Title 33 · Navigation and Navigable Waters
Changes to 33 U.S.C. § 1341
H.R. 3898 · PERMIT Act · Referred The text sent to a committee of the other chamber after one chamber passed it.
Passed the House · step 3 of 5
33 U.S.C. § 1341 Certification
23 changes the bill asks for here, 20 carried out
- Carried out:
in the first sentence, by striking
may result
and insertingmay directly result
; - Carried out:
in the second sentence, by striking
activity
and insertingdischarge
; - Carried out:
in the third sentence, by striking
applications
each place it appears and insertingrequests
; - Carried out:
in the fifth sentence, by striking
act on a request for certification, within a reasonable period of time (which shall not exceed one year) after receipt of such request, the certification requirements of this subsection
and insertinggrant the request for certification with or without conditions, deny the request for certification, or waive the requirement for certification under this subsection with respect to such Federal application, within a reasonable period of time to be determined by the licensing or permitting agency (which shall not exceed one year) after receipt of such request, the requirement for certification under this subsection
; - Carried out:
in the sixth sentence, by striking
waived as provided in the preceding sentence
and insertingwaived under this paragraph
; and - Carried out:
by inserting after the fourth sentence the following:
Not later than 30 days after the date of enactment of the PERMIT Act, each State and interstate agency that has authority to give such a certification, and the Administrator, shall publish requirements for certification to demonstrate to such State, such interstate agency, or the Administrator, as the case may be, compliance with the applicable provisions of sections 301, 302, 303, 306, and 307. A decision to grant or deny a request for certification shall be based only on compliance with the applicable provisions of sections 301, 302, 303, 306, and 307, and the grounds for the decision shall be set forth in writing and provided to the applicant. Not later than 90 days after receipt of a request for certification, the State, interstate agency, or Administrator, as the case may be, shall identify in writing all specific additional materials or information necessary for the request for certification to be complete, as described in subsection (g). The State, interstate agency, or the Administrator, as the case may be, may grant a request for certification with or without conditions, deny a request for certification, or waive the requirement for certification under this subsection with respect to such Federal application.
; - Carried out:
in the second sentence, by striking
notice of application for such Federal license or permit
and insertingreceipt of a notice under the preceding sentence
; - Not carried out:
by striking
any water quality requirement in such State
and insertingany water quality standard in effect for the State under section 303
; and“any water quality requirement in such State” isn't in § 1341(a)(2) in the Code as we have it. The law may have changed since the bill was drafted.
Technical detail
“any water quality requirement in such State” not found in /us/usc/t33/s1341/a/2 - Carried out:
by inserting before the period
at a time that is agreed to by such State and the applicant
; - Carried out:
in the fifth sentence, by striking
insure compliance with applicable water quality requirements.
and insertingensure compliance with the applicable provisions of sections 301, 302, 303, 306, and 307.
; - Not carried out:
in the final sentence, by striking
insure
and insertingensure
;We can't read how this instruction is worded yet, so it isn't shown in the text.
Technical detail
no-pattern: in the final sentence, by striking QTEXT and inserting QTEXT; - Carried out:
by striking the first sentence and inserting
On receipt of a request for certification, the certifying State or interstate agency, as applicable, shall immediately notify the Administrator of the request.
; and - Carried out:
by inserting after the second sentence the following:
If the Administrator determines under the preceding sentence that such a discharge will not affect the waters of any other State, no such notification is required.
; - Carried out:
in the first sentence, by striking
there will be compliance
and insertingany such discharge will comply
; and - Carried out:
in the second sentence, by striking
section
and insertingany applicable provision of section
; - Carried out:
by inserting
directly
beforeresult in any discharge
; and - Carried out:
by striking
applicable effluent limitations or other limitations or other applicable water quality requirements will not be violated
and insertingno applicable provision of section 301, 302, 303, 306, or 307 will be violated
; - Carried out:
in the second sentence, by striking
will violate applicable effluent limitations or other limitations or other water quality requirements
and insertingwill directly result in a discharge that violates an applicable provision of section 301, 302, 303, 306, or 307,
; and - Carried out:
in the third sentence, by striking
such facility or activity will not violate the applicable provisions
and insertingoperation of such facility or activity will not directly result in a discharge that violates any applicable provision
; and - Carried out:
in paragraph (5), by striking
the applicable provisions
and insertingany applicable provision
; - Carried out:
in subsection (b), by striking
Nothing in this section
and insertingExcept as provided in subsection (e), nothing in this section
; - Not carried out:
in subsection (d), by striking
applicant for a Federal license or permit will comply with any applicable effluent limitations and other limitations, under section 301 or 302 of this Act, standard of performance under section 306 of this Act, or prohibition, effluent standard, or pretreatment standard under section 307 of this Act, and with any other appropriate requirement of State law set forth in such certification, and shall become a condition on any Federal license or permit subject to the provisions of this section
and insertingdischarge subject to this section will comply with the applicable provisions of sections 301, 302, 303, 306, and 307, and any such limitations or requirements shall be imposed by the licensing or permitting agency as a condition on any Federal license or permit subject to the provisions of this section
; and“applicant for a Federal license or permit will comply with any applicable effluent limitations and other limitations, under section 301 or 302 of this Act, standard of performance under section 306 of this Act, or prohibition, effluent standard, or pretreatment standard under section 307 of this Act, and with any other appropriate requirement of State law set forth in such certification, and shall become a condition on any Federal license or permit subject to the provisions of this section” isn't in § 1341(d) in the Code as we have it. The law may have changed since the bill was drafted.
Technical detail
“applicant for a Federal license or permit will comply with any applicable effluent limitations and other limitations, under section 301 or 302 of this Act, standard of performance under section 306 of this Act, or prohibition, effluent standard, or pretreatment standard under section 307 of this Act, and with any other appropriate requirement of State law set forth in such certification, and shall become a condition on any Federal license or permit subject to the provisions of this section” not found in /us/usc/t33/s1341/d - Carried out:
by adding at the end the following:
(e) Notwithstanding section 505, any condition imposed on a Federal license or permit by a licensing or permitting agency under this section may be enforced only by such licensing or permitting agency. (f) For purposes of this section, the applicable provisions of sections 301, …
§ 1341(a)–(h)
§ 1341. Certification
(a) Compliance with applicable requirements; application; procedures; license suspension
(1) Any applicant for a Federal license or permit to conduct any [struck: activity][inserted: discharge] including, but not limited to, the construction or operation of facilities, which may [inserted: directly ]result in any discharge into the navigable waters, shall provide the licensing or permitting agency a certification from the State in which the discharge originates or will originate, or, if appropriate, from the interstate water pollution control agency having jurisdiction over the navigable waters at the point where the discharge originates or will originate, that any such discharge will comply with the applicable provisions of sections 1311, 1312, 1313, 1316, and 1317 of this title. In the case of any such activity for which there is not an applicable effluent limitation or other limitation under sections 1311(b) and 1312 of this title, and there is not an applicable standard under sections 1316 and 1317 of this title, the State shall so certify, except that any such certification shall not be deemed to satisfy section 1371(c) of this title. Such State or interstate agency shall establish procedures for public notice in the case of all [struck: applications][inserted: requests] for certification by it and, to the extent it deems appropriate, procedures for public hearings in connection with specific [struck: applications][inserted: requests]. In any case where a State or interstate agency has no authority to give such a certification, such certification shall be from the Administrator. [inserted: Not later than 30 days after the date of enactment of the PERMIT Act, each State and interstate agency that has authority to give such a certification, and the Administrator, shall publish requirements for certification to demonstrate to such State, such interstate agency, or the Administrator, as the case may be, compliance with the applicable provisions of sections 301, 302, 303, 306, and 307. A decision to grant or deny a request for certification shall be based only on compliance with the applicable provisions of sections 301, 302, 303, 306, and 307, and the grounds for the decision shall be set forth in writing and provided to the applicant. Not later than 90 days after receipt of a request for certification, the State, interstate agency, or Administrator, as the case may be, shall identify in writing all specific additional materials or information necessary for the request for certification to be complete, as described in subsection (g). The State, interstate agency, or the Administrator, as the case may be, may grant a request for certification with or without conditions, deny a request for certification, or waive the requirement for certification under this subsection with respect to such Federal application. ]If the State, interstate agency, or Administrator, as the case may be, fails or refuses to [struck: act][inserted: grant] [struck: on][inserted: the] [struck: a][inserted: request] [inserted: for certification with or without conditions, deny the ]request for certification, [inserted: or waive the requirement for certification under this subsection with respect to such Federal application, ]within a reasonable period of time [inserted: to be determined by the licensing or permitting agency ](which shall not exceed one year) after receipt of such request, the [struck: certification][inserted: requirement] [struck: requirements][inserted: for] [struck: of][inserted: certification] [inserted: under ]this subsection shall be waived with respect to such Federal application. No license or permit shall be granted until the certification required by this section has been obtained or has been waived [struck: as][inserted: under] [struck: provided][inserted: this] [struck: in the preceding sentence][inserted: paragraph]. No license or permit shall be granted if certification has been denied by the State, interstate agency, or the Administrator, as the case may be.
(2) [struck: Upon][inserted: On] receipt of [struck: such][inserted: a] [struck: application][inserted: request] [struck: and][inserted: for] certification[inserted: ,] the [struck: licensing][inserted: certifying] [inserted: State ]or [struck: permitting][inserted: interstate] agency[inserted: ,] [inserted: as applicable, ]shall immediately notify the Administrator of [struck: such][inserted: the] [struck: application and certification][inserted: request]. Whenever such a discharge may affect, as determined by the Administrator, the quality of the waters of any other State, the Administrator within thirty days of the date of [struck: notice][inserted: receipt] of [struck: application][inserted: a] [struck: for][inserted: notice] [struck: such][inserted: under] [struck: Federal][inserted: the] [struck: license][inserted: preceding] [struck: or][inserted: sentence] [struck: permit ]shall so notify such other State, the licensing or permitting agency, and the applicant. If[inserted: the Administrator determines under the preceding sentence that such a discharge will not affect the waters of any other State], [inserted: no such notification is required. If, ]within sixty days after receipt of such notification, such other State determines that such discharge will affect the quality of its waters so as to violate any water quality requirements in such State, and within such sixty-day period notifies the Administrator and the licensing or permitting agency in writing of its objection to the issuance of such license or permit and requests a public hearing on such objection, the licensing or permitting agency shall hold such a hearing. The Administrator shall at such hearing submit his evaluation and recommendations with respect to any such objection to the licensing or permitting agency. Such agency, based upon the recommendations of such State, the Administrator, and upon any additional evidence, if any, presented to the agency at the hearing, shall condition such license or permit in such manner as may be necessary to [struck: insure][inserted: ensure] compliance with [inserted: the ]applicable [struck: water][inserted: provisions] [struck: quality][inserted: of] [struck: requirements][inserted: sections 301, 302, 303, 306, and 307]. If the imposition of conditions cannot insure such compliance such agency shall not issue such license or permit.
(3) The certification obtained pursuant to paragraph (1) of this subsection with respect to the construction of any facility shall fulfill the requirements of this subsection with respect to certification in connection with any other Federal license or permit required for the operation of such facility unless, after notice to the certifying State, agency, or Administrator, as the case may be, which shall be given by the Federal agency to whom application is made for such operating license or permit, the State, or if appropriate, the interstate agency or the Administrator, notifies such agency within sixty days after receipt of such notice that there is no longer reasonable assurance that [struck: there][inserted: any] [struck: will][inserted: such] [struck: be][inserted: discharge] [struck: compliance][inserted: will] [inserted: comply ]with the applicable provisions of [inserted: any applicable provision of ]sections 1311, 1312, 1313, 1316, and 1317 of this title because of changes since the construction license or permit certification was issued in (A) the construction or operation of the facility, (B) the characteristics of the waters into which such discharge is made, (C) the water quality criteria applicable to such waters or (D) applicable effluent limitations or other requirements. This paragraph shall be inapplicable in any case where the applicant for such operating license or permit has failed to provide the certifying State, or, if appropriate, the interstate agency or the Administrator, with notice of any proposed changes in the construction or operation of the facility with respect to which a construction license or permit has been granted, which changes may result in violation of section 1311, 1312, 1313, 1316, or 1317 of this title.
(4) Prior to the initial operation of any federally licensed or permitted facility or activity which may [inserted: directly ]result in any discharge into the navigable waters and with respect to which a certification has been obtained pursuant to paragraph (1) of this subsection, which facility or activity is not subject to a Federal operating license or permit, the licensee or permittee shall provide an opportunity for such certifying State, or, if appropriate, the interstate agency or the Administrator to review the manner in which the facility or activity shall be operated or conducted for the purposes of assuring that [inserted: no ]applicable [struck: effluent][inserted: provision] [struck: limitations][inserted: of] [struck: or][inserted: section] [struck: other][inserted: 301,] [struck: limitations][inserted: 302,] [struck: or][inserted: 303,] [struck: other][inserted: 306,] [struck: applicable][inserted: or] [struck: water][inserted: 307] [struck: quality requirements ]will [struck: not ]be violated. Upon notification by the certifying State, or if appropriate, the interstate agency or the Administrator that the operation of any such federally licensed or permitted facility or activity will [struck: violate][inserted: directly] [struck: applicable][inserted: result] [struck: effluent][inserted: in] [struck: limitations][inserted: a] [struck: or][inserted: discharge] [struck: other][inserted: that] [struck: limitations][inserted: violates] [struck: or][inserted: an] [struck: other][inserted: applicable] [struck: water][inserted: provision] [struck: quality][inserted: of] [struck: requirements][inserted: section] [inserted: 301, 302, 303, 306, or 307, ]such Federal agency may, after public hearing, suspend such license or permit. If such license or permit is suspended, it shall remain suspended until notification is received from the certifying State, agency, or Administrator, as the case may be, that there is reasonable assurance that [inserted: operation of ]such facility or activity will not [struck: violate][inserted: directly] [struck: the][inserted: result] [inserted: in a discharge that violates any ]applicable [struck: provisions][inserted: provision] of section 1311, 1312, 1313, 1316, or 1317 of this title.
(5) Any Federal license or permit with respect to which a certification has been obtained under paragraph (1) of this subsection may be suspended or revoked by the Federal agency issuing such license or permit upon the entering of a judgment under this chapter that such facility or activity has been operated in violation of [struck: the][inserted: any] applicable [struck: provisions][inserted: provision] of section 1311, 1312, 1313, 1316, or 1317 of this title.
(6) Except with respect to a permit issued under section 1342 of this title, in any case where actual construction of a facility has been lawfully commenced prior to April 3, 1970, no certification shall be required under this subsection for a license or permit issued after April 3, 1970, to operate such facility, except that any such license or permit issued without certification shall terminate April 3, 1973, unless prior to such termination date the person having such license or permit submits to the Federal agency which issued such license or permit a certification and otherwise meets the requirements of this section.
(b) Compliance with other provisions of law setting applicable water quality requirements [struck: Nothing][inserted: Except] [inserted: as provided ]in [inserted: subsection (e), nothing in ]this section shall be construed to limit the authority of any department or agency pursuant to any other provision of law to require compliance with any applicable water quality requirements. The Administrator shall, upon the request of any Federal department or agency, or State or interstate agency, or applicant, provide, for the purpose of this section, any relevant information on applicable effluent limitations, or other limitations, standards, regulations, or requirements, or water quality criteria, and shall, when requested by any such department or agency or State or interstate agency, or applicant, comment on any methods to comply with such limitations, standards, regulations, requirements, or criteria.
(c) Authority of Secretary of the Army to permit use of spoil disposal areas by Federal licensees or permittees In order to implement the provisions of this section, the Secretary of the Army, acting through the Chief of Engineers, is authorized, if he deems it to be in the public interest, to permit the use of spoil disposal areas under his jurisdiction by Federal licensees or permittees, and to make an appropriate charge for such use. Moneys received from such licensees or permittees shall be deposited in the Treasury as miscellaneous receipts.
(d) Limitations and monitoring requirements of certification Any certification provided under this section shall set forth any effluent limitations and other limitations, and monitoring requirements necessary to assure that any applicant for a Federal license or permit will comply with any applicable effluent limitations and other limitations, under section 1311 or 1312 of this title, standard of performance under section 1316 of this title, or prohibition, effluent standard, or pretreatment standard under section 1317 of this title, and with any other appropriate requirement of State law set forth in such certification, and shall become a condition on any Federal license or permit subject to the provisions of this section.
(e) [inserted: Notwithstanding section 505, any condition imposed on a Federal license or permit by a licensing or permitting agency under this section may be enforced only by such licensing or permitting agency.]
(f) [inserted: For purposes of this section, the applicable provisions of sections 301, 302, 303, 306, and 307 are any applicable effluent limitations and other limitations under section 301 or 302, any water quality standard in effect for a State under section 303, any standard of performance under section 306, and any prohibition, effluent standard, or pretreatment standard under section 307.]
(g) [inserted: A request for certification under this section shall be made in writing to the State, interstate agency, or Administrator, as the case may be. A complete request for certification shall consist of the following:]
(1) [inserted: Identification of each applicant for the Federal license or permit with respect to which the certification is requested.]
(2) [inserted: A statement that information included in the request for certification is truthful, accurate, and complete, to the best knowledge of each such applicant.]
(3) [inserted: In the case of a request for certification with respect to an individual permit or license—]
(A) [inserted: identification of the Federal license or permit that is the subject of the application with respect to which the certification is requested;]
(B) [inserted: identification of any activity the conduct of which is subject to such Federal license or permit;]
(C) [inserted: identification of the location and nature of any discharge that may directly result from such activity, and the location of the receiving waters;]
(D) [inserted: a description of means that may be used to monitor, control, or manage any such discharge; and]
(E) [inserted: a list of all other Federal, interstate, Tribal, State, or local agency authorizations required for the conduct of such activity, and any approval or denial of such an authorization already received.]
(4) [inserted: In the case of a request for certification with respect to the issuance of a general license or general permit—]
(A) [inserted: identification of the proposed categories of activities to be covered by the general license or general permit for which certification is requested;]
(B) [inserted: a description of the proposed general license or general permit, which may include a draft of the proposed general license or permit; and]
(C) [inserted: an estimate of the number of discharges expected to result from the proposed general license or general permit annually.]
(h) [inserted: Judicial review.—]
(1) [inserted: Affected certification actions.—] [inserted: This subsection shall apply to any civil action for the review of a certification action with respect to an applicant for a license or permit—]
(A) [inserted: for the construction or operation of facilities for the transmission of electric energy or energy fuels in interstate or foreign commerce; or]
(B) [inserted: from the Federal Energy Regulatory Commission.]
(2) [inserted: Standing and filing deadline.—] [inserted: Not withstanding any other provision of law, no court shall have jurisdiction to review a civil action under this subsection, except for a civil action filed not later than 30 days after the final action on the certification by—]
(A) [inserted: the applicant; or]
(B) [inserted: a person who has suffered, or likely and imminently will suffer, direct and irreparable economic harm from the authorization; provided that an organization or association satisfies this harm requirement only if each member of the organization or association satisfies the requirement.]
(3) [inserted: Expedited consideration.—]
(A) [inserted: The Court shall—]
(i) [inserted: set any petition for review brought under this subsection for expedited consideration; and]
(ii) [inserted: issue a final decision no later than 120 days after the filing of the civil action, unless the court finds extraordinary circumstances, in which the Court may take up to 60 additional days to issue a final decision.]
(B) [inserted: Failure to comply with deadline.—] [inserted: If the civil action concerns a certification that has been granted, the Court’s failure to issue a final decision in compliance with the deadlines in subparagraph (A) shall mean the civil action is denied with prejudice.]