H.R. 3474 · Federal Mechanical Insulation Act ·

Reported by committee · step 2 of 5

Sections are cited like “7 U.S.C. § 2012”: 7 of the , 2012.

42 U.S.C. § 8253 Energy and water management requirements

+11 −1Shown
More for 42 U.S.C. § 8253
Read § 8253Only this section
2 changes the bill asks for here, 2 carried out
  1. Carried out:

    Section 543(f)(1) of the National Energy Conservation Policy Act (42 U.S.C. 8253(f)(1)) is amended by adding at the end the following:(I) Mechanical insulation property.— The term “mechanical insulation property” means insulation materials, facings, and accessory products— (i) placed in service— (I) in connection with a mechanical system; and (II) in a manner that meets or exceeds the minimum requirements of …

  2. Carried out:

    Section 543(f)(3)(A) of the National Energy Conservation Policy Act (42 U.S.C. 8253(f)(3)(A)) is amended by inserting , including identification of energy- and water-saving measures (including the installation of mechanical insulation property, if applicable), after a comprehensive energy and water evaluation.

§ 8253(f)Use of energy and water efficiency measures in Federal buildings(1)–(2)

Start of § 8253 to (f)(1)(G)(i) unchanged

WhereMarkThe Code nowMarkAs the bill would leave it
(1)(G)(ii)(ii) (ii)
the primary goal of which is to ensure optimum performance of a facility, in accordance with design or current operating needs, over the useful life of the facility, while meeting building occupancy requirements.the primary goal of which is to ensure optimum performance of a facility, in accordance with design or current operating needs, over the useful life of the facility, while meeting building occupancy requirements.
(1)(H)(H) Retrocommissioning(H) Retrocommissioning
The term “retrocommissioning” means a process of commissioning a facility or system that was not commissioned at the time of construction of the facility or system.The term “retrocommissioning” means a process of commissioning a facility or system that was not commissioned at the time of construction of the facility or system.
(1)(I)(I) [inserted: Mechanical insulation property.—]
[inserted: The term “mechanical insulation property” means insulation materials, facings, and accessory products—]
(1)(I)(i)(i) [inserted: ]
[inserted: placed in service—]
(1)(I)(i)(I)(I) [inserted: ]
[inserted: in connection with a mechanical system; and]
(1)(I)(i)(II)(II) [inserted: ]
[inserted: in a manner that meets or exceeds the minimum requirements of the American Society of Heating, Refrigerating and Air-Conditioning Engineers Standard 90.1, as in effect on the date of enactment of this subparagraph; and]
(1)(I)(ii)(ii) [inserted: ]
[inserted: which result in a reduction in energy loss from the mechanical system.]
(2)(2) Facility energy managers(2) Facility energy managers
(2)(A)(A) In general(A) In general
Each Federal agency shall designate an energy manager responsible for implementing this subsection and reducing energy and water use at each facility that meets criteria under subparagraph (B).Each Federal agency shall designate an energy manager responsible for implementing this subsection and reducing energy and water use at each facility that meets criteria under subparagraph (B).

§ 8253(f)Use of energy and water efficiency measures in Federal buildings(2)–(3)

(f)(2)(B)–(C) unchanged

WhereMarkThe Code nowMarkAs the bill would leave it
(2)(C)(ii)(ii) (ii)
the applicability of the certification of the facility in accordance with the International Organization for Standardization standard numbered 50001 and entitled “Energy Management Systems”.the applicability of the certification of the facility in accordance with the International Organization for Standardization standard numbered 50001 and entitled “Energy Management Systems”.
(3)(3) Energy and water evaluations and commissioning(3) Energy and water evaluations and commissioning
(3)(A)(A) Evaluations(A) Evaluations
Except as provided in subparagraph (B), not later than the date that is 180 days after December 27, 2020, and annually thereafter, each energy manager shall complete, for the preceding calendar year, a comprehensive energy and water evaluation and recommissioning or retrocommissioning for approximately 25 percent of the facilities of the applicable agency that meet the criteria under paragraph (2)(B) in a manner that ensures that an evaluation of each facility is completed not less frequently than once every 4 years.Except as provided in subparagraph (B), not later than the date that is 180 days after December 27, 2020, and annually thereafter, each energy manager shall complete, for the preceding calendar year, a comprehensive energy and water evaluation[inserted: ,] [inserted: including identification of energy- ]and [inserted: water-saving measures (including the installation of mechanical insulation property, if applicable), and ]recommissioning or retrocommissioning for approximately 25 percent of the facilities of the applicable agency that meet the criteria under paragraph (2)(B) in a manner that ensures that an evaluation of each facility is completed not less frequently than once every 4 years.
(3)(B)(B) Exceptions(B) Exceptions
An evaluation and recommissioning or retrocommissioning shall not be required under subparagraph (A) with respect to a facility that, as of the date on which the evaluation and recommissioning or retrocommissioning would occur—An evaluation and recommissioning or retrocommissioning shall not be required under subparagraph (A) with respect to a facility that, as of the date on which the evaluation and recommissioning or retrocommissioning would occur—
(3)(B)(i)(i) (i)
has had a comprehensive energy and water evaluation during the preceding 8-year period;has had a comprehensive energy and water evaluation during the preceding 8-year period;

Rest of § 8253 unchanged