Title 16 · ConservationParks and public lands
Changes to 16 U.S.C. § 2621
H.R. 3628 · State Planning for Reliability and Affordability Act · Referred The text sent to a committee of the other chamber after one chamber passed it.
Passed the House · step 3 of 5
16 U.S.C. § 2621 Consideration and determination respecting certain ratemaking standards
1 change the bill asks for here, 1 carried out
- Carried out:
Section 111(d) of the Public Utility Regulatory Policies Act of 1978 (16 U.S.C. 2621(d)) is amended by adding at the end the following:
(22) Ensuring electric reliability with reliable generation facilities.— (A) In general.— Each State regulated electric utility that employs integrated resource planning shall establish, as part of such integrated resource planning, measures, sufficient to ensure the reliable …
§ 2621(d)Establishment(21)–(22)
Start of § 2621 to (d)(21)(B) unchanged ·
(C) accelerate third-party investment in electric vehicle charging for light-, medium-, and heavy-duty vehicles; and
(D) appropriately recover the marginal costs of delivering electricity to electric vehicles and electric vehicle charging infrastructure.
(22) [inserted: Ensuring electric reliability with reliable generation facilities.—]
(A) [inserted: In general.—] [inserted: Each State regulated electric utility that employs integrated resource planning shall establish, as part of such integrated resource planning, measures, sufficient to ensure the reliable availability of electric energy over a 10-year period, to maintain—]
(i) [inserted: the operation of reliable generation facilities; or]
(ii) [inserted: the procurement of electric energy from reliable generation facilities.]
(B) [inserted: Reliable generation facility defined.—] [inserted: In this paragraph, the term “reliable generation facility” means an electric generation facility that ensures the reliable availability of electric energy by—]
(i) [inserted: having operational characteristics to enable the generation of electric energy on a continuous basis for a period of not fewer than 30 days;]
(ii) [inserted: having—]
(I) [inserted: adequate fuel, or a continuously available energy source, on-site to enable the generation of electric energy on a continuous basis for a period of not fewer than 30 days; or]
(II) [inserted: contractual obligations that ensure adequate fuel supply to achieve the generation of electric energy on a continuous basis for a period of not fewer than 30 days;]
(iii) [inserted: having operational characteristics to enable the generation of electric energy during emergency and severe weather conditions; and]
(iv) [inserted: providing essential services related to the reliable availability of electric energy, including frequency support and voltage support.]