Skip to content
The People's CodeSearch
Menu

Title 10 · Armed ForcesThe military

Changes to 10 U.S.C. § 4865

H.R. 3838 · Streamlining Procurement for Effective Execution and Delivery and National Defense Authorization Act for Fiscal Year 2026 ·

Passed the House · step 3 of 5

Sections are cited like “7 U.S.C. § 2012”: 7 of the , 2012.

10 U.S.C. § 4865 Prohibition on acquisition of advanced batteries composed of materials from certain foreign sources

+54 −47Shown
More for 10 U.S.C. § 4865
Read § 4865
1 change the bill asks for here, 1 carried out
  1. Carried out:

    Subchapter II of chapter 385 of title 10, United States Code, is amended by adding at the end the following new section: 4865. Prohibition on acquisition of advanced batteries composed of materials from certain foreign sources (a) In general.— Beginning on January 1, 2027, and except as provided by subsection (b), the Secretary of Defense may acquire an advanced battery for use at installations of the Department of Defense or in systems of the Department, or obtain any equipment, system, or service that uses covered battery equipment or services as a substantial or essential component of any system or as critical technology as part of any system, only if— (1) more than 95 percent of the electrode active material in each battery cell comprising such advanced battery is composed of materials from sources other than sources that are, or are in geographic areas that are, owned by, controlled by, or subject to the jurisdiction of foreign entities of concern; (2) such advanced battery is not a battery described in section 154(a) of the National Defense Authorization Act for Fiscal Year 2024 (Public Law 118–31; 10 U.S.C. 4651 note prec.); and (3) each such battery cell is manufactured without technology licensed from a foreign entity of concern or any subsidiary, successor, or affiliate of a foreign entity of concern under a licensing agreement that— (A) limits the duration of the use of such technology; or (B) requires— (i) any ownership of the manufacturer of such battery cell by a foreign entity of concern or any subsidiary, successor, or affiliate of a foreign entity of concern; or (ii) any partnership or technology transfer between such manufacturer and a foreign entity of concern or any subsidiary, successor, or affiliate of a foreign entity of concern. (b) Exceptions.— (1) Waiver.— (A) In general.— The Secretary of a military department may waive subsection (a) with respect to an acquisition of an advanced battery if the Secretary— (i) determines in writing that such acquisition is necessary to the national security interest of the United States; and (ii) implements a strategy to eliminate such necessity. (B) Delegation.— The Secretary of a military department may delegate the written determination required under subparagraph (A)(i) only as follows: (i) To the head of a contracting activity for the relevant component for a waiver for a single acquisition program. (ii) To the senior acquisition executive of a military department for a waiver for multiple programs within such military department. (iii) To the Undersecretary of Defense for Acquisition and Sustainment for a waiver for more than one military department. (C) Contents.— The written determination required under subparagraph (A)(i) with respect to a waiver for the acquisition of an advanced battery shall include— (i) the reason such waiver is required; (ii) a list of each weapon system or end item for which such advanced battery is being acquired under such waiver; (iii) the duration of such wavier; and (iv) a timeline for implementing the strategy described in subparagraph (A)(ii). (2) Personal electronics.— Subsection (a) does not apply with respect to the acquisition of an advanced battery for use in personal electronics, including cell phones and laptops, intended for office or administrative purposes. (3) Testing and evaluation.— Subsection (a) does not apply with respect to the acquisition of an advanced battery for which testing and evaluation under a program of record of the Department of Defense begins prior to January 1, 2027. (c) Definitions.— In this section: (1) The terms advanced battery and foreign entity of concern have the meanings given such terms, respectively, under section 40207(a) of the Infrastructure Investment and Jobs Act (42 U.S.C. 18741(a)). (2) The term battery cell means the smallest individual component of a battery capable of converting chemical energy into electrical energy. (3) The term electrode active materials means cathode materials, anode materials, anode foils, and other electrochemically active materials including solvents, additives, and electrolyte salts that contribute to the electrochemical processes necessary for energy storage in a battery..

§ 4865(a)–(e)

§ 4865. Prohibition on acquisition of advanced batteries composed of materials from certain foreign sources

(a) In [struck: General][inserted: general].— [inserted: Beginning on January 1, 2027, and except as provided by subsection (b), the Secretary of Defense may acquire an advanced battery for use at installations of the Department of Defense or in systems of the Department, or obtain any equipment, system, or service that uses covered battery equipment or services as a substantial or essential component of any system or as critical technology as part of any system, only if—]

(1) [inserted: more than 95 percent of the electrode active material in each battery cell comprising such advanced battery is composed of materials from sources other than sources that are, or are in geographic areas that are, owned by, controlled by, or subject to the jurisdiction of foreign entities of concern;]

(2) [inserted: such advanced battery is not a battery described in section 154(a) of the National Defense Authorization Act for Fiscal Year 2024 (Public Law 118–31; 10 U.S.C. 4651 note prec.); and]

(3) [inserted: each such battery cell is manufactured without technology licensed from a foreign entity of concern or any subsidiary, successor, or affiliate of a foreign entity of concern under a licensing agreement that—]

(A) [inserted: limits the duration of the use of such technology; or]

(B) [inserted: requires—]

(i) [inserted: any ownership of the manufacturer of such battery cell by a foreign entity of concern or any subsidiary, successor, or affiliate of a foreign entity of concern; or]

(ii) [inserted: any partnership or technology transfer between such manufacturer and a foreign entity of concern or any subsidiary, successor, or affiliate of a foreign entity of concern.]

[struck: The Secretary of Defense shall procure advanced batteries and cells whose functional cell components and technology, whether as end items or embedded within warfighting and support systems, are not owned, sourced, refined, or produced from a foreign entity of concern.]

(b) [struck: Applicability][inserted: Exceptions].—

(1) [inserted: Waiver.—]

(A) [inserted: In general.—] [inserted: The Secretary of a military department may waive subsection (a) with respect to an acquisition of an advanced battery if the Secretary—]

(i) [inserted: determines in writing that such acquisition is necessary to the national security interest of the United States; and]

(ii) [inserted: implements a strategy to eliminate such necessity.]

(B) [inserted: Delegation.—] [inserted: The Secretary of a military department may delegate the written determination required under subparagraph (A)(i) only as follows:]

(i) [inserted: To the head of a contracting activity for the relevant component for a waiver for a single acquisition program.]

(ii) [inserted: To the senior acquisition executive of a military department for a waiver for multiple programs within such military department.]

(iii) [inserted: To the Undersecretary of Defense for Acquisition and Sustainment for a waiver for more than one military department.]

(C) [inserted: Contents.—] [inserted: The written determination required under subparagraph (A)(i) with respect to a waiver for the acquisition of an advanced battery shall include—]

(i) [inserted: the reason such waiver is required;]

(ii) [inserted: a list of each weapon system or end item for which such advanced battery is being acquired under such waiver;]

(iii) [inserted: the duration of such wavier; and]

(iv) [inserted: a timeline for implementing the strategy described in subparagraph (A)(ii).]

(2) [inserted: Personal electronics.—] [inserted: Subsection (a) does not apply with respect to the acquisition of an advanced battery for use in personal electronics, including cell phones and laptops, intended for office or administrative purposes.]

(3) [inserted: Testing and evaluation.—] [inserted: Subsection (a) does not apply with respect to the acquisition of an advanced battery for which testing and evaluation under a program of record of the Department of Defense begins prior to January 1, 2027.]

[struck: This section applies to all new acquisition programs on January 1, 2028, standard batteries on January 1, 2029, and for existing acquisition programs on January 30, 2031.]

(c) [struck: Exceptions][inserted: Definitions].— [inserted: In this section:]

(1) [struck: Sourcing and production compliance.—] [inserted: The terms “advanced battery” and “foreign entity of concern” have the meanings given such terms, respectively, under section 40207(a) of the Infrastructure Investment and Jobs Act (42 U.S.C. 18741(a)).]

[struck: (A)] [struck: In general.—] [struck: Subsection (a) does not apply to an advanced battery or cell of an advanced battery if—]

[struck: (i)] [struck: the final assembly of such advanced battery or cell is carried out by an entity other than a foreign entity of concern;]

[struck: (ii)] [struck: functional cell components comprising more than 95 percent of the costs of the functional cell components of such advanced battery or cell are from sources other than foreign entities of concern; and]

[struck: (iii)] [struck: such advanced battery or cell is produced without technology licensed from a foreign entity of concern.]

[struck: (B)] [struck: Recycled source determination.—] [struck: For the purposes of subparagraph (A)(ii), any material or component from an entity that has been recycled and reprocessed domestically is considered to originate from that entity regardless of origin.]

(2) [struck: Excluded batteries.—] [inserted: The term “battery cell” means the smallest individual component of a battery capable of converting chemical energy into electrical energy.]

[struck: Subsection (a) does not apply to a battery or cell of a battery that is—]

[struck: (A)] [struck: acquired for use in a cell phone, laptop, personal electronic device, or medical equipment intended for use in an office, administrative, hospital, or non-combat environment;]

[struck: (B)] [struck: commercially available off-the-shelf item for use only in the maintenance of equipment; or]

[struck: (C)] [struck: acquired for research, development, testing, and evaluation by the Department of Defense.]

(3) [struck: Waiver.—] [inserted: The term “electrode active materials” means cathode materials, anode materials, anode foils, and other electrochemically active materials including solvents, additives, and electrolyte salts that contribute to the electrochemical processes necessary for energy storage in a battery.]

[struck: (A)] [struck: In general.—] [struck: The Secretary of Defense may waive the limitations specified in subsection (a) for a specific system or battery for one year if—]

[struck: (i)] [struck: the Secretary determines that a satisfactory quality and sufficient quantity such advanced battery or cell that are not subject to such prohibition cannot be acquired as and when needed by the Department of Defense at reasonable costs; or]

[struck: (ii)] [struck: in the case of an advanced battery or cell that is a component of a warfighting or support system, sufficient documentation exists to show that such advanced battery or cell is not a functional enabler of operational capability for such system and such advanced battery or cell poses no risk to the security of or sourcing for such system.]

[struck: (B)] [struck: Delegation.—] [struck: The Secretary of Defense may delegate the authority under subparagraph (A) only to the Under Secretary of Defense for Acquisition and Sustainment.]

[struck: (d)] [struck: Report.—] [struck: Not later than December 1, 2028, and not less frequently than once every three years thereafter until the date that is twelve years after the date of the enactment of this Act, the Secretary of Defense shall provide to the congressional defense committees a briefing on the status of meeting the requirements under subsection (a).]

[struck: (e)] [struck: Definitions.—] [struck: In this section:]

[struck: (1)] [struck: The term “new acquisition program” means a defense acquisition program that has not reached the initiation of the engineering and manufacturing development phase, or an equivalent phase of development, including a defense acquisition program that has not undergone a formal Milestone B approval or equivalent decision point, before the date of the enactment of this Act.]

[struck: (2)] [struck: The term “existing acquisition program” means a defense acquisition program that has reached the initiation of the engineering and manufacturing development phase, or an equivalent phase of development, including a defense acquisition program that has undergone a formal Milestone B approval or equivalent decision point, before the date of the enactment of this Act.]

[struck: (3)] [struck: The term “functional cell component” means the cathode materials, anode materials, separators, anode foils, and other functional materials of an advanced battery that contribute to the chemical processes necessary for energy storage, including solvents, additives, electrolyte salts, and internal safety devices.]

[struck: (4)] [struck: The “foreign entity of concern” has the meaning given such term under section 40207(a) of the Infrastructure Investment and Jobs Act (42 U.S.C. 18741(a)), and includes entities specified in section 154 of the National Defense Authorization Act for Fiscal Year 2024 (Public Law 118–31; 10 U.S.C. 4651 note prec.).]

[struck: (5)] [struck: The term “standard battery” means a battery that used in more than one weapons system and are not managed by one portfolio acquisition executive.]

Step through the changes