Title 10 · Armed ForcesThe military
Changes to 10 U.S.C. § 2864
H.R. 3838 · Streamlining Procurement for Effective Execution and Delivery and National Defense Authorization Act for Fiscal Year 2026 · Engrossed The official text as one chamber (House or Senate) passed it.
Passed the House · step 3 of 5
10 U.S.C. § 2864 Master plans for major military installations
2 changes the bill asks for here, 1 carried out
- Carried out:
by striking subsection (e); and
- Not carried out:
by redesignating subsection (f) as subsection (e).
The bill points to subsection (f) of § 2864, which isn't there in the Code as we have it. It was there before, as of Public Law 119-36: the law has changed since the bill was written.
Technical detail
no subsection (f) in /us/usc/t10/s2864
1 of the 2 changes this bill asks for here names words or provisions the section had before but doesn't now: the law has changed since the bill was written, so it is not marked.
§ 2864(c)–(e)
Start of § 2864 to (c)(7) unchanged ·
(8) Projections from recognized governmental and scientific entities such as the Census Bureau, the National Academies of Sciences, the United States Geological Survey, and the United States Global Change Research Office (or any similar successor entities) with respect to future risks and threats (including the risks and threats described in paragraph (1)) to the resilience of any project considered in the installation master plan during the 50-year lifespan of the installation.
(d) Report.— Not later than March 1 of each year, the Secretary of Defense shall submit to the congressional defense committees a report listing all master plans completed pursuant to this section in the prior calendar year.
[struck: (e)] [struck: Definitions.—] [struck: In this section:]
[struck: (1)] [struck: The term “major military installation” has the meaning given to the term “large site” in the most recent version of the Department of Defense Base Structure Report issued before the time interval prescribed for development of installation master plans arises under subsection (a).]
[struck: (2)] [struck: The terms “metropolitan planning area” and “metropolitan planning organization” have the meanings given those terms in section 134(b) of title 23 and section 5303(b) of title 49.]
[struck: (3)] [struck: The term “energy and climate resiliency” means anticipation, preparation for, and adaptation to utility disruptions and changing environmental conditions and the ability to withstand, respond to, and recover rapidly from utility disruptions while ensuring the sustainment of mission-critical operations.]
[struck: (4)] [struck: The term “military installation resilience” has the meaning given that term in section 101(e)1 of this title.]