Skip to content
The People's CodeSearch
Menu

Title 42 · The Public Health and Welfare

Changes to 42 U.S.C. § 4336a

H.R. 4776 · SPEED Act ·

Passed the House · step 3 of 5

Sections are cited like “7 U.S.C. § 2012”: 7 of the , 2012.

42 U.S.C. § 4336a Timely and unified Federal reviews

+84 −31Shown
More for 42 U.S.C. § 4336a
Read § 4336a
19 changes the bill asks for here, 19 carried out
  1. Carried out:

    in subparagraph (B), by striking at the earliest practicable time and inserting in accordance with subsection (g)(2);

  2. Carried out:

    in subparagraph (D), by striking carry out the proposed agency action and inserting carry out the proposed agency action in compliance with the deadlines outlined in subsection (g); and

  3. Carried out:

    by striking a review and inserting an environmental review; and

  4. Carried out:

    by striking such review and inserting such environmental review; and

  5. Carried out:

    by inserting (including counties, boroughs, parishes, and other political subdivisions of a State) after local agency; and

  6. Carried out:

    by adding at the end Such comments from Federal cooperating agencies shall be limited to matters relating to the proposed agency action with respect to which such Federal cooperating agency has jurisdiction by law..

  7. Carried out:

    by striking To the extent practicable, and inserting the following:(1) Document.— To the extent practicable,; and

  8. Carried out:

    by adding at the end the following:(2) Consideration timing.— (A) In general.— In preparing an environmental document for a proposed agency action, no Federal agency shall be required to consider any scientific or technical research that becomes publicly available after the earlier of, as applicable— (i) the date …

  9. Carried out:

    Section 107(d) of the National Environmental Policy Act of 1969 (42 U.S.C. 4336a(d)) is amended by striking action. and inserting action. Where applicable, the statement of purpose and need shall meet the goals of the applicant..

  10. Carried out:

    by redesignating paragraphs (1), (2), and (3) as paragraphs (3), (5), and (6), respectively;

  11. Carried out:

    by inserting before paragraph (3) (as so redesignated) the following:(1) Applications for authorizations.— (A) Notification of complete or incomplete application.— Unless a shorter deadline is specified by law, in connection with a proposed agency action for which an applicant submitted an application for an authorization to an agency, not later …

  12. Carried out:

    by striking In general and inserting Review timeline; and

  13. Carried out:

    by striking (2) and inserting (5);

  14. Carried out:

    by inserting after paragraph (3) (as so redesignated) the following:(4) Deadline for final agency action.— For any proposed agency action for which an applicant submitted an application for an authorization to an agency, not later than 30 days after completing an environmental impact statement or an environmental assessment for the proposed …

  15. Carried out:

    by striking the deadline described in paragraph (1) and inserting a deadline described in this subsection; and

  16. Carried out:

    by striking , in consultation with the applicant, to and inserting if the applicant approves such extension. If the applicant approves such extension, the lead agency shall;

  17. Carried out:

    by striking A project sponsor may and inserting Except as provided in subparagraph (C), a project sponsor may; and

  18. Carried out:

    by adding at the end the following:(C) Exception.— A project sponsor that approved an extension of a deadline under paragraph (5) may not obtain judicial review of a failure to act in accordance with such deadline under subparagraph (A) unless the lead agency fails to meet the new deadline or is delaying for …

  19. Carried out:

    by adding at the end the following:(7) Concurrent review.— In carrying out an environmental review, the lead agency and each cooperating agency shall carry out the obligations of that agency under other applicable laws concurrently, and in conjunction, with other required reviews for the proposed agency action, …

§ 4336a(a)Lead agency(2)–(5)

Start of § 4336a to (a)(2) unchanged

WhereMarkThe Code nowMarkAs the bill would leave it
(2)(A)(A) (A)
supervise the preparation of an environmental document if, with respect to such proposed agency action, there is more than one participating Federal agency;supervise the preparation of an environmental document if, with respect to such proposed agency action, there is more than one participating Federal agency;
(2)(B)(B) (B)
request the participation of each cooperating agency [struck: at] [struck: the] [struck: earliest] [struck: practicable] [struck: time];request the participation of each cooperating agency [inserted: in] [inserted: accordance] [inserted: with] [inserted: subsection] [inserted: (g)(2)];
(2)(C)(C) (C)
in preparing an environmental document, give consideration to any analysis or proposal created by a cooperating agency;in preparing an environmental document, give consideration to any analysis or proposal created by a cooperating agency;
(2)(D)(D) (D)
develop a schedule, in consultation with each cooperating agency, the applicant, and such other entities as the lead agency determines appropriate, for completion of any environmental review, permit, or authorization required to carry out the proposed agency action;develop a schedule, in consultation with each cooperating agency, the applicant, and such other entities as the lead agency determines appropriate, for completion of any environmental review, permit, or authorization required to carry out the proposed agency action[inserted: in compliance with the deadlines outlined in subsection (g)];
(2)(E)(E) (E)
if the lead agency determines that [struck: a] review, permit, or authorization will not be completed in accordance with the schedule developed under subparagraph (D), notify the agency responsible for issuing such review, permit, or authorization of the discrepancy and request that such agency take such measures as such agency determines appropriate to comply with such schedule; andif the lead agency determines that [inserted: an] [inserted: environmental ]review, permit, or authorization will not be completed in accordance with the schedule developed under subparagraph (D), notify the agency responsible for issuing such [inserted: environmental ]review, permit, or authorization of the discrepancy and request that such agency take such measures as such agency determines appropriate to comply with such schedule; and
(2)(F)(F) (F)
meet with a cooperating agency that requests such a meeting.meet with a cooperating agency that requests such a meeting.
(3)(3) Cooperating agency(3) Cooperating agency
The lead agency may, with respect to a proposed agency action, designate any Federal, State, Tribal, or local agency that has jurisdiction by law or special expertise with respect to any environmental impact involved in a proposal to serve as a cooperating agency. A cooperating agency may, not later than a date specified in the schedule established by the lead agency, submit comments to the lead agency.The lead agency may, with respect to a proposed agency action, designate any Federal, State, Tribal, or local agency [inserted: (including counties, boroughs, parishes, and other political subdivisions of a State) ]that has jurisdiction by law or special expertise with respect to any environmental impact involved in a proposal to serve as a cooperating agency. A cooperating agency may, not later than a date specified in the schedule established by the lead agency, submit comments to the lead agency.[inserted: Such comments from Federal cooperating agencies shall be limited to matters relating to the proposed agency action with respect to which such Federal cooperating agency has jurisdiction by law.]
(4)(4) Request for designation(4) Request for designation
Any Federal, State, Tribal, or local agency or person that is substantially affected by the lack of a designation of a lead agency with respect to a proposed agency action under paragraph (1) may submit a written request for such a designation to a participating Federal agency. An agency that receives a request under this paragraph shall transmit such request to each participating Federal agency and to the Council.Any Federal, State, Tribal, or local agency or person that is substantially affected by the lack of a designation of a lead agency with respect to a proposed agency action under paragraph (1) may submit a written request for such a designation to a participating Federal agency. An agency that receives a request under this paragraph shall transmit such request to each participating Federal agency and to the Council.
(5)(5) Council designation(5) Council designation

§ 4336a(a)–(e)

(a)(5)(A)–(C) unchanged

WhereMarkThe Code nowMarkAs the bill would leave it
(a)(5)(D)(D) Designation(D) Designation
Not later than 40 days after the date of the submission of a request under subparagraph (A), the Council shall designate the lead agency with respect to the relevant proposed agency action.Not later than 40 days after the date of the submission of a request under subparagraph (A), the Council shall designate the lead agency with respect to the relevant proposed agency action.
(b)(b) One document(b) One document
(b)(1)(1) [inserted: Document.—]
[inserted: To the extent practicable, if a proposed agency action will require action by more than one Federal agency and the lead agency has determined that it requires preparation of an environmental document, the lead and cooperating agencies shall evaluate the proposal in a single environmental document.]
(b)(2)(2) [inserted: Consideration timing.—]
(b)(2)(A)(A) [inserted: In general.—]
[inserted: In preparing an environmental document for a proposed agency action, no Federal agency shall be required to consider any scientific or technical research that becomes publicly available after the earlier of, as applicable—]
(b)(2)(A)(i)(i) [inserted: ]
[inserted: the date of receipt of an application with respect to such proposed agency action; and]
(b)(2)(A)(ii)(ii) [inserted: ]
[inserted: the date of publication of a notice of intent or decision to prepare such environmental document for such proposed agency action.]
(b)(2)(B)(B) [inserted: Applicability to other law.—]
[inserted: This paragraph does not affect any review of information required under subchapter II of chapter 5 of title 5, United States Code, with respect to comments received during the public comment period as applicable.]
(b)(2)(C)(C) [inserted: Delay.—]
[inserted: A Federal agency may not delay the issuance of an environmental document or a final agency action, including any decision or determination, on the basis of awaiting new scientific or technical research or information that was not available as of the earlier of the dates described in subparagraph (A).]
(b)[struck: To the extent practicable, if a proposed agency action will require action by more than one Federal agency and the lead agency has determined that it requires preparation of an environmental document, the lead and cooperating agencies shall evaluate the proposal in a single environmental document.]
(c)(c) Request for public comment(c) Request for public comment
Each notice of intent to prepare an environmental impact statement under section 4332 of this title shall include a request for public comment on alternatives or impacts and on relevant information, studies, or analyses with respect to the proposed agency action.Each notice of intent to prepare an environmental impact statement under section 4332 of this title shall include a request for public comment on alternatives or impacts and on relevant information, studies, or analyses with respect to the proposed agency action.
(d)(d) Statement of purpose and need(d) Statement of purpose and need
Each environmental document shall include a statement of purpose and need that briefly summarizes the underlying purpose and need for the proposed agency action.Each environmental document shall include a statement of purpose and need that briefly summarizes the underlying purpose and need for the proposed agency action.[inserted: Where applicable, the statement of purpose and need shall meet the goals of the applicant.]
(e)(e) Page limits(e) Page limits
(e)(1)(1) Environmental impact statements(1) Environmental impact statements
(e)(1)(A)(A) In general(A) In general
Except as provided in subparagraph (B), an environmental impact statement shall not exceed 150 pages, not including any citations or appendices.Except as provided in subparagraph (B), an environmental impact statement shall not exceed 150 pages, not including any citations or appendices.

§ 4336a(f)–(h)

(e)(1)(B)–(2) unchanged

WhereMarkThe Code nowMarkAs the bill would leave it
(f)(f) Sponsor preparation(f) Sponsor preparation
A lead agency shall prescribe procedures to allow a project sponsor to prepare an environmental assessment or an environmental impact statement under the supervision of the agency. Such agency may provide such sponsor with appropriate guidance and assist in the preparation. The lead agency shall independently evaluate the environmental document and shall take responsibility for the contents.A lead agency shall prescribe procedures to allow a project sponsor to prepare an environmental assessment or an environmental impact statement under the supervision of the agency. Such agency may provide such sponsor with appropriate guidance and assist in the preparation. The lead agency shall independently evaluate the environmental document and shall take responsibility for the contents.
(g)(g) Deadlines(g) Deadlines
(g)(1)(1) [inserted: Applications for authorizations.—]
(g)(1)(A)(A) [inserted: Notification of complete or incomplete application.—]
[inserted: Unless a shorter deadline is specified by law, in connection with a proposed agency action for which an applicant submitted an application for an authorization to an agency, not later than 60 days after the date on which the applicant submits the application to the agency, the agency shall document the receipt of the application and—]
(g)(1)(A)(i)(i) [inserted: ]
[inserted: notify the applicant that the application is complete; or]
(g)(1)(A)(ii)(ii) [inserted: ]
[inserted: notify the applicant that the application is incomplete and request in writing any additional information that the agency needs to determine that the application is complete and begin preparation of an environmental document.]
(g)(1)(B)(B) [inserted: Agency determination.—]
(g)(1)(B)(i)(i) [inserted: Complete determination.—]
[inserted: If an agency determines an application is complete under subparagraph (A)(i), the agency shall, not later than 60 days after the date on which the agency makes such determination—]
(g)(1)(B)(i)(I)(I) [inserted: ]
[inserted: notify the applicant that the agency has determined that the proposed agency action is excluded pursuant to one of the agency’s categorical exclusions, is not a major Federal action, or that no further agency action is required;]
(g)(1)(B)(i)(II)(II) [inserted: ]
[inserted: issue a notice of intent to prepare an environmental impact statement for such proposed agency action; or]
(g)(1)(B)(i)(III)(III) [inserted: ]
[inserted: notify the applicant that the agency has determined that preparation of an environmental assessment is necessary.]
(g)(1)(B)(ii)(ii) [inserted: Incomplete determination.—]
[inserted: If the agency requests additional information under subparagraph (A)(ii), the deadline described in clause (i) shall be based on the date on which the agency receives the additional information instead of the date on which the determination is made.]
(g)(2)(2) [inserted: Cooperating agencies.—]
(g)(2)(A)(A) [inserted: In general.—]
[inserted: Not later than 21 days after a lead agency issues a notice of intent under paragraph (1)(B)(i)(II) or notifies an applicant under paragraph (1)(B)(i)(III) with respect to a proposed agency action, the lead agency shall—]
(g)(2)(A)(i)(i) [inserted: ]
[inserted: identify all agencies that are likely to have environmental review, authorization, or other responsibilities with respect to the proposed agency action; and]
(g)(2)(A)(ii)(ii) [inserted: ]
[inserted: invite each such agency to become a cooperating agency.]
(g)(2)(B)(B) [inserted: Deadline to accept invitation.—]
[inserted: Not later than 21 days after an agency receives an invitation to become a cooperating agency under subparagraph (A)(ii), such agency shall accept or deny the invitation.]
(g)(2)(C)(C) [inserted: Convening of cooperating agencies.—]
[inserted: Not later than 7 days after the deadline described in subparagraph (B) has passed for each agency that received an invitation to become a cooperating agency under subparagraph (A)(ii), the lead agency that sent each such invitation shall convene each agency that accepts such an invitation to coordinate on developing the schedule under subsection (a)(2)(D) for the applicable proposed agency action.]
(g)(2)(D)(D) [inserted: Unidentified agencies.—]
[inserted: In the event that an agency that has jurisdiction by law or special expertise with respect to any environmental impact involved in a proposed agency action is not identified under subparagraph (A)(i), the lead agency with respect to the proposed agency action shall—]
(g)(2)(D)(i)(i) [inserted: ]
[inserted: invite such unidentified agency to become a cooperating agency by not later than 7 days after becoming aware that the agency has jurisdiction by law or special expertise; and]
(g)(2)(D)(ii)(ii) [inserted: ]
[inserted: if such agency accepts the invitation, incorporate such agency into the schedule developed under subsection (a)(2)(D) and update such schedule accordingly by not later than 14 days after the date on which such agency accepts the invitation.]
(g)(3)[struck: (1)] [struck: In] [struck: general][inserted: (3)] [inserted: Review] [inserted: timeline]
Except as provided in paragraph ([struck: 2]), with respect to a proposed agency action, a lead agency shall complete, as applicable—Except as provided in paragraph ([inserted: 5]), with respect to a proposed agency action, a lead agency shall complete, as applicable—
(g)(3)(A)(A) (A)
the environmental impact statement not later than the date that is 2 years after the sooner of, as applicable—the environmental impact statement not later than the date that is 2 years after the sooner of, as applicable—
(g)(3)(A)(i)(i) (i)
the date on which such agency determines that section 4332(2)(C) of this title requires the issuance of an environmental impact statement with respect to such action;the date on which such agency determines that section 4332(2)(C) of this title requires the issuance of an environmental impact statement with respect to such action;
(g)(3)(A)(ii)(ii) (ii)
the date on which such agency notifies the applicant that the application to establish a right-of-way for such action is complete; andthe date on which such agency notifies the applicant that the application to establish a right-of-way for such action is complete; and
(g)(3)(A)(iii)(iii) (iii)
the date on which such agency issues a notice of intent to prepare the environmental impact statement for such action; andthe date on which such agency issues a notice of intent to prepare the environmental impact statement for such action; and
(g)(3)(B)(B) (B)
the environmental assessment not later than the date that is 1 year after the sooner of, as applicable—the environmental assessment not later than the date that is 1 year after the sooner of, as applicable—
(g)(3)(B)(i)(i) (i)
the date on which such agency determines that section 4336(b)(2) of this title requires the preparation of an environmental assessment with respect to such action;the date on which such agency determines that section 4336(b)(2) of this title requires the preparation of an environmental assessment with respect to such action;
(g)(3)(B)(ii)(ii) (ii)
the date on which such agency notifies the applicant that the application to establish a right-of-way for such action is complete; andthe date on which such agency notifies the applicant that the application to establish a right-of-way for such action is complete; and
(g)(3)(B)(iii)(iii) (iii)
the date on which such agency issues a notice of intent to prepare the environmental assessment for such action.the date on which such agency issues a notice of intent to prepare the environmental assessment for such action.
(g)(4)(4) [inserted: Deadline for final agency action.—]
[inserted: For any proposed agency action for which an applicant submitted an application for an authorization to an agency, not later than 30 days after completing an environmental impact statement or an environmental assessment for the proposed agency action, the lead agency, and any cooperating agency, shall issue a final agency action. The agency issuing such final agency action shall include in the final agency action a performance schedule for the completion of any other outstanding authorizations.]
(g)(5)[struck: (2)] Delay[inserted: (5)] Delay
A lead agency that determines it is not able to meet [struck: the] deadline described in [struck: paragraph] [struck: (1)] may extend such deadline[struck: ,] [struck: in] [struck: consultation] [struck: with] the applicant, [struck: to] establish a new deadline that provides only so much additional time as is necessary to complete such environmental impact statement or environmental assessment.A lead agency that determines it is not able to meet [inserted: a] deadline described in [inserted: this] [inserted: subsection] may extend such deadline [inserted: if] [inserted: the] [inserted: applicant] [inserted: approves such extension. If ]the applicant[inserted: approves such extension], [inserted: the] [inserted: lead agency shall ]establish a new deadline that provides only so much additional time as is necessary to complete such environmental impact statement or environmental assessment.
(g)(6)[struck: (3)] Petition to court[inserted: (6)] Petition to court
(g)(6)(A)(A) Right to petition(A) Right to petition
[struck: A] project sponsor may obtain a review of an alleged failure by an agency to act in accordance with an applicable deadline under this section by filing a written petition with a court of competent jurisdiction seeking an order under subparagraph (B).[inserted: Except] [inserted: as provided in subparagraph (C), a ]project sponsor may obtain a review of an alleged failure by an agency to act in accordance with an applicable deadline under this section by filing a written petition with a court of competent jurisdiction seeking an order under subparagraph (B).
(g)(6)(B)(B) Court order(B) Court order
If a court of competent jurisdiction finds that an agency has failed to act in accordance with an applicable deadline, the court shall set a schedule and deadline for the agency to act as soon as practicable, which shall not exceed 90 days from the date on which the order of the court is issued, unless the court determines a longer time period is necessary to comply with applicable law.If a court of competent jurisdiction finds that an agency has failed to act in accordance with an applicable deadline, the court shall set a schedule and deadline for the agency to act as soon as practicable, which shall not exceed 90 days from the date on which the order of the court is issued, unless the court determines a longer time period is necessary to comply with applicable law.
(g)(6)(C)(C) [inserted: Exception.—]
[inserted: A project sponsor that approved an extension of a deadline under paragraph (5) may not obtain judicial review of a failure to act in accordance with such deadline under subparagraph (A) unless the lead agency fails to meet the new deadline or is delaying for reasons other than those necessary to complete its review.]
(g)(7)(7) [inserted: Concurrent review.—]
[inserted: In carrying out an environmental review, the lead agency and each cooperating agency shall carry out the obligations of that agency under other applicable laws concurrently, and in conjunction, with other required reviews for the proposed agency action, pursuant to the requirements of applicable law, including, if applicable, under this Act.]
(h)(h) Report(h) Report
(h)(1)(1) In general(1) In general
The head of each lead agency shall annually submit to the Committee on Natural Resources of the House of Representatives and the Committee on Environment and Public Works of the Senate a report that—The head of each lead agency shall annually submit to the Committee on Natural Resources of the House of Representatives and the Committee on Environment and Public Works of the Senate a report that—

Rest of § 4336a unchanged

Step through the changes