H.R. 3927 · Nationwide Permitting Improvement Act ·

In committee · step 2 of 5

Sections are cited like “7 U.S.C. § 2012”: 7 of the , 2012.

33 U.S.C. § 1344 Permits for dredged or fill material

+21 −23 of 4 shown
More for 33 U.S.C. § 1344
Read § 1344Only this section
4 changes the bill asks for here, 3 carried out
  1. Not carried out:

    by striking (e)(1) In carrying and inserting the following:(e) General permits on state, regional, or nationwide basis.— (1) Permits authorized.— In carrying;

    The bill gives this provision a heading and rewords it at the same time, a kind of change we can't show yet.

    Technical detailthe provision inserted says more than a heading and the words struck
  2. Carried out:

    by striking (2) No general and inserting the following:(2) Term.— No general; and

  3. Carried out:

    by striking five years and inserting ten years; and

  4. Carried out:

    by adding at the end the following:(3) Considerations.— In determining the environmental effects of an activity under paragraph (1) or (2), the Secretary— (A) shall consider only the effects of any discharge of dredged or fill material resulting from such activity; and (B) shall consider any effects of a …

§ 1344(e)–(f)

Start of § 1344 to (d) unchanged ·

(e) General permits on State, regional, or nationwide basis

(1) In carrying out his functions relating to the discharge of dredged or fill material under this section, the Secretary may, after notice and opportunity for public hearing, issue general permits on a State, regional, or nationwide basis for any category of activities involving discharges of dredged or fill material if the Secretary determines that the activities in such category are similar in nature, will cause only minimal adverse environmental effects when performed separately, and will have only minimal cumulative adverse effect on the environment. Any general permit issued under this subsection shall (A) be based on the guidelines described in subsection (b)(1) of this section, and (B) set forth the requirements and standards which shall apply to any activity authorized by such general permit.

(2) [inserted: Term.—] No general permit issued under this subsection shall be for a period of more than [struck: five][inserted: ten] years after the date of its issuance and such general permit may be revoked or modified by the Secretary if, after opportunity for public hearing, the Secretary determines that the activities authorized by such general permit have an adverse impact on the environment or such activities are more appropriately authorized by individual permits.

(3) [inserted: Considerations.—] [inserted: In determining the environmental effects of an activity under paragraph (1) or (2), the Secretary—]

(A) [inserted: shall consider only the effects of any discharge of dredged or fill material resulting from such activity; and]

(B) [inserted: shall consider any effects of a discharge of dredged or fill material into less than 3 acres of navigable waters to be a minimal adverse environmental effect.]

(4) [inserted: Nationwide permits for linear infrastructure projects.—]

(A) [inserted: In general.—] [inserted: Notwithstanding any other provision of this section, the Secretary shall maintain general permits on a nationwide basis for linear infrastructure projects that result in a discharge of dredged or fill material into less than 3 acres of navigable waters for each single and complete project (as defined in section 330.2 of title 33, Code of Federal Regulations (as in effect on the date of enactment of this paragraph)).]

(B) [inserted: Definition of linear infrastructure project.—] [inserted: In this paragraph, the term “linear infrastructure project” means a project to carry out any activity required for the construction, expansion, maintenance, modification, or removal of infrastructure and associated facilities for the transmission from a point of origin to a terminal point of communications or electricity, or for the transportation from a point of origin to a terminal point of people, water, wastewater, carbon dioxide, or fuel or hydrocarbons (in the form of a liquid, liquescent, gaseous, or slurry substance or supercritical fluid), including oil and gas pipeline facilities.]

(5) [inserted: Reissuance of nationwide permits.—] [inserted: In determining whether to reissue a general permit issued under this subsection on a nationwide basis—]

(A) [inserted: no consultation with an applicable State pursuant to section 6(a) of the Endangered Species Act of 1973 (16 U.S.C. 1535(a)) is required;]

(B) [inserted: no consultation with a Federal agency pursuant to section 7(a)(2) of such Act (16 U.S.C. 1536(a)(2)) is required; and]

(C) [inserted: the requirements of section 102(2)(C) of the National Environmental Policy Act of 1969 (42 U.S.C. 4332(2)(C)) shall be satisfied by preparing an environmental assessment with respect to such general permit.]

(f) Non-prohibited discharge of dredged or fill ma­terial

(1) Except as provided in paragraph (2) of this subsection, the discharge of dredged or fill material—

Rest of § 1344 unchanged ·