Title 10 · Armed ForcesThe military
Changes to 10 U.S.C. § 2805
H.R. 3838 · Streamlining Procurement for Effective Execution and Delivery and National Defense Authorization Act for Fiscal Year 2026 · Engrossed The official text as one chamber (House or Senate) passed it.
Passed the House · step 3 of 5
10 U.S.C. § 2805 Unspecified minor construction
10 changes the bill asks for here, 5 carried out
- Not carried out:
by striking
shall notify
and insertingshall submit, in an electronic medium pursuant to section 480 of this title, to
;The law already reads this way: § 2805(b)(2) already has “shall submit, in an electronic medium pursuant to section 480 of this title, to”.
Technical detail
already reads “shall submit, in an electronic medium pursuant to section 480 of this title, to” in /us/usc/t10/s2805/b/2 - Not carried out:
by inserting
a notification
afterappropriate committees of Congress
; andThe law already reads this way: § 2805(b)(2) already has “a notification”.
Technical detail
already reads “a notification” at that place in /us/usc/t10/s2805/b/2 - Not carried out:
by striking
, of the justification
and all that follows throughof this title.
and insertingby not later than 90 days after the date on which the Secretary concerned obligates funds for the project. Such notification shall include, with respect to the project, a description, a justification, and an estimation of the total cost to the United States.
.“, of the justification” isn't in § 2805(b)(2) in the Code as we have it. It was there before, as of Public Law 119-36: the law has changed since the bill was written.
Technical detail
“, of the justification” not found in /us/usc/t10/s2805/b/2 - Not carried out:
in paragraph (2) of subsection (b), by striking
$4,000,000
and inserting$6,000,000
;The law already reads this way: § 2805(b)(2) already has “$6,000,000”.
Technical detail
already reads “$6,000,000” in /us/usc/t10/s2805/b/2 - Carried out:
by striking
$9,000,000
each place it appears and inserting$20,000,000
; - Carried out:
in paragraph (3), by inserting
and that costs more than the amount specified in subsection (b)(2)
afterto which this subsection applies
; - Carried out:
by redesignating paragraph (4) as paragraph (6); and
- Carried out:
by inserting after paragraph (3) the following new paragraphs:
(4) (A) The Secretary concerned shall review, on an annual basis, the thresholds for funding specified in this section to determine whether such thresholds should be increased. (B) In making a determination under subparagraph (A), the Secretary of concerned shall consider the …
- Carried out:
by striking subsection (f) and inserting the following:
(f) Adjustment of dollar limitations for location.— During the period beginning on the date of the enactment of the Military Construction Act for Fiscal Year 2026 and ending on September 30, 2028, the Secretary concerned shall adjust the dollar limitations specified in this …
- Not carried out:
Section 2805(g)(5) of title 10, United States Code, is amended by striking
$150,000,000
and inserting$300,000,000
.The bill points to (g) in § 2805, which isn't there in the Code as we have it. It was there before, as of Public Law 119-36: the law has changed since the bill was written.
Technical detail
target not found: no level (g) under /us/usc/t10/s2805
3 of the 10 changes this bill asks for here are already in the law as it stands, and were not made a second time. The bill, or another making the same changes, has probably become law since.
2 of the 10 changes this bill asks for here name words or provisions the section had before but doesn't now: the law has changed since the bill was written, so they are not marked.
§ 2805(d)–(f)
Start of § 2805 to (d) unchanged ·
(1) For the revitalization and recapitalization of laboratories owned by the United States and under the jurisdiction of the Secretary concerned, the Secretary concerned may obligate and expend—
(A) from appropriations available to the Secretary concerned for operation and maintenance, amounts necessary to carry out an unspecified minor military construction project costing not more than $[struck: 9][inserted: 20],000,000, notwithstanding subsection (c); or
(B) from appropriations available to the Secretary concerned for military construction not otherwise authorized by law or from funds authorized to be made available under section 4123(a) of this title, amounts necessary to carry out an unspecified minor military construction project costing not more than $[struck: 9][inserted: 20],000,000.
(2) For purposes of this subsection, an unspecified minor military construction project is a military construction project that (notwithstanding subsection (a)) has an approved cost equal to or less than $[struck: 9][inserted: 20],000,000.
(3) If the Secretary concerned makes a decision to carry out an unspecified minor military construction project to which this subsection applies[inserted: and that costs more than the amount specified in subsection (b)(2)], the Secretary concerned shall notify the appropriate committees of Congress of that decision, of the justification for the project, and of the estimated cost of the project. The project may then be carried out only after the end of the 14-day period beginning on the date the notification is received by the committees in an electronic medium pursuant to section 480 of this title.
(4)
(A) [inserted: The Secretary concerned shall review, on an annual basis, the thresholds for funding specified in this section to determine whether such thresholds should be increased.]
(B) [inserted: In making a determination under subparagraph (A), the Secretary of concerned shall consider the UFC 3-701-01 DoD Facilities Pricing Guide.]
(5) [inserted: If the Secretary concerned makes a decision to increase a threshold for funding specified in this section, the Secretary concerned shall notify the appropriate committees of Congress of such decision and the facts concerning the increase to such threshold. Such increase may take effect only after the end of the 14-day period beginning on the date the notification is received by such appropriate committees of Congress in an electronic medium pursuant to section 480 of this title.]
[struck: (4)] [inserted: (6)] In this subsection, the term “laboratory” includes—
(A) a research, engineering, and development center; and
(B) a test and evaluation activity.
(e) Prohibition on Use for New Housing Units.— Military family housing projects for construction of new housing units may not be carried out under the authority of this section.
(f) Adjustment of [struck: Dollar][inserted: dollar] [struck: Limitations][inserted: limitations] for [struck: Location][inserted: location].— [inserted: During the period beginning on the date of the enactment of the Military Construction Act for Fiscal Year 2026 and ending on September 30, 2028, the Secretary concerned shall adjust the dollar limitations specified in this section applicable to an unspecified minor military construction project to reflect the area construction cost index for military construction projects published by the Department of Defense during the prior fiscal year for the location of the project, except that no limitation specified in this section may exceed $30,000,000 as the result of any adjustment made under this subsection.]
[struck: (1)] [struck: Adjustment of limitations.—] [struck: Each fiscal year, the Secretary concerned shall adjust the dollar limitations specified in this section applicable to an unspecified minor military construction project to reflect the area construction cost index for military construction projects published by the Department of Defense during the prior fiscal year for the location of the project, except that no limitation specified in this section may exceed $14,000,000 as the result of any adjustment made under this paragraph.]
[struck: [(2)] [struck: Repealed. Pub. L. 118–31, div. B, title XXVIII, § 2803(2), Dec. 22, 2023, 137 Stat. 744.]]
[struck: [(3)] [struck: Repealed. Pub. L. 118–31, div. B, title XXVIII, § 2802(c)(2), Dec. 22, 2023, 137 Stat. 743.]]