Title 33 · Navigation and Navigable Waters
Changes to 33 U.S.C. § 1344
H.R. 3898 · PERMIT Act · Referred The text sent to a committee of the other chamber after one chamber passed it.
Passed the House · step 3 of 5
33 U.S.C. § 1344 Permits for dredged or fill material
13 changes the bill asks for here, 9 carried out
- Not carried out:
by striking (c) The Administrator and inserting the following:(c) Specification or use of defined area.— (1) In general.— The Administrator;
The bill gives this provision a heading and rewords it at the same time, a kind of change we can't show yet.
Technical detail
the provision inserted says more than a heading and the words struck - Not carried out:
in paragraph (1), as so designated, by inserting
during the period described in paragraph (2) and
beforeafter notice and opportunity for public hearings
; andThe bill points to paragraph (1) of § 1344(c), which isn't there in the Code as we have it. It may have been renumbered or removed since the bill was drafted.
Technical detail
target not found: no paragraph (1) in /us/usc/t33/s1344/c - Carried out:
by adding at the end the following:
(2) Period of prohibition.— The period during which the Administrator may prohibit the specification (including the withdrawal of specification) of any defined area as a disposal site, or deny or restrict the use of any defined area for specification (including the withdrawal of …
- Not carried out:
by striking (e)(1) In carrying and inserting the following:(e) General permits.— (1) Permits authorized.— In carrying;
The bill gives this provision a heading and rewords it at the same time, a kind of change we can't show yet.
Technical detail
the provision inserted says more than a heading and the words struck - Carried out:
by striking (2) No general and inserting the following:(2) Term.— No general; and
- Carried out:
by striking
five years
and insertingten years
; and - Carried out:
by adding at the end the following:
(3) Considerations.— In determining the environmental effects of an activity under paragraph (1) or (2), the Secretary— (A) shall consider only the effects of any discharge of dredged or fill material resulting from such activity; (B) shall consider any effects of a discharge of …
- Carried out:
by redesignating paragraph (3) as paragraph (4); and
- Carried out:
by inserting after paragraph (2) the following:
(3) If the Administrator determines that additional information is necessary for the description of a program submitted by a State to be full and complete under paragraph (1), the Administrator shall, not later than 45 days after the date of the receipt of the program and …
- Carried out:
in subsection (h)(1), by striking
paragraph (1) of this subsection
and insertingsubsection (g)(1)
. - Carried out:
by redesignating subsection (t) as subsection (u);
- Not carried out:
in subsection (u), as so redesignated, by striking
Nothing in the section
and insertingSavings provision.—Nothing in this section
; and“Nothing in the section” isn't in § 1344(u) in the Code as we have it. The law may have changed since the bill was drafted.
Technical detail
“Nothing in the section” not found in /us/usc/t33/s1344/u - Carried out:
by inserting after subsection (s) the following:
(t) Judicial review.— (1) Statute of limitations.— Notwithstanding any applicable provision of law relating to statutes of limitations— (A) an action seeking judicial review of the approval by the Administrator of a State permit program pursuant to this section shall be filed …
§ 1344(a)–(f)
§ 1344. Permits for dredged or fill material
(a) Discharge into navigable waters at specified disposal sites The Secretary may issue permits, after notice and opportunity for public hearings for the discharge of dredged or fill material into the navigable waters at specified disposal sites. Not later than the fifteenth day after the date an applicant submits all the information required to complete an application for a permit under this subsection, the Secretary shall publish the notice required by this subsection.
(b) Specification for disposal sites Subject to subsection (c) of this section, each such disposal site shall be specified for each such permit by the Secretary (1) through the application of guidelines developed by the Administrator, in conjunction with the Secretary, which guidelines shall be based upon criteria comparable to the criteria applicable to the territorial seas, the contiguous zone, and the ocean under section 1343(c) of this title, and (2) in any case where such guidelines under clause (1) alone would prohibit the specification of a site, through the application additionally of the economic impact of the site on navigation and anchorage.
(c) Denial or restriction of use of defined areas as disposal sites The Administrator is authorized to prohibit the specification (including the withdrawal of specification) of any defined area as a disposal site, and he is authorized to deny or restrict the use of any defined area for specification (including the withdrawal of specification) as a disposal site, whenever he determines, after notice and opportunity for public hearings, that the discharge of such materials into such area will have an unacceptable adverse effect on municipal water supplies, shellfish beds and fishery areas (including spawning and breeding areas), wildlife, or recreational areas. Before making such determination, the Administrator shall consult with the Secretary. The Administrator shall set forth in writing and make public his findings and his reasons for making any determination under this subsection.
(2) [inserted: Period of prohibition.—] [inserted: The period during which the Administrator may prohibit the specification (including the withdrawal of specification) of any defined area as a disposal site, or deny or restrict the use of any defined area for specification (including the withdrawal of specification) as a disposal site, under paragraph (1) shall—]
(A) [inserted: begin on the date on which an applicant submits all the information required to complete an application for a permit under this section; and]
(B) [inserted: end on the date on which the Secretary issues the permit.]
(d) “Secretary” defined The term “Secretary” as used in this section means the Secretary of the Army, acting through the Chief of Engineers.
(e) General permits on State, regional, or nationwide basis
(1) In carrying out his functions relating to the discharge of dredged or fill material under this section, the Secretary may, after notice and opportunity for public hearing, issue general permits on a State, regional, or nationwide basis for any category of activities involving discharges of dredged or fill material if the Secretary determines that the activities in such category are similar in nature, will cause only minimal adverse environmental effects when performed separately, and will have only minimal cumulative adverse effect on the environment. Any general permit issued under this subsection shall (A) be based on the guidelines described in subsection (b)(1) of this section, and (B) set forth the requirements and standards which shall apply to any activity authorized by such general permit.
(2) [inserted: Term.—] No general permit issued under this subsection shall be for a period of more than [struck: five][inserted: ten] years after the date of its issuance and such general permit may be revoked or modified by the Secretary if, after opportunity for public hearing, the Secretary determines that the activities authorized by such general permit have an adverse impact on the environment or such activities are more appropriately authorized by individual permits.
(3) [inserted: Considerations.—] [inserted: In determining the environmental effects of an activity under paragraph (1) or (2), the Secretary—]
(A) [inserted: shall consider only the effects of any discharge of dredged or fill material resulting from such activity;]
(B) [inserted: shall consider any effects of a discharge of dredged or fill material into less than 3 acres of navigable waters to be a minimal adverse environmental effect; and]
(C) [inserted: may consider any effects of a discharge of dredged or fill material into 3 acres or more of navigable waters to be a minimal adverse environmental effect.]
(4) [inserted: Nationwide permits for linear projects.—]
(A) [inserted: In general.—] [inserted: Notwithstanding any other provision of this section, the Secretary shall maintain general permits on a nationwide basis for—]
(i) [inserted: linear infrastructure projects that result in a discharge of dredged or fill material into less than 3 acres of navigable waters for each single and complete project; and]
(ii) [inserted: linear pipeline projects that do not result in the loss of navigable waters in an amount that is greater than 0.5 acres for each single and complete project.]
(B) [inserted: Definitions.—] [inserted: In this paragraph:]
(i) [inserted: Linear infrastructure project.—] [inserted: The term “linear infrastructure project” means a project to carry out any activity required for the construction, expansion, maintenance, modification, or removal of infrastructure and associated facilities for the transmission from a point of origin to a terminal point of communications or electricity, or for the transportation from a point of origin to a terminal point of people, water, or wastewater.]
(ii) [inserted: Linear pipeline project.—] [inserted: The term “linear pipeline project” means a project to carry out any activity required for the construction, expansion, maintenance, modification, or removal of infrastructure and associated facilities for the transportation from a point of origin to a terminal point of carbon dioxide, fuel, or hydrocarbons, in the form of a liquid, liquescent, gaseous, or slurry substance or supercritical fluid, including oil and gas pipeline facilities.]
(iii) [inserted: Single and complete project.—] [inserted: The term “single and complete project” has the meaning given that term in section 330.2 of title 33, Code of Federal Regulations (as in effect on the date of enactment of this paragraph).]
(5) [inserted: Reissuance of nationwide permits.—] [inserted: In determining whether to reissue a general permit issued under this subsection on a nationwide basis—]
(A) [inserted: no consultation with an applicable State pursuant to section 6(a) of the Endangered Species Act of 1973 (16 U.S.C. 1535(a)) is required;]
(B) [inserted: no consultation with a Federal agency pursuant to section 7(a)(2) of such Act (16 U.S.C. 1536(a)(2)) is required; and]
(C) [inserted: the requirements of section 102(2)(C) of the National Environmental Policy Act of 1969 (42 U.S.C. 4332(2)(C)) shall be satisfied by preparing an environmental assessment with respect to such general permit.]
(f) Non-prohibited discharge of dredged or fill material
(1) Except as provided in paragraph (2) of this subsection, the discharge of dredged or fill material—
§ 1344(g)–(h)
(f)(1)(A)–(g) unchanged ·
(1) The Governor of any State desiring to administer its own individual and general permit program for the discharge of dredged or fill material into the navigable waters (other than those waters which are presently used, or are susceptible to use in their natural condition or by reasonable improvement as a means to transport interstate or foreign commerce shoreward to their ordinary high water mark, including all waters which are subject to the ebb and flow of the tide shoreward to their mean high water mark, or mean higher high water mark on the west coast, including wetlands adjacent thereto) within its jurisdiction may submit to the Administrator a full and complete description of the program it proposes to establish and administer under State law or under an interstate compact. In addition, such State shall submit a statement from the attorney general (or the attorney for those State agencies which have independent legal counsel), or from the chief legal officer in the case of an interstate agency, that the laws of such State, or the interstate compact, as the case may be, provide adequate authority to carry out the described program.
(2) Not later than the tenth day after the date of the receipt of the program and statement submitted by any State under paragraph (1) of this subsection, the Administrator shall provide copies of such program and statement to the Secretary and the Secretary of the Interior, acting through the Director of the United States Fish and Wildlife Service.
(3) [inserted: If the Administrator determines that additional information is necessary for the description of a program submitted by a State to be full and complete under paragraph (1), the Administrator shall, not later than 45 days after the date of the receipt of the program and statement submitted by the State under such paragraph, submit to the State a written request for all such information.]
[struck: (3)] [inserted: (4)] Not later than the ninetieth day after the date of the receipt by the Administrator of the program and statement submitted by any State, under paragraph (1) of this subsection, the Secretary and the Secretary of the Interior, acting through the Director of the United States Fish and Wildlife Service, shall submit any comments with respect to such program and statement to the Administrator in writing.
(h) Determination of State’s authority to issue permits under State program; approval; notification; transfers to State program
(1) Not later than the one-hundred-twentieth day after the date of the receipt by the Administrator of a program and statement submitted by any State under [struck: paragraph][inserted: subsection] ([inserted: g)(]1)[struck: of this subsection], the Administrator shall determine, taking into account any comments submitted by the Secretary and the Secretary of the Interior, acting through the Director of the United States Fish and Wildlife Service, pursuant to subsection (g) of this section, whether such State has the following authority with respect to the issuance of permits pursuant to such program:
(A) To issue permits which—
(i) apply, and assure compliance with, any applicable requirements of this section, including, but not limited to, the guidelines established under subsection (b)(1) of this section, and sections 1317 and 1343 of this title;
§ 1344(s)–(u)
(h)(1)(A)(ii)–(s)(2) unchanged ·
(3) The Secretary is authorized to commence a civil action for appropriate relief, including a permanent or temporary injunction for any violation for which he is authorized to issue a compliance order under paragraph (1) of this subsection. Any action under this paragraph may be brought in the district court of the United States for the district in which the defendant is located or resides or is doing business, and such court shall have jurisdiction to restrain such violation and to require compliance. Notice of the commencement of such acton1 shall be given immediately to the appropriate State.
(4) Any person who violates any condition or limitation in a permit issued by the Secretary under this section, and any person who violates any order issued by the Secretary under paragraph (1) of this subsection, shall be subject to a civil penalty not to exceed $25,000 per day for each violation. In determining the amount of a civil penalty the court shall consider the seriousness of the violation or violations, the economic benefit (if any) resulting from the violation, any history of such violations, any good-faith efforts to comply with the applicable requirements, the economic impact of the penalty on the violator, and such other matters as justice may require.
(t) [inserted: Judicial review.—]
(1) [inserted: Statute of limitations.—] [inserted: Notwithstanding any applicable provision of law relating to statutes of limitations—]
(A) [inserted: an action seeking judicial review of the approval by the Administrator of a State permit program pursuant to this section shall be filed not later than the date that is 60 days after the date on which the approval was issued;]
(B) [inserted: an action seeking judicial review of an individual permit or general permit issued under this section shall be filed not later than the date that is 60 days after the date on which the permit was issued; and]
(C) [inserted: an action seeking judicial review of a verification that an activity involving a discharge of dredged or fill material is authorized by a general permit issued under this section shall be filed not later than the date that is 60 days after the date on which such verification was issued.]
(2) [inserted: Limitation on commencement of certain actions.—] [inserted: Notwithstanding any other provision of law, no action described in subparagraph (A) or (B) of paragraph (1) may be commenced unless the action—]
(A) [inserted: is filed by a party that submitted a comment—]
(i) [inserted: during the public comment period for the administrative proceedings related to the action; and]
(ii) [inserted: which was sufficiently detailed to put the Administrator, the Secretary, or the State, as applicable, on notice of the issue upon which the party seeks judicial review; and]
(B) [inserted: is related to such comment.]
(3) [inserted: Remedies.—]
(A) [inserted: Actions relating to permit programs.—] [inserted: If a court determines that the Administrator did not comply with the requirements of this section in issuing an approval of a State permit program pursuant to this section—]
(i) [inserted: the court shall remand the matter to the Administrator for further proceedings consistent with the determination of the court; and]
(ii) [inserted: the court may not vacate, revoke, enjoin, or otherwise limit the authority of the State to issue permits under such State permit program.]
(B) [inserted: Actions relating to permits.—] [inserted: If a court determines that the Secretary or the State, as applicable, did not comply with the requirements of this section in issuing an individual or general permit under this section, or in verifying that an activity involving a discharge of dredged or fill material is authorized by a general permit issued under this section, as applicable—]
(i) [inserted: the court shall remand the matter to the Secretary or the State, as applicable, for further proceedings consistent with the determination of the court;]
(ii) [inserted: with respect to a determination regarding the issuance of an individual or general permit under this section, the court may not vacate, revoke, enjoin, or otherwise limit the permit, unless the court finds that activities authorized under the permit would present an imminent and substantial danger to human health or the environment for which there is no other equitable remedy available under the law; and]
(iii) [inserted: with respect to a determination regarding a verification that an activity involving a discharge of dredged or fill material is authorized by a general permit issued under this section, the court may not enjoin or otherwise limit the discharge unless the court finds that the activity would present an imminent and substantial danger to human health or the environment for which there is no other equitable remedy available under the law.]
(4) [inserted: Timeline to act on court order.—] [inserted: If a court remands a matter under paragraph (3), the court shall set and enforce a reasonable schedule and deadline, which may not exceed 180 days from the date on which the court remands such matter, except as otherwise required by law, for the Administrator, the Secretary, or the State, as applicable, to take such actions as the court may order.]
[struck: (t)] [inserted: (u)] Navigable waters within State jurisdiction Nothing in this section shall preclude or deny the right of any State or interstate agency to control the discharge of dredged or fill material in any portion of the navigable waters within the jurisdiction of such State, including any activity of any Federal agency, and each such agency shall comply with such State or interstate requirements both substantive and procedural to control the discharge of dredged or fill material to the same extent that any person is subject to such requirements. This section shall not be construed as affecting or impairing the authority of the Secretary to maintain navigation.