Sections are cited like “7 U.S.C. § 2012”: Title One of the 54 subject areas the Code is divided into, such as Title 7 (Agriculture) or Title 26 (taxes). A title is split into chapters. 7 of the U.S.C. (United States Code) The United States Code: the federal laws in force, arranged by subject. "4 U.S.C. § 8" means title 4, section 8., Section (§) The basic unit of the Code, marked §. Each section has a number within its title and is cited like "7 U.S.C. § 2012". 2012.
[struck: the extent to which requirements for system performance are likely to evolve during the life cycle of the system because of evolving technology, threat, or interoperability needs; and]
[struck: for requirements that are expected to evolve, the minimum acceptable capability that is necessary for initial operating capability of the major defense acquisition program.]
[struck: The Director of Cost Assessment and Performance Evaluation, in formulating study guidance for analyses of alternatives for major defense acquisition programs and performing such analyses under section 139a(d)(4) of this title, shall ensure that any such analysis for a major defense acquisition program includes consideration of evolutionary acquisition, prototyping, and a modular open system approach.]
[struck: In the case of a major defense acquisition program that uses a modular open system approach, the acquisition strategy required under section 4211 of this title shall—]
[struck: differentiate between the major system platform and major system components being developed under the program, as well as major system components developed outside the program that will be integrated into the major defense acquisition program;]
[struck: clearly describe how intellectual property and related issues, such as technical data deliverables, that are necessary to support a modular open system approach, will be addressed; and]
[struck: The milestone decision authority for a major defense acquisition program that uses a modular open system approach shall ensure that a request for proposals for the development or production phases of the program shall describe the modular open system approach and the minimum set of major system components that must be included in the design of the major defense acquisition program.]
[struck: A major defense acquisition program may not receive Milestone B approval under section 4252 of this title until the milestone decision authority determines in writing—]
[struck: the program incorporates clearly defined major system interfaces between the major system platform and major system components, between major system components, and between major system platforms;]
[struck: the Government has arranged to obtain appropriate and necessary intellectual property rights with respect to such major system interfaces upon completion of the development of the major system platform; or]
[struck: in the case of a program that does not use a modular open system approach, that the use of a modular open system approach is not practicable.]