Changes to 10 U.S.C. § 4322

H.R. 3838 · Streamlining Procurement for Effective Execution and Delivery and National Defense Authorization Act for Fiscal Year 2026 ·

Passed the House · step 3 of 5

Sections are cited like “7 U.S.C. § 2012”: 7 of the , 2012.

10 U.S.C. § 4322 Life-cycle management and product support New section

+83 −04 of 5 shown
More for 10 U.S.C. § 4322
Every bill that would add § 4322
5 changes the bill asks for here, 4 carried out
  1. Carried out:

    Chapter 323 of title 10, United States Code, as amended by subsection (a), is further amended by inserting after section 4321 the following new section: 4322. Life-cycle management and product support (a) In general.— The Secretary of Defense shall ensure that each covered system is supported by a life-cycle sustainment plan— (1) that is approved by the senior acquisition executive responsible for such covered system; and (2) that meets applicable operational readiness requirements and materiel readiness objectives (established under section 118(c) of this title) in the most cost-effective manner practicable. (b) Product support manager.— The Secretary of Defense shall designate a product support manager (as defined in section 1733 of this title) to serve under the supervision of a program manager for each covered system. (c) Life-cycle sustainment plan.— (1) A product support manager shall develop, update, and implement a life-cycle sustainment plan for each covered system for which the product support manager is responsible. Such plan shall include the following: (A) A comprehensive product support strategy to best achieve operational readiness requirements and materiel readiness objectives throughout the planned life cycle of such system. (B) A life-cycle cost estimate for the covered system that— (i) is based on the planned product support strategy described in subparagraph (A); and (ii) if the covered system is a major defense acquisition program or major subprogram, is developed in accordance with the requirements to support a Milestone A approval (as defined in section 4251(e) of this title), Milestone B approval, or Milestone C approval (as such terms are defined in section 4172(e) of this title). (C) Recommended engineering and design considerations that support cost-effective sustainment of the covered system and best value solutions in life cycle planning and management. (D) An intellectual property management plan for product support developed in accordance with section 3774 of this title. (E) A strategy to maximize use of public and private sector capabilities to establish Government-private partnerships— (i) with appropriate incentives for each partner to contribute to the achievement of operational readiness requirements and materiel readiness objectives in the most cost-effective manner practicable; and (ii) that considers the roles of each partner as the covered system transitions from acquisition, development, production, fielding, sustainment, and disposal. (F) A plan to transition the covered system from production to initial fielding that addresses specific products or services required for successful initial fielding of the covered system, including— (i) a description of the necessary tooling or other unique support equipment, requirements for initial spare parts and components, technical handbooks and maintenance manuals, maintenance training, and facilities; (ii) an identification of the funding required to provide such products and services for any initial fielding location of the covered system; (iii) an identification of any procurement line, program element, or subactivity group in the budget of the Secretary concerned associated with such products or services; (iv) the timeline for delivery of such products and services; and (v) an assessment of any reduction in operational readiness requirements and materiel readiness objectives if such products and services are not provided in accordance with clause (iv). (2) In developing each life-cycle sustainment plan required by this section, the product support manager shall consider the following: (A) Affordability constraints and key cost factors that could affect operating and support costs during the life cycle of the covered system. (B) Sustainment risks or challenges to sustaining the covered system in operational environments, included contested logistics environments (as defined in section 2926 of this title). (C) Compliance with— (i) requirements to maintain a core logistics capability under section 2464 of this title; and (ii) limitations on the performance of depot-level maintenance of materiel under section 2466 of this title. (D) A defense industrial base strategy to maintain a robust, resilient, and innovative defense industrial base to support requirements throughout the life cycle of the covered system. (d) Continuous assessment and active management.— In carrying out the duties of this section and section 1733 of this title, the product support manager shall— (1) continuously assess and actively manage performance of each covered system for which the product support manager is responsible against the life-cycle sustainment plan for such covered system; and (2) as appropriate, integrate commercial best practices, use commercial standards, and use advanced technologies to enhance the product support of each covered system. (e) Recommendations.— (1) The product support manager shall recommend changes to the product support strategy required under subsection (c)(1)(A) of a covered system to the program manager responsible for such covered system to meet the requirements of subsection (a). (2) The program manager shall provide to the senior acquisition executive responsible for a covered system any recommendations for such covered system made under paragraph (1) that the program manager did not implement along with the rationale for not implementing such recommendations. (f) Definitions.— In this section: (1) The term covered system means— (A) a major defense acquisition program as defined in section 4201 of this title; (B) a major subprogram as described in section 4203 of this title; or (C) an acquisition program or project that is carried out using the rapid fielding or rapid prototyping acquisition pathway under section 3602 of this title that is estimated by the Secretary of Defense to require an eventual total expenditure described in section 4201(a)(2) of this title. (2) The term operational readiness means the capability of a unit of the armed forces, vessel, weapon system, or equipment to perform the missions or functions for which it is organized or designed. (3) The term product support means the set of support functions, as determined by the product support manager, required to field and maintain the readiness and operational capability of a covered system, or a subsystem or component of a covered system..

  2. Carried out:

    by striking A plan and inserting After consideration of the views received by the milestone decision authority from appropriate materiel, logistics, or fleet representatives, a plan;

  3. Carried out:

    by redesignating clauses (iii) through (v) as clauses (iv) through (vi), respectively;

  4. Carried out:

    by inserting after clause (ii) the following new clause:(iii) an assessment as to the required number of training simulators, including the initial operational capability and overall fielding of such simulators;; and

  5. Not carried out:

    in clause (vi) (as so redeisgnated), by striking in accordance with clause (iv) and inserting in accordance with clause (v).

    We can't read how this instruction is worded yet, so it isn't shown in the text.

    Technical detailno-pattern: striking QTEXT and inserting in QTEXT.

§ 4322(a)–(f)

§ 4322. [inserted: Life-cycle management and product support]

(a) [inserted: In general.—] [inserted: The Secretary of Defense shall ensure that each covered system is supported by a life-cycle sustainment plan—]

(1) [inserted: that is approved by the senior acquisition executive responsible for such covered system; and]

(2) [inserted: that meets applicable operational readiness requirements and materiel readiness objectives (established under section 118(c) of this title) in the most cost-effective manner practicable.]

(b) [inserted: Product support manager.—] [inserted: The Secretary of Defense shall designate a product support manager (as defined in section 1733 of this title) to serve under the supervision of a program manager for each covered system.]

(c) [inserted: Life-cycle sustainment plan.—]

(1) [inserted: A product support manager shall develop, update, and implement a life-cycle sustainment plan for each covered system for which the product support manager is responsible. Such plan shall include the following:]

(A) [inserted: A comprehensive product support strategy to best achieve operational readiness requirements and materiel readiness objectives throughout the planned life cycle of such system.]

(B) [inserted: A life-cycle cost estimate for the covered system that—]

(i) [inserted: is based on the planned product support strategy described in subparagraph (A); and]

(ii) [inserted: if the covered system is a major defense acquisition program or major subprogram, is developed in accordance with the requirements to support a Milestone A approval (as defined in section 4251(e) of this title), Milestone B approval, or Milestone C approval (as such terms are defined in section 4172(e) of this title).]

(C) [inserted: Recommended engineering and design considerations that support cost-effective sustainment of the covered system and best value solutions in life cycle planning and management.]

(D) [inserted: An intellectual property management plan for product support developed in accordance with section 3774 of this title.]

(E) [inserted: A strategy to maximize use of public and private sector capabilities to establish Government-private partnerships—]

(i) [inserted: with appropriate incentives for each partner to contribute to the achievement of operational readiness requirements and materiel readiness objectives in the most cost-effective manner practicable; and]

(ii) [inserted: that considers the roles of each partner as the covered system transitions from acquisition, development, production, fielding, sustainment, and disposal.]

(F) [inserted: After consideration of the views received by the milestone decision authority from appropriate materiel, logistics, or fleet representatives, a plan to transition the covered system from production to initial fielding that addresses specific products or services required for successful initial fielding of the covered system, including—]

(i) [inserted: a description of the necessary tooling or other unique support equipment, requirements for initial spare parts and components, technical handbooks and maintenance manuals, maintenance training, and facilities;]

(ii) [inserted: an identification of the funding required to provide such products and services for any initial fielding location of the covered system;]

(iii) [inserted: an assessment as to the required number of training simulators, including the initial operational capability and overall fielding of such simulators;]

(iv) [inserted: an identification of any procurement line, program element, or subactivity group in the budget of the Secretary concerned associated with such products or services;]

(v) [inserted: the timeline for delivery of such products and services; and]

(vi) [inserted: an assessment of any reduction in operational readiness requirements and materiel readiness objectives if such products and services are not provided in accordance with clause (iv).]

(2) [inserted: In developing each life-cycle sustainment plan required by this section, the product support manager shall consider the following:]

(A) [inserted: Affordability constraints and key cost factors that could affect operating and support costs during the life cycle of the covered system.]

(B) [inserted: Sustainment risks or challenges to sustaining the covered system in operational environments, included contested logistics environments (as defined in section 2926 of this title).]

(C) [inserted: Compliance with—]

(i) [inserted: requirements to maintain a core logistics capability under section 2464 of this title; and]

(ii) [inserted: limitations on the performance of depot-level maintenance of materiel under section 2466 of this title.]

(D) [inserted: A defense industrial base strategy to maintain a robust, resilient, and innovative defense industrial base to support requirements throughout the life cycle of the covered system.]

(d) [inserted: Continuous assessment and active management.—] [inserted: In carrying out the duties of this section and section 1733 of this title, the product support manager shall—]

(1) [inserted: continuously assess and actively manage performance of each covered system for which the product support manager is responsible against the life-cycle sustainment plan for such covered system; and]

(2) [inserted: as appropriate, integrate commercial best practices, use commercial standards, and use advanced technologies to enhance the product support of each covered system.]

(e) [inserted: Recommendations.—]

(1) [inserted: The product support manager shall recommend changes to the product support strategy required under subsection (c)(1)(A) of a covered system to the program manager responsible for such covered system to meet the requirements of subsection (a).]

(2) [inserted: The program manager shall provide to the senior acquisition executive responsible for a covered system any recommendations for such covered system made under paragraph (1) that the program manager did not implement along with the rationale for not implementing such recommendations.]

(f) [inserted: Definitions.—] [inserted: In this section:]

(1) [inserted: The term “covered system” means—]

(A) [inserted: a major defense acquisition program as defined in section 4201 of this title;]

(B) [inserted: a major subprogram as described in section 4203 of this title; or]

(C) [inserted: an acquisition program or project that is carried out using the rapid fielding or rapid prototyping acquisition pathway under section 3602 of this title that is estimated by the Secretary of Defense to require an eventual total expenditure described in section 4201(a)(2) of this title.]

(2) [inserted: The term “operational readiness” means the capability of a unit of the armed forces, vessel, weapon system, or equipment to perform the missions or functions for which it is organized or designed.]

(3) [inserted: The term “product support” means the set of support functions, as determined by the product support manager, required to field and maintain the readiness and operational capability of a covered system, or a subsystem or component of a covered system.]