection, design net heat rate with respect to an electric generation unit shall—
§ 48A(f)–(g)
(f)(2)(A)–(3)(A) unchanged ·
(B) 6 percentage points for coal of 7,000 to 9,000 Btu, or
(C) 4 percentage points for coal of less than 7,000 Btu.[inserted: In the case of a retrofit of a unit which has undergone a best available control technology analysis after August 8, 2005, with respect to the removal or emissions of any pollutant which is SO2 or NOx, the removal or emissions design level with respect to such pollutant shall be the level determined in such analysis.]
(g) Applicability No use of technology (or level of emission reduction solely by reason of the use of the technology), and no achievement of any emission reduction by the demonstration of any technology or performance level, by or at one or more facilities with respect to which a credit is allowed under this section, shall be considered to indicate that the technology or performance level is—
(1) adequately demonstrated for purposes of section 111 of the Clean Air Act (42 U.S.C. 7411);
Rest of § 48A unchanged ·