Skip to content
The People's CodeSearch
Menu

Changes to the Code

H.R. 3824 · Reducing Regulatory Burdens Act of 2025 ·

In committee · step 2 of 5

Sections are cited like “7 U.S.C. § 2012”: 7 of the , 2012.

7 U.S.C. § 136a Registration of pesticides

+2 −0Shown
More for 7 U.S.C. § 136a
Read § 136aOnly this section
1 change the bill asks for here, 1 carried out
  1. Carried out:

    Section 3(f) of the Federal Insecticide, Fungicide, and Rodenticide Act (7 U.S.C. 136a(f)) is amended by adding at the end the following:(6) Use of authorized pesticides.— Except as provided in section 402(t) of the Federal Water Pollution Control Act, the Administrator or a State may not require a permit under such Act for a discharge from a point source into navigable waters of a pesticide authorized for sale, …

§ 136a(f)–(g)

Start of § 136a to (f)(5)(E) unchanged

WhereMarkThe Code nowMarkAs the bill would leave it
(f)(5)(F)(F) Reporting(F) Reporting
Not later than 2 years after December 29, 2022, the Administrator shall develop and implement, and make publicly available, a plan for tracking the adoption of the bilingual labeling required under this paragraph.Not later than 2 years after December 29, 2022, the Administrator shall develop and implement, and make publicly available, a plan for tracking the adoption of the bilingual labeling required under this paragraph.
(f)(5)(G)(G) Spanish Translation Guide described(G) Spanish Translation Guide described
The Spanish Translation Guide described in this subparagraph is the Spanish Translation Guide for Pesticide Labeling issued in October 2019, as in effect on December 29, 2022, and any successor guides or amendments to such guide.The Spanish Translation Guide described in this subparagraph is the Spanish Translation Guide for Pesticide Labeling issued in October 2019, as in effect on December 29, 2022, and any successor guides or amendments to such guide.
(f)(6)(6) [inserted: Use of authorized pesticides.—]
[inserted: Except as provided in section 402(t) of the Federal Water Pollution Control Act, the Administrator or a State may not require a permit under such Act for a discharge from a point source into navigable waters of a pesticide authorized for sale, distribution, or use under this Act, or the residue of such a pesticide, resulting from the application of such pesticide.]
(g)(g) Registration review(g) Registration review
(g)(1)(1) General rule(1) General rule
(g)(1)(A)(A) Periodic review(A) Periodic review

Rest of § 136a unchanged

33 U.S.C. § 1342 National pollutant discharge elimination system

+21 −0Shown
More for 33 U.S.C. § 1342
Read § 1342Only this section
1 change the bill asks for here, 1 carried out
  1. Carried out:

    Section 402 of the Federal Water Pollution Control Act (33 U.S.C. 1342) is amended by adding at the end the following:(t) Discharges of pesticides.— (1) No permit requirement.— Except as provided in paragraph (2), a permit shall not be required by the Administrator or a State under this Act for a discharge from a point source into navigable waters of a pesticide authorized for sale, …

§ 1342(s)–(t)

Start of § 1342 to (s)(6) unchanged

WhereMarkThe Code nowMarkAs the bill would leave it
(s)(6)(A)(A) In general(A) In general
Nothing in section 1311(b)(1)(C) of this title precludes a State from authorizing in the water quality standards of the State the issuance of a schedule of compliance to meet water quality-based effluent limitations in permits that incorporate provisions of an integrated plan.Nothing in section 1311(b)(1)(C) of this title precludes a State from authorizing in the water quality standards of the State the issuance of a schedule of compliance to meet water quality-based effluent limitations in permits that incorporate provisions of an integrated plan.
(s)(6)(B)(B) Transition rule(B) Transition rule
In any case in which a discharge is subject to a judicial order or consent decree, as of January 14, 2019, resolving an enforcement action under this chapter, any schedule of compliance issued pursuant to an authorization in a State water quality standard may not revise a schedule of compliance in that order or decree to be less stringent, unless the order or decree is modified by agreement of the parties and the court.In any case in which a discharge is subject to a judicial order or consent decree, as of January 14, 2019, resolving an enforcement action under this chapter, any schedule of compliance issued pursuant to an authorization in a State water quality standard may not revise a schedule of compliance in that order or decree to be less stringent, unless the order or decree is modified by agreement of the parties and the court.
(t)(t) [inserted: Discharges of pesticides.—]
(t)(1)(1) [inserted: No permit requirement.—]
[inserted: Except as provided in paragraph (2), a permit shall not be required by the Administrator or a State under this Act for a discharge from a point source into navigable waters of a pesticide authorized for sale, distribution, or use under the Federal Insecticide, Fungicide, and Rodenticide Act, or the residue of such a pesticide, resulting from the application of such pesticide.]
(t)(2)(2) [inserted: Exceptions.—]
[inserted: Paragraph (1) shall not apply to the following discharges of a pesticide or pesticide residue:]
(t)(2)(A)(A) [inserted: ]
[inserted: A discharge resulting from the application of a pesticide in violation of a provision of the Federal Insecticide, Fungicide, and Rodenticide Act that is relevant to protecting water quality, if—]
(t)(2)(A)(i)(i) [inserted: ]
[inserted: the discharge would not have occurred but for the violation; or]
(t)(2)(A)(ii)(ii) [inserted: ]
[inserted: the amount of pesticide or pesticide residue in the discharge is greater than would have occurred without the violation.]
(t)(2)(B)(B) [inserted: ]
[inserted: Stormwater discharges subject to regulation under subsection (p).]
(t)(2)(C)(C) [inserted: ]
[inserted: The following discharges subject to regulation under this section:]
(t)(2)(C)(i)(i) [inserted: ]
[inserted: Manufacturing or industrial effluent.]
(t)(2)(C)(ii)(ii) [inserted: ]
[inserted: Treatment works effluent.]
(t)(2)(C)(iii)(iii) [inserted: ]
[inserted: Discharges incidental to the normal operation of a vessel, including a discharge resulting from ballasting operations or vessel biofouling prevention.]

Step through the changes