Changes to the Code
H.R. 4776 · SPEED Act · Referred The text sent to a committee of the other chamber after one chamber passed it.
Passed the House · step 3 of 5
42 U.S.C. § 4321 Congressional declaration of purpose
2 changes the bill asks for here, 2 carried out
- Carried out:
by striking
The purposes
and inserting(a) The purposes
; and - Carried out:
by adding at the end the following:
(b) This Act is a purely procedural statute intended to ensure Federal agencies consider the environmental impacts of their actions during the decisionmaking process. This Act does not mandate particular results, and only prescribes a process. Nothing in this Act shall be …
§ 4321(b)
§ 4321. Congressional declaration of purpose
[inserted: (a) ]The purposes of this chapter are: To declare a national policy which will encourage productive and enjoyable harmony between man and his environment; to promote efforts which will prevent or eliminate damage to the environment and biosphere and stimulate the health and welfare of man; to enrich the understanding of the ecological systems and natural resources important to the Nation; and to establish a Council on Environmental Quality.
(b) [inserted: This Act is a purely procedural statute intended to ensure Federal agencies consider the environmental impacts of their actions during the decisionmaking process. This Act does not mandate particular results, and only prescribes a process. Nothing in this Act shall be construed to mandate any specific environmental outcome or result, nor shall this Act be interpreted to confer substantive rights or impose substantive duties beyond procedural requirements.]
42 U.S.C. § 4336 Procedure for determination of level of review
7 changes the bill asks for here, 7 carried out
- Carried out:
in the heading, by inserting
; scope of review
afterlevel of review
; - Carried out:
in paragraph (3), by striking
or
; - Carried out:
in paragraph (4), by striking
action.
and insertingaction;
; and - Carried out:
by adding at the end the following:
(5) the agency determines the proposed agency action is an action for which such agency’s compliance with another statute’s requirements serves the function of agency compliance with this Act with respect to such action; or (6) the proposed agency action relates to a project or …
- Carried out:
in paragraph (2), by striking
does not
and insertingis not likely to
; and - Carried out:
in paragraph (3), by amending subparagraph (B) to read as follows:
(B) is not required to— (i) undertake new scientific or technical research unless the new scientific or technical research is essential to a reasoned choice among alternatives, and the overall costs and time frame of obtaining it are not unreasonable; or (ii) undertake new …
- Carried out:
by adding at the end the following:
(c) Scope of review.— In preparing an environmental document for a proposed agency action, a Federal agency— (1) may consider only those effects that share a reasonably close causal relationship to, and are proximately caused by, the immediate project or action under …
§ 4336(a)–(b)
§ 4336. Procedure for determination of level of review[inserted: ; scope of review]
(a) Threshold determinations An agency is not required to prepare an environmental document with respect to a proposed agency action if—
(1) the proposed agency action is not a final agency action within the meaning of such term in chapter 5 of title 5;
(2) the proposed agency action is excluded pursuant to one of the agency’s categorical exclusions, another agency’s categorical exclusions consistent with section 4336c of this title, or another provision of law;
(3) the preparation of such document would clearly and fundamentally conflict with the requirements of another provision of law;[struck: or]
(4) the proposed agency action is a nondiscretionary action with respect to which such agency does not have authority to take environmental factors into consideration in determining whether to take the proposed action[struck: .][inserted: ;]
(5) [inserted: the agency determines the proposed agency action is an action for which such agency’s compliance with another statute’s requirements serves the function of agency compliance with this Act with respect to such action; or]
(6) [inserted: the proposed agency action relates to a project or action that has already been reviewed pursuant to a State environmental review statute or a Tribal environmental review statute, ordinance, resolution, regulation, or formally adopted policy and the lead agency determines such review serves the function of agency compliance with this Act.]
(b) Levels of review
(1) Environmental impact statement An agency shall issue an environmental impact statement with respect to a proposed agency action requiring an environmental document that has a reasonably foreseeable significant effect on the quality of the human environment.
(2) Environmental assessment An agency shall prepare an environmental assessment with respect to a proposed agency action that [struck: does][inserted: is] not [inserted: likely to ]have a reasonably foreseeable significant effect on the quality of the human environment, or if the significance of such effect is unknown, unless the agency finds that the proposed agency action is excluded pursuant to one of the agency’s categorical exclusions, another agency’s categorical exclusions consistent with section 4336c of this title, or another provision of law. Such environmental assessment shall be a concise public document prepared by a Federal agency to set forth the basis of such agency’s finding of no significant impact or determination that an environmental impact statement is necessary.
(3) Sources of information In making a determination under this subsection, an agency—
(A) may make use of any reliable data source; and
(B) [inserted: is not required to—]
(i) [inserted: undertake new scientific or technical research unless the new scientific or technical research is essential to a reasoned choice among alternatives, and the overall costs and time frame of obtaining it are not unreasonable; or]
(ii) [inserted: undertake new scientific or technical research after the receipt of an application, as applicable, with respect to a proposed agency action.]
(c) [inserted: Scope of review.—] [inserted: In preparing an environmental document for a proposed agency action, a Federal agency—]
(1) [inserted: may consider only those effects that share a reasonably close causal relationship to, and are proximately caused by, the immediate project or action under consideration; and]
(2) [inserted: may not consider effects that are speculative, attenuated from the project or action, separate in time or place from the project or action, or in relation to separate existing or potential future projects or actions.]
(d) [inserted: Certainty.—]
(1) [inserted: Environmental documents.—] [inserted: A Federal agency may not rescind, withdraw, amend, alter, or otherwise render ineffective any environmental document completed under this Act for a project or action where there is an applicant unless the Federal agency has been so ordered by a court or the applicant has agreed in writing to such rescission, withdrawal, amendment, or alteration.]
(2) [inserted: Authorizations.—]
(A) [inserted: In general.—] [inserted: Except as provided in this subsection or existing law, a Federal agency may not revoke, rescind, withdraw, terminate, suspend, amend, alter, or take any other action to interfere with an authorization unless—]
(i) [inserted: the Federal agency is required to take such action by order of a court of competent jurisdiction;]
(ii) [inserted: the holder of the authorization has materially breached the terms of the authorization, or otherwise violated applicable law;]
(iii) [inserted: the authorization was obtained through fraud, intentional concealment, or material misrepresentation;]
(iv) [inserted: such action is necessary to prevent specific, immediate, substantial, and proximate harm or damage to life, property, national security, or defense that was not considered in the underlying environmental review process or final agency action for the authorization; or]
(v) [inserted: the Federal agency has received a request from the holder of the authorization or project sponsor to take such action.]
(B) [inserted: Requirement.—] [inserted: The actions described in subparagraph (A) shall be, as appropriate and where feasible, supported by clear and convincing evidence and reasonably limited in duration and scope by the agency to address the specific issue such action is intended to address.]
(C) [inserted: Notice.—] [inserted: Before an agency takes an action described in subparagraph (A), the agency shall notify the holder of the authorization and the project sponsor in writing of such action, including by providing a detailed explanation of the action, identifying the statutory authority relied upon for the action, and providing the evidence supporting the action.]
(D) [inserted: Judicial review.—]
(i) [inserted: In general.—] [inserted: An action described in subparagraph (A) shall be subject to judicial review under chapter 7 of title 5, United States Code.]
(ii) [inserted: Venue.—] [inserted: A person seeking judicial review of an action described in subparagraph (A) may only obtain review of such action in the United States court of appeals for any circuit wherein the project for which the authorization was issued is located.]
(iii) [inserted: Petitions by Federal agencies.—] [inserted: No Federal agency may petition a court for vacatur or voluntary remand of an authorization unless the holder of the authorization or the project sponsor consents in writing to such a petition.]
(E) [inserted: Savings clause.—] [inserted: Nothing in subparagraph (A) shall be construed to provide any Federal agency new, enhanced, or expanded authority, or to limit any existing authority, concerning any authorization.]
(e) [inserted: Presumption of negative impacts of taking no action relating to tribal trust resources.—] [inserted: For any proposed agency action carried out on, or directly affecting, tribal trust resources (including lands and minerals) that is initiated by the federally recognized Indian Tribe for which the United States holds the affected resources in trust, and for which an environmental document was prepared that included consideration of a no action alternative, there shall be a presumption that the effects of taking no action will be negative for the federally recognized Indian Tribe.]
(f) [inserted: Effect of threshold determinations on other agencies.—] [inserted: If a lead agency determines an environmental document is not required to be prepared with respect to a proposed agency action under subsection (a), another agency may not prepare an environmental document with respect to such proposed agency action.]
[struck: is not required to undertake new scientific or technical research unless the new scientific or technical research is essential to a reasoned choice among alternatives, and the overall costs and time frame of obtaining it are not unreasonable.]
42 U.S.C. § 4336a Timely and unified Federal reviews
19 changes the bill asks for here, 18 carried out
- Carried out:
in subparagraph (B), by striking
at the earliest practicable time
and insertingin accordance with subsection (g)(2)
; - Carried out:
in subparagraph (D), by striking
carry out the proposed agency action
and insertingcarry out the proposed agency action in compliance with the deadlines outlined in subsection (g)
; and - Carried out:
by striking
a review
and insertingan environmental review
; and - Carried out:
by striking
such review
and insertingsuch environmental review
; and - Carried out:
by inserting
(including counties, boroughs, parishes, and other political subdivisions of a State)
afterlocal agency
; and - Carried out:
by adding at the end
Such comments from Federal cooperating agencies shall be limited to matters relating to the proposed agency action with respect to which such Federal cooperating agency has jurisdiction by law.
. - Carried out:
by striking To the extent practicable, and inserting the following:(1) Document.— To the extent practicable,; and
- Carried out:
by adding at the end the following:
(2) Consideration timing.— (A) In general.— In preparing an environmental document for a proposed agency action, no Federal agency shall be required to consider any scientific or technical research that becomes publicly available after the earlier of, as applicable— (i) the date …
- Carried out:
Section 107(d) of the National Environmental Policy Act of 1969 (42 U.S.C. 4336a(d)) is amended by striking
action.
and insertingaction. Where applicable, the statement of purpose and need shall meet the goals of the applicant.
. - Carried out:
by redesignating paragraphs (1), (2), and (3) as paragraphs (3), (5), and (6), respectively;
- Carried out:
by inserting before paragraph (3) (as so redesignated) the following:
(1) Applications for authorizations.— (A) Notification of complete or incomplete application.— Unless a shorter deadline is specified by law, in connection with a proposed agency action for which an applicant submitted an application for an authorization to an agency, not later …
- Not carried out:
by striking
In general
and insertingReview timeline
; and“In general” isn't in § 4336a(g)(3) in the Code as we have it. The law may have changed since the bill was drafted.
Technical detail
“In general” not found in /us/usc/t42/s4336a/g/3 - Carried out:
by striking
(2)
and inserting(5)
; - Carried out:
by inserting after paragraph (3) (as so redesignated) the following:
(4) Deadline for final agency action.— For any proposed agency action for which an applicant submitted an application for an authorization to an agency, not later than 30 days after completing an environmental impact statement or an environmental assessment for the proposed …
- Carried out:
by striking
the deadline described in paragraph (1)
and insertinga deadline described in this subsection
; and - Carried out:
by striking
, in consultation with the applicant, to
and insertingif the applicant approves such extension. If the applicant approves such extension, the lead agency shall
; - Carried out:
by striking
A project sponsor may
and insertingExcept as provided in subparagraph (C), a project sponsor may
; and - Carried out:
by adding at the end the following:
(C) Exception.— A project sponsor that approved an extension of a deadline under paragraph (5) may not obtain judicial review of a failure to act in accordance with such deadline under subparagraph (A) unless the lead agency fails to meet the new deadline or is delaying for …
- Carried out:
by adding at the end the following:
(7) Concurrent review.— In carrying out an environmental review, the lead agency and each cooperating agency shall carry out the obligations of that agency under other applicable laws concurrently, and in conjunction, with other required reviews for the proposed agency action, …
§ 4336a(a)Lead agency(2)–(5)
Start of § 4336a to (a)(2) unchanged ·
(A) supervise the preparation of an environmental document if, with respect to such proposed agency action, there is more than one participating Federal agency;
(B) request the participation of each cooperating agency [struck: at][inserted: in] [struck: the][inserted: accordance] [struck: earliest][inserted: with] [struck: practicable][inserted: subsection] [struck: time][inserted: (g)(2)];
(C) in preparing an environmental document, give consideration to any analysis or proposal created by a cooperating agency;
(D) develop a schedule, in consultation with each cooperating agency, the applicant, and such other entities as the lead agency determines appropriate, for completion of any environmental review, permit, or authorization required to carry out the proposed agency action[inserted: in compliance with the deadlines outlined in subsection (g)];
(E) if the lead agency determines that [struck: a][inserted: an] [inserted: environmental ]review, permit, or authorization will not be completed in accordance with the schedule developed under subparagraph (D), notify the agency responsible for issuing such [inserted: environmental ]review, permit, or authorization of the discrepancy and request that such agency take such measures as such agency determines appropriate to comply with such schedule; and
(F) meet with a cooperating agency that requests such a meeting.
(3) Cooperating agency The lead agency may, with respect to a proposed agency action, designate any Federal, State, Tribal, or local agency [inserted: (including counties, boroughs, parishes, and other political subdivisions of a State) ]that has jurisdiction by law or special expertise with respect to any environmental impact involved in a proposal to serve as a cooperating agency. A cooperating agency may, not later than a date specified in the schedule established by the lead agency, submit comments to the lead agency.[inserted: Such comments from Federal cooperating agencies shall be limited to matters relating to the proposed agency action with respect to which such Federal cooperating agency has jurisdiction by law.]
(4) Request for designation Any Federal, State, Tribal, or local agency or person that is substantially affected by the lack of a designation of a lead agency with respect to a proposed agency action under paragraph (1) may submit a written request for such a designation to a participating Federal agency. An agency that receives a request under this paragraph shall transmit such request to each participating Federal agency and to the Council.
(5) Council designation
§ 4336a(a)–(e)
(a)(5)(A)–(C) unchanged ·
(D) Designation Not later than 40 days after the date of the submission of a request under subparagraph (A), the Council shall designate the lead agency with respect to the relevant proposed agency action.
(b) One document
(1) [inserted: Document.—] [inserted: To the extent practicable, if a proposed agency action will require action by more than one Federal agency and the lead agency has determined that it requires preparation of an environmental document, the lead and cooperating agencies shall evaluate the proposal in a single environmental document.]
(2) [inserted: Consideration timing.—]
(A) [inserted: In general.—] [inserted: In preparing an environmental document for a proposed agency action, no Federal agency shall be required to consider any scientific or technical research that becomes publicly available after the earlier of, as applicable—]
(i) [inserted: the date of receipt of an application with respect to such proposed agency action; and]
(ii) [inserted: the date of publication of a notice of intent or decision to prepare such environmental document for such proposed agency action.]
(B) [inserted: Applicability to other law.—] [inserted: This paragraph does not affect any review of information required under subchapter II of chapter 5 of title 5, United States Code, with respect to comments received during the public comment period as applicable.]
(C) [inserted: Delay.—] [inserted: A Federal agency may not delay the issuance of an environmental document or a final agency action, including any decision or determination, on the basis of awaiting new scientific or technical research or information that was not available as of the earlier of the dates described in subparagraph (A).]
[struck: To the extent practicable, if a proposed agency action will require action by more than one Federal agency and the lead agency has determined that it requires preparation of an environmental document, the lead and cooperating agencies shall evaluate the proposal in a single environmental document.]
(c) Request for public comment Each notice of intent to prepare an environmental impact statement under section 4332 of this title shall include a request for public comment on alternatives or impacts and on relevant information, studies, or analyses with respect to the proposed agency action.
(d) Statement of purpose and need Each environmental document shall include a statement of purpose and need that briefly summarizes the underlying purpose and need for the proposed agency action.[inserted: Where applicable, the statement of purpose and need shall meet the goals of the applicant.]
(e) Page limits
(1) Environmental impact statements
(A) In general Except as provided in subparagraph (B), an environmental impact statement shall not exceed 150 pages, not including any citations or appendices.
§ 4336a(f)–(h)
(e)(1)(B)–(2) unchanged ·
(f) Sponsor preparation A lead agency shall prescribe procedures to allow a project sponsor to prepare an environmental assessment or an environmental impact statement under the supervision of the agency. Such agency may provide such sponsor with appropriate guidance and assist in the preparation. The lead agency shall independently evaluate the environmental document and shall take responsibility for the contents.
(g) Deadlines
(1) [inserted: Applications for authorizations.—]
(A) [inserted: Notification of complete or incomplete application.—] [inserted: Unless a shorter deadline is specified by law, in connection with a proposed agency action for which an applicant submitted an application for an authorization to an agency, not later than 60 days after the date on which the applicant submits the application to the agency, the agency shall document the receipt of the application and—]
(i) [inserted: notify the applicant that the application is complete; or]
(ii) [inserted: notify the applicant that the application is incomplete and request in writing any additional information that the agency needs to determine that the application is complete and begin preparation of an environmental document.]
(B) [inserted: Agency determination.—]
(i) [inserted: Complete determination.—] [inserted: If an agency determines an application is complete under subparagraph (A)(i), the agency shall, not later than 60 days after the date on which the agency makes such determination—]
(I) [inserted: notify the applicant that the agency has determined that the proposed agency action is excluded pursuant to one of the agency’s categorical exclusions, is not a major Federal action, or that no further agency action is required;]
(II) [inserted: issue a notice of intent to prepare an environmental impact statement for such proposed agency action; or]
(III) [inserted: notify the applicant that the agency has determined that preparation of an environmental assessment is necessary.]
(ii) [inserted: Incomplete determination.—] [inserted: If the agency requests additional information under subparagraph (A)(ii), the deadline described in clause (i) shall be based on the date on which the agency receives the additional information instead of the date on which the determination is made.]
(2) [inserted: Cooperating agencies.—]
(A) [inserted: In general.—] [inserted: Not later than 21 days after a lead agency issues a notice of intent under paragraph (1)(B)(i)(II) or notifies an applicant under paragraph (1)(B)(i)(III) with respect to a proposed agency action, the lead agency shall—]
(i) [inserted: identify all agencies that are likely to have environmental review, authorization, or other responsibilities with respect to the proposed agency action; and]
(ii) [inserted: invite each such agency to become a cooperating agency.]
(B) [inserted: Deadline to accept invitation.—] [inserted: Not later than 21 days after an agency receives an invitation to become a cooperating agency under subparagraph (A)(ii), such agency shall accept or deny the invitation.]
(C) [inserted: Convening of cooperating agencies.—] [inserted: Not later than 7 days after the deadline described in subparagraph (B) has passed for each agency that received an invitation to become a cooperating agency under subparagraph (A)(ii), the lead agency that sent each such invitation shall convene each agency that accepts such an invitation to coordinate on developing the schedule under subsection (a)(2)(D) for the applicable proposed agency action.]
(D) [inserted: Unidentified agencies.—] [inserted: In the event that an agency that has jurisdiction by law or special expertise with respect to any environmental impact involved in a proposed agency action is not identified under subparagraph (A)(i), the lead agency with respect to the proposed agency action shall—]
(i) [inserted: invite such unidentified agency to become a cooperating agency by not later than 7 days after becoming aware that the agency has jurisdiction by law or special expertise; and]
(ii) [inserted: if such agency accepts the invitation, incorporate such agency into the schedule developed under subsection (a)(2)(D) and update such schedule accordingly by not later than 14 days after the date on which such agency accepts the invitation.]
[struck: (1)] [inserted: (3)] In general Except as provided in paragraph ([struck: 2][inserted: 5]), with respect to a proposed agency action, a lead agency shall complete, as applicable—
(A) the environmental impact statement not later than the date that is 2 years after the sooner of, as applicable—
(i) the date on which such agency determines that section 4332(2)(C) of this title requires the issuance of an environmental impact statement with respect to such action;
(ii) the date on which such agency notifies the applicant that the application to establish a right-of-way for such action is complete; and
(iii) the date on which such agency issues a notice of intent to prepare the environmental impact statement for such action; and
(B) the environmental assessment not later than the date that is 1 year after the sooner of, as applicable—
(i) the date on which such agency determines that section 4336(b)(2) of this title requires the preparation of an environmental assessment with respect to such action;
(ii) the date on which such agency notifies the applicant that the application to establish a right-of-way for such action is complete; and
(iii) the date on which such agency issues a notice of intent to prepare the environmental assessment for such action.
(4) [inserted: Deadline for final agency action.—] [inserted: For any proposed agency action for which an applicant submitted an application for an authorization to an agency, not later than 30 days after completing an environmental impact statement or an environmental assessment for the proposed agency action, the lead agency, and any cooperating agency, shall issue a final agency action. The agency issuing such final agency action shall include in the final agency action a performance schedule for the completion of any other outstanding authorizations.]
[struck: (2)] [inserted: (5)] Delay A lead agency that determines it is not able to meet [struck: the][inserted: a] deadline described in [struck: paragraph][inserted: this] [struck: (1)][inserted: subsection] may extend such [struck: deadline,][inserted: deadlineif] [struck: in][inserted: the] [struck: consultation][inserted: applicant] [struck: with][inserted: approves] [inserted: such extension. If ]the applicant[inserted: approves such extension], [struck: to][inserted: the] [inserted: lead agency shall ]establish a new deadline that provides only so much additional time as is necessary to complete such environmental impact statement or environmental assessment.
[struck: (3)] [inserted: (6)] Petition to court
(A) Right to petition [struck: A][inserted: Except] [inserted: as provided in subparagraph (C), a ]project sponsor may obtain a review of an alleged failure by an agency to act in accordance with an applicable deadline under this section by filing a written petition with a court of competent jurisdiction seeking an order under subparagraph (B).
(B) Court order If a court of competent jurisdiction finds that an agency has failed to act in accordance with an applicable deadline, the court shall set a schedule and deadline for the agency to act as soon as practicable, which shall not exceed 90 days from the date on which the order of the court is issued, unless the court determines a longer time period is necessary to comply with applicable law.
(C) [inserted: Exception.—] [inserted: A project sponsor that approved an extension of a deadline under paragraph (5) may not obtain judicial review of a failure to act in accordance with such deadline under subparagraph (A) unless the lead agency fails to meet the new deadline or is delaying for reasons other than those necessary to complete its review.]
(7) [inserted: Concurrent review.—] [inserted: In carrying out an environmental review, the lead agency and each cooperating agency shall carry out the obligations of that agency under other applicable laws concurrently, and in conjunction, with other required reviews for the proposed agency action, pursuant to the requirements of applicable law, including, if applicable, under this Act.]
(h) Report
(1) In general The head of each lead agency shall annually submit to the Committee on Natural Resources of the House of Representatives and the Committee on Environment and Public Works of the Senate a report that—
Rest of § 4336a unchanged ·
42 U.S.C. § 4336b Programmatic environmental document
4 changes the bill asks for here, 4 carried out
- Carried out:
by striking When an agency prepares and inserting the following:(a) Programmatic environmental documents.— When an agency prepares;
- Carried out:
in paragraph (1), by striking
5
and inserting10
; - Carried out:
in paragraph (2), by striking
5
and inserting10
; and - Carried out:
by adding at the end the following:
(b) Reliance on previously completed environmental reviews.— (1) Actions that are substantially the same.— A lead agency may satisfy the requirements of this Act with respect to a major Federal action by relying on an environmental assessment, environmental impact statement, or …
§ 4336b(a)–(b)
§ 4336b. Programmatic environmental document
(a) [inserted: Programmatic environmental documents.—] [inserted: When an agency prepares a programmatic environmental document for which judicial review was available, the agency may rely on the analysis included in the programmatic environmental document in a subsequent environmental document for related actions as follows:]
[struck: When an agency prepares a programmatic environmental document for which judicial review was available, the agency may rely on the analysis included in the programmatic environmental document in a subsequent environmental document for related actions as follows:]
(1) Within [struck: 5][inserted: 10] years and without additional review of the analysis in the programmatic environmental document, unless there are substantial new circumstances or information about the significance of adverse effects that bear on the analysis.
(2) After [struck: 5][inserted: 10] years, so long as the agency reevaluates the analysis in the programmatic environmental document and any underlying assumption to ensure reliance on the analysis remains valid.
(b) [inserted: Reliance on previously completed environmental reviews.—]
(1) [inserted: Actions that are substantially the same.—] [inserted: A lead agency may satisfy the requirements of this Act with respect to a major Federal action by relying on an environmental assessment, environmental impact statement, or a categorical exclusion determination that the lead agency, another Federal agency, or a project sponsor under the supervision of a Federal agency completed for another major Federal action if the lead agency determines that—]
(A) [inserted: the new major Federal action is substantially the same as the other major Federal action or, if applicable, an alternative analyzed in such environmental assessment or environmental impact statement; and]
(B) [inserted: if applicable, the effects of the new major Federal action are substantially the same as the effects analyzed in such environmental assessment or environmental impact statement.]
(2) [inserted: Actions that are not substantially the same.—] [inserted: If a new major Federal action is not substantially the same as another major Federal action or an alternative analyzed in an environmental assessment or environmental impact statement completed by the lead agency, another Federal agency, or a project sponsor under the supervision of a Federal agency, the lead agency may modify or augment any such previously completed environmental assessment or environmental impact statement as necessary to satisfy the requirements of this Act with respect to the new major Federal action. The lead agency shall make such modified environmental assessment or environmental impact statement publicly available as a new environmental assessment or environmental impact statement.]
42 U.S.C. § 4336e Definitions
10 changes the bill asks for here, 10 carried out
- Carried out:
by redesignating paragraphs (1) through (13) as paragraphs (2) through (14), respectively;
- Carried out:
by inserting before paragraph (2) (as so redesignated) the following:
(1) Authorization.— The term “authorization” means any lease, right-of-way, easement, license, permit, approval, finding, determination, or other administrative decision issued by an agency or any interagency consultation that is required or authorized under Federal law in order …
- Carried out:
in paragraph (2) (as so redesignated), by inserting
, or Congress deems by statute,
afterFederal agency has determined
; - Carried out:
by inserting
grants (including capitalization grants), cost share awards,
afterloan guarantees,
; - Carried out:
by striking
sufficient
and insertingcomplete
; and - Carried out:
by striking
subsequent use of such financial assistance or the
; - Carried out:
by redesignating clauses (iv) through (vii) as clauses (vi) through (ix), respectively; and
- Carried out:
by inserting after clause (iii) the following:
(iv) farm ownership loans and operating loan guarantees by the Farm Service Agency pursuant to sections 305 and 311 through 319 of the Consolidated Farm and Rural Development Act; (v) the issuance of an authorization by an agency where the effects of the action or project being …
- Carried out:
by adding at the end the following:
(C) Additional exclusions.— An agency action may not be determined to be a major Federal action solely on the basis of the provision of Federal funds, including a grant, loan, loan guarantee, and funding assistance.; and
- Carried out:
by adding at the end the following:
(15) Reasonably foreseeable.— The term “reasonably foreseeable”, with respect to environmental effects of a proposed agency action— (A) means effects that share a reasonably close causal relationship to, and are proximately caused by, the immediate project or action under …
§ 4336e(1)–(15)
§ 4336e. Definitions
In this subchapter:
(1) [inserted: Authorization.—] [inserted: The term “authorization” means any lease, right-of-way, easement, license, permit, approval, finding, determination, or other administrative decision issued by an agency or any interagency consultation that is required or authorized under Federal law in order to construct, modify, or operate a project.]
[struck: (1)] [inserted: (2)] Categorical exclusion The term “categorical exclusion” means a category of actions that a Federal agency has determined[inserted: ,] [inserted: or Congress deems by statute, ]normally does not significantly affect the quality of the human environment within the meaning of section 4332(2)(C) of this title.
[struck: (2)] [inserted: (3)] Cooperating agency The term “cooperating agency” means any Federal, State, Tribal, or local agency that has been designated as a cooperating agency under section 4336a(a)(3) of this title.
[struck: (3)] [inserted: (4)] Council The term “Council” means the Council on Environmental Quality established in subchapter II.
[struck: (4)] [inserted: (5)] Environmental assessment The term “environmental assessment” means an environmental assessment prepared under section 4336(b)(2) of this title.
[struck: (5)] [inserted: (6)] Environmental document The term “environmental document” means an environmental impact statement, an environmental assessment, or a finding of no significant impact.
[struck: (6)] [inserted: (7)] Environmental impact statement The term “environmental impact statement” means a detailed written statement that is required by section 4332(2)(C) of this title.
[struck: (7)] [inserted: (8)] Finding of no significant impact The term “finding of no significant impact” means a determination by a Federal agency that a proposed agency action does not require the issuance of an environmental impact statement.
[struck: (8)] [inserted: (9)] Participating Federal agency The term “participating Federal agency” means a Federal agency participating in an environmental review or authorization of an action.
[struck: (9)] [inserted: (10)] Lead agency The term “lead agency” means, with respect to a proposed agency action—
(A) the agency that proposed such action; or
(B) if there are 2 or more involved Federal agencies with respect to such action, the agency designated under section 4336a(a)(1) of this title.
[struck: (10)] [inserted: (11)] Major Federal action
(A) In general The term “major Federal action” means an action that the agency carrying out such action determines is subject to substantial Federal control and responsibility.
(B) Exclusion The term “major Federal action” does not include—
(i) a non-Federal action—
(I) with no or minimal Federal funding; or
(II) with no or minimal Federal involvement where a Federal agency cannot control the outcome of the project;
(ii) funding assistance solely in the form of general revenue sharing funds which do not provide Federal agency compliance or enforcement responsibility over the subsequent use of such funds;
(iii) loans, loan guarantees, [inserted: grants (including capitalization grants), cost share awards, ]or other forms of financial assistance where a Federal agency does not exercise [struck: sufficient][inserted: complete] control and responsibility over the [struck: subsequent use of such financial assistance or the ]effect of the action;
(iv) [inserted: farm ownership loans and operating loan guarantees by the Farm Service Agency pursuant to sections 305 and 311 through 319 of the Consolidated Farm and Rural Development Act;]
(v) [inserted: the issuance of an authorization by an agency where the effects of the action or project being permitted or authorized were previously evaluated by another agency in compliance with this Act;]
[struck: (iv)] [inserted: (vi)] business loan guarantees provided by the Small Business Administration pursuant to section 7(a) or (b) and1 of the Small Business Act ( U.S.C. 636(a)),2 or title V of the Small Business Investment Act of 1958 (15 U.S.C. 695 et seq.);
[struck: (v)] [inserted: (vii)] bringing judicial or administrative civil or criminal enforcement actions;
[struck: (vi)] [inserted: (viii)] extraterritorial activities or decisions, which means agency activities or decisions with effects located entirely outside of the jurisdiction of the United States; or
[struck: (vii)] [inserted: (ix)] activities or decisions that are non-discretionary and made in accordance with the agency’s statutory authority.
(C) [inserted: Additional exclusions.—] [inserted: An agency action may not be determined to be a major Federal action solely on the basis of the provision of Federal funds, including a grant, loan, loan guarantee, and funding assistance.]
[struck: (11)] [inserted: (12)] Programmatic environmental document The term “programmatic environmental document” means an environmental impact statement or environmental assessment analyzing all or some of the environmental effects of a policy, program, plan, or group of related actions.
[struck: (12)] [inserted: (13)] Proposal The term “proposal” means a proposed action at a stage when an agency has a goal, is actively preparing to make a decision on one or more alternative means of accomplishing that goal, and can meaningfully evaluate its effects.
[struck: (13)] [inserted: (14)] Special expertise The term “special expertise” means statutory responsibility, agency mission, or related program experience.
(15) [inserted: Reasonably foreseeable.—] [inserted: The term “reasonably foreseeable”, with respect to environmental effects of a proposed agency action—]
(A) [inserted: means effects that share a reasonably close causal relationship to, and are proximately caused by, the immediate project or action under consideration; and]
(B) [inserted: does not include effects that are—]
(i) [inserted: speculative;]
(ii) [inserted: attenuated from the proposed agency action;]
(iii) [inserted: separate in time or place from the proposed agency action; or]
(iv) [inserted: in relation to separate existing or potential future projects.]
42 U.S.C. § 4344 Duties and functions
1 change the bill asks for here, 1 carried out
- Carried out:
Section 204 of the National Environmental Policy Act of 1969 (42 U.S.C. 4344) is amended in paragraph (4) by inserting
energy,
afterhealth,
.
§ 4344(3)–(6)
Start of § 4344 to (2) unchanged ·
(3) to review and appraise the various programs and activities of the Federal Government in the light of the policy set forth in subchapter I of this chapter for the purpose of determining the extent to which such programs and activities are contributing to the achievement of such policy, and to make recommendations to the President with respect thereto;
(4) to develop and recommend to the President national policies to foster and promote the improvement of environmental quality to meet the conservation, social, economic, health, [inserted: energy, ]and other requirements and goals of the Nation;
(5) to conduct investigations, studies, surveys, research, and analyses relating to ecological systems and environmental quality;
(6) to document and define changes in the natural environment, including the plant and animal systems, and to accumulate necessary data and other information for a continuing analysis of these changes or trends and an interpretation of their underlying causes;
Rest of § 4344 unchanged ·
42 U.S.C. § 4336c Adoption of categorical exclusions
The bill's words for this section
- Not carried out:
Section 109 of the National Environmental Policy Act of 1969 (42 U.S.C. 4336c) is amended in the text preceding paragraph (1), by inserting
, or that was legislatively enacted by Congress,
afterprocedures
.We can't read how this instruction is worded yet, so it isn't shown in the text.
Technical detail
no-pattern: in the text preceding paragraph (X), by inserting QTEXT after QTEXT.