Title 10 · Armed ForcesThe military
Changes to 10 U.S.C. § 3241
H.R. 3838 · Streamlining Procurement for Effective Execution and Delivery and National Defense Authorization Act for Fiscal Year 2026 · Engrossed The official text as one chamber (House or Senate) passed it.
Passed the House · step 3 of 5
10 U.S.C. § 3241 Design-build selection procedures
3 changes the bill asks for here, 1 carried out
- Not carried out:
in paragraph (1), by striking
The Secretary
and insertingSubject to paragraph (4), each Secretary
;The law already reads this way: § 3241(f)(1) already has “Subject to paragraph (4), each Secretary”.
Technical detail
already reads “Subject to paragraph (4), each Secretary” in /us/usc/t10/s3241/f/1 - Not carried out:
in paragraph (2), by striking
Any military construction contract
and insertingAny construction contract for a military construction project
;The law already reads this way: § 3241(f)(2) already has “Any construction contract for a military construction project”.
Technical detail
already reads “Any construction contract for a military construction project” in /us/usc/t10/s3241/f/2 - Carried out:
by amending paragraphs (3) and (4) to read as follows:
(3) Not later than March 1, 2027, and annually thereafter, the Secretary of Defense shall submit to the congressional defense committees a report on the use of the authority under this subsection that includes the following: (A) A description of the military construction project …
2 of the 3 changes this bill asks for here are already in the law as it stands, and were not made a second time. The bill, or another making the same changes, has probably become law since.
§ 3241(f)–(g)
Start of § 3241 to (f)(1) unchanged
| Where | Mark | Text |
|---|---|---|
| (f)(2) | (2) | |
| Any construction contract for a military construction project that provides for an accelerated design effort, as authorized by paragraph (1), shall include as a condition of the contract that the liability of the United States in a termination for convenience before funds are first made available for construction may not exceed an amount attributable to the final design of the project. | ||
| (f)(3) | (3) | |
| Not later than March 1, | ||
| Not later than March 1, [inserted: 2027], and annually thereafter, the Secretary of Defense shall submit to the congressional defense committees a report on the use of the authority under this subsection that includes the following: | ||
| (f)(3)(A) | (A) | |
| A description of the military construction project for which such authority was used, including project title, location, scope, and rationale for selecting such project. | ||
| (f)(3)(B) | (B) | |
| The date of award of a contract for such military construction project, the initial estimated contract value, and the current projected total cost of such project. | ||
| (f)(3)(C) | (C) | |
| A comparison of projected schedule for completion of such project with the actual schedule, including dates for completing the design of such project and commencing construction. | ||
| (f)(3)(D) | (D) | |
| Any realized or anticipated cost savings or efficiencies, including those related to time, resources, or design innovation, attributable to the use of the authority under this subsection for a military construction project. | ||
| Any realized or anticipated cost savings or efficiencies, including those related to time, resources, or design innovation, attributable to the use of the [inserted: use of the ]authority under this subsection for a military construction project. | ||
| (f)(3)(E) | (E) | |
| An assessment of risk management benefits, including | ||
| An assessment of risk management benefits, including [inserted: changes] in [inserted: scope, ]design flexibility[inserted: ,] or coordination [inserted: improvements ]between [inserted: contractor] and the Secretary [inserted: of a military department with jurisdiction over the military construction project for which such authority was used]. | ||
| (f)(3)(F) | (F) | |
| Any challenges encountered, and mitigation efforts made, in the use | ||
| Any challenges encountered, and mitigation efforts made, in the use such authority for [inserted: the] military construction project. | ||
| (f)(4) | (4) | |
| Each Secretary | ||
| Each Secretary [inserted: of] [inserted: a military department ]may exercise the authority under this subsection using amounts appropriated for such purpose on or after the date of the enactment of [inserted: the] [inserted: National Defense Authorization Act for Fiscal Year 2026]. | ||
| (g) | (g) Authorization of Progressive Design-build Contracts.— | |
| (g)(1) | (1) | |
| Notwithstanding subsections (b) through (e), the Secretary concerned may enter into a progressive design-build contract for a military construction project under the authority of subsection (a) in accordance with the following requirements: |
Rest of § 3241 unchanged