Changes to the Code
H.R. 4790 · All Aboard Act of 2025 · Introduced The text as a member of Congress first filed it. Most bills never get further than this.
In committee · step 2 of 5
23 U.S.C. § 130 Railway-highway crossings
2 changes the bill asks for here, 2 carried out
- Carried out:
by redesignating subparagraphs (B) and (C) as subparagraphs (C) and (D), respectively; and
- Carried out:
by inserting after subparagraph (A) the following:
(B) Installation of protective devices.— At least ½ of the funds set aside each fiscal year under subparagraph (A) shall be available for the installation of protective devices at railway-highway crossings..
§ 130(e)–(f)
Start of § 130 to (e) unchanged ·
(1) In general.—
(A) Set aside.— Before making an apportionment under section 104(b)(3) for a fiscal year, the Secretary shall set aside, from amounts made available to carry out the highway safety improvement program under section 148 for such fiscal year, for the elimination of hazards, the installation of protective devices at railway-highway crossings, the replacement of functionally obsolete warning devices, and as described in subparagraph (B), not less than $245,000,000 for each of fiscal years 2022 through 2026.
(B) [inserted: Installation of protective devices.—] [inserted: At least ½ of the funds set aside each fiscal year under subparagraph (A) shall be available for the installation of protective devices at railway-highway crossings.]
[struck: (B)] [inserted: (C)] Reducing trespassing fatalities and injuries.— A State may use funds set aside under subparagraph (A) for projects to reduce pedestrian fatalities and injuries from trespassing at grade crossings.
[struck: (C)] [inserted: (D)] Obligation availability.— Sums set aside each fiscal year under subparagraph (A) shall be available for obligation in the same manner as funds apportioned under section 104(b)(1).
(2) Special rule.— If a State demonstrates to the satisfaction of the Secretary that the State has met all its needs for installation of protective devices at railway-highway crossings, the State may use funds made available by this section for other highway safety improvement program purposes.
(f) Apportionment.—
Rest of § 130 unchanged ·
49 U.S.C. § 22907 Consolidated rail infrastructure and safety improvements
5 changes the bill asks for here, 5 carried out
- Carried out:
Section 22907(b) of title 49, United States Code, is amended by adding at the end the following:
(14) A Class I railroad company only if— (A) the entity uses the funds to install electrification infrastructure; (B) the project uses project labor agreements; (C) the project includes enforceable agreements to hire from local communities; (D) the entity complies with section …
- Carried out:
Section 22907(c) of title 49, United States Code, is amended by adding at the end the following:
(17) Any project to facilitate zero-emission locomotive infrastructure, including projects— (A) to electrify publicly-owned or Amtrak-owned routes; (B) to rehabilitate or improve existing locomotives, MU locomotives, or trains (including engines) to reduce emissions; (C) to …
- Carried out:
Section 22907(d) of title 49, United States Code, is amended to read as follows:
(d) Application process.— (1) In general.— The Secretary shall prescribe the form and manner of filing an application under this section. (2) Workforce development requirements.— Each application for a grant under this section shall include a transition plan that examines the …
- Carried out:
by redesignating paragraphs (2) and (3) as paragraphs (3) and (4), respectively; and
- Carried out:
by inserting after paragraph (1) the following:
(2) Priority for rail electrification.— In selecting a recipient of a grant for an eligible project, the Secretary shall give priority to a proposed project that includes electrification infrastructure (as defined in the All Aboard Act of 2025)— (A) in freight railyards or …
§ 22907(b)–(c)
Start of § 22907 to (b)(11) unchanged ·
(12) A University transportation center engaged in rail-related research.
(13) A non-profit labor organization representing a class or craft of employees of rail carriers or rail carrier contractors.
(14) [inserted: A Class I railroad company only if—]
(A) [inserted: the entity uses the funds to install electrification infrastructure;]
(B) [inserted: the project uses project labor agreements;]
(C) [inserted: the project includes enforceable agreements to hire from local communities;]
(D) [inserted: the entity complies with section 22404 of title 49, United States Code; and]
(E) [inserted: the project is in partnership with at least 1 of the entities described in paragraphs (1) through (5).]
(c) Eligible Projects.— The following projects are eligible to receive grants under this section:
(1) Deployment of railroad safety technology, including positive train control and rail integrity inspection systems.
§ 22907(c)–(g)
(c)(2)–(14) unchanged ·
(15) The preparation of emergency plans for communities through which hazardous materials are transported by rail.
(16) Rehabilitating, remanufacturing, procuring, or overhauling locomotives, provided that such activities result in a significant reduction of emissions.
(17) [inserted: Any project to facilitate zero-emission locomotive infrastructure, including projects—]
(A) [inserted: to electrify publicly-owned or Amtrak-owned routes;]
(B) [inserted: to rehabilitate or improve existing locomotives, MU locomotives, or trains (including engines) to reduce emissions;]
(C) [inserted: to purchase railroad infrastructure and right of way from freight railroads—]
(i) [inserted: to expand passenger rail or regional rail; or]
(ii) [inserted: with the intent to electrify rail in the future;]
(D) [inserted: to build electrified rail corridors;]
(E) [inserted: to electrify rail yards;]
(F) [inserted: to lease or acquire an easement along a right-of-way for electrification;]
(G) [inserted: to purchase electrification equipment and rolling stock or other zero-emission locomotives, MU locomotives, and equipment;]
(H) [inserted: to ensure new electrification infrastructure is climate-resilient; and]
(I) [inserted: to engage in robust engagement with communities impacted by any new rail infrastructure.]
(d) Application [struck: Process][inserted: process].—
(1) [inserted: In general.—] [inserted: The Secretary shall prescribe the form and manner of filing an application under this section.]
(2) [inserted: Workforce development requirements.—] [inserted: Each application for a grant under this section shall include a transition plan that examines the impact of the proposed project on the workforce of the eligible entity and includes—]
(A) [inserted: an identification of skills gaps, training needs, and retraining needs of the workforce;]
(B) [inserted: a plan to operate and maintain infrastructure of the project using existing insourced workforce;]
(C) [inserted: a plan to avoid displacement of the workforce;]
(D) [inserted: an identification of the steps the eligible entity will take to offset any identified negative impact or potential displacement of the workforce, including how the entity will use the funds from the grant and its own funding to implement the transition plan; and]
(E) [inserted: a description of how the eligible entity will work with any organizations representing the workforce to implement the transition plan.]
(3) [inserted: Requirements for rail electrification projects.—] [inserted: Each application for a grant for an eligible project described under subsection (c)(17) shall include—]
(A) [inserted: plans for robust engagement, early in the project planning process, with communities impacted by any new rail electrification infrastructure;]
(B) [inserted: plans for hiring from local communities, displaced rail workers, tribal and indigenous communities, and environmental justice communities; and]
(C) [inserted: a description of wage and apprenticeship requirements for individuals employed to construct, operate, and maintain rail electrification infrastructure.]
[struck: The Secretary shall prescribe the form and manner of filing an application under this section.]
(e) Project Selection Criteria.—
(1) In general.— In selecting a recipient of a grant for an eligible project, the Secretary shall—
(A) give preference to a proposed project for which the proposed Federal share of total project costs does not exceed 50 percent; and
(B) after factoring in preference to projects under subparagraph (A), select projects that will maximize the net benefits of the funds appropriated for use under this section, considering the cost-benefit analysis of the proposed project, including anticipated private and public benefits relative to the costs of the proposed project and factoring in the other considerations described in paragraph (2).
(2) [inserted: Priority for rail electrification.—] [inserted: In selecting a recipient of a grant for an eligible project, the Secretary shall give priority to a proposed project that includes electrification infrastructure (as defined in the All Aboard Act of 2025)—]
(A) [inserted: in freight railyards or corridors in environmental justice communities; and]
(B) [inserted: along new or existing rail corridors.]
[struck: (2)] [inserted: (3)] Other considerations.— The Secretary shall also consider the following:
(A) The degree to which the proposed project’s business plan considers potential private sector participation in the financing, construction, or operation of the project.
(B) The recipient’s past performance in developing and delivering similar projects, and previous financial contributions.
(C) Whether the recipient has or will have the legal, financial, and technical capacity to carry out the proposed project, satisfactory continuing control over the use of the equipment or facilities, and the capability and willingness to maintain the equipment or facilities.
(D) If applicable, the consistency of the proposed project with planning guidance and documents set forth by the Secretary or required by law or State rail plans developed under chapter 227.
(E) If applicable, any technical evaluation ratings the proposed project received under previous competitive grant programs administered by the Secretary.
(F) Such other factors as the Secretary considers relevant to the successful delivery of the project.
[struck: (3)] [inserted: (4)] Benefits.— The benefits described in paragraph (1)(B) may include the effects on system and service performance, including measures such as improved safety, competitiveness, reliability, trip or transit time, resilience, efficiencies from improved integration with other modes, the ability to meet existing or anticipated demand, and any other benefits.
(f) Performance Measures.— The Secretary shall establish performance measures for each grant recipient to assess progress in achieving strategic goals and objectives. The Secretary may require a grant recipient to periodically report information related to such performance measures.
(g) Rural Areas.—
Rest of § 22907 unchanged ·
49 U.S.C. § 24305 General authority
1 change the bill asks for here, 1 carried out
- Carried out:
Section 24305 of title 49, United States Code, is amended by adding at the end the following:
(g) Use of Federal grant funds.— Unless specifically prohibited by law or inconsistent with a grant agreement pursuant to which the relevant funding was provided, Amtrak or States may use grant funding received from the Federal Government to cover any non-Federal share of costs …
§ 24305(f)–(g)
Start of § 24305 to (f)(4)(A)(ii) unchanged ·
(iii) the articles, material, or supplies, or the articles, material, or supplies from which they are manufactured, are not mined, produced, or manufactured in the United States in sufficient and reasonably available commercial quantities and are not of a satisfactory quality; or
(B) rolling stock or power train equipment cannot be bought and delivered in the United States within a reasonable time.
(g) [inserted: Use of Federal grant funds.—] [inserted: Unless specifically prohibited by law or inconsistent with a grant agreement pursuant to which the relevant funding was provided, Amtrak or States may use grant funding received from the Federal Government to cover any non-Federal share of costs required to be paid under grant programs authorized in title 23 or 49, United States Code, or in other Federal laws, to the extent necessary to advance critical intercity passenger rail investments.]
49 U.S.C. § 24911 Federal-State partnership for intercity passenger rail
5 changes the bill asks for here, 5 carried out
- Carried out:
by redesignating paragraphs (1) through (3) as paragraphs (2) through (4), respectively; and
- Carried out:
by inserting before paragraph (2), as redesignated, the following:
(1) the Secretary shall give priority to projects that install or upgrade infrastructure that will enable high-performance passenger rail along new or existing rail corridors regardless of the location of such projects within the United States;.
- Carried out:
in subclause (IV), by striking
; and
and inserting a semicolon;
- Carried out:
in subclause (V), by inserting
and
after the semicolon at the end;
and - Carried out:
by adding at the end the following:
(VI) anticipated positive impacts of the project's efforts to electrify the corridor, or make improvements to allow for electrification infrastructure (as defined in the All Aboard Act of 2025) in the future;.
§ 24911(c)–(e)
Start of § 24911 to (c)(4) unchanged ·
(5) The planning, environmental studies, and final design for a project or group of projects described in paragraphs (1) through (4).
(d) Project Selection Criteria.— In selecting a project for funding under this section—
(1) [inserted: the Secretary shall give priority to projects that install or upgrade infrastructure that will enable high-performance passenger rail along new or existing rail corridors regardless of the location of such projects within the United States;]
[struck: (1)] [inserted: (2)] for projects located on the Northeast Corridor, the Secretary shall—
(A) make selections consistent with the Northeast Corridor Project Inventory published pursuant to subsection (e)(1), unless when necessary to address materially changed infrastructure or service conditions, changes in project sponsor capabilities or commitments, or other significant changes since the completion of the most recently issued Northeast Corridor Project Inventory; and
(B) for projects that benefit intercity and commuter rail services, only make such selections when Amtrak and the public authorities providing commuter rail passenger transportation at the eligible project location—
(i) are in compliance with section 24905(c)(2); and
(ii) identify funding for the intercity passenger rail share, the commuter rail share, and the local share of the eligible project before the commencement of the project;
[struck: (2)] [inserted: (3)] for projects not located on the Northeast Corridor, the Secretary shall—
(A) give preference to eligible projects—
(i) for which Amtrak is not the sole applicant;
(ii) that improve the financial performance, reliability, service frequency, or address the state of good repair of an Amtrak route; and
(iii) that are identified in, and consistent with, a corridor inventory prepared under the Corridor Identification and Development Program pursuant to section 25101; and
(B) take into account—
(i) the cost-benefit analysis of the proposed project, including anticipated private and public benefits relative to the costs of the proposed project, including—
(I) effects on system and service performance, including as measured by applicable metrics set forth in part 273 of title 49, Code of Federal Regulations (or successor regulations);
(II) effects on safety, competitiveness, reliability, trip or transit time, greenhouse gas emissions, and resilience;
(III) anticipated positive economic and employment impacts, including development in areas near passenger stations, historic districts, or other opportunity zones;
(IV) efficiencies from improved connections with other modes;[struck: and]
(V) ability to meet existing or anticipated demand;[inserted: and]
(VI) [inserted: anticipated positive impacts of the project's efforts to electrify the corridor, or make improvements to allow for electrification infrastructure (as defined in the All Aboard Act of 2025) in the future;]
(ii) the degree to which the proposed project’s business plan considers potential private sector participation in the financing, construction, or operation of the proposed project;
(iii) the applicant’s past performance in developing and delivering similar projects, and previous financial contributions;
(iv) whether the applicant has, or will have—
(I) the legal, financial, and technical capacity to carry out the project;
(II) satisfactory continuing access to the equipment or facilities; and
(III) the capability and willingness to maintain the equipment or facilities;
(v) if applicable, the consistency of the project with planning guidance and documents set forth by the Secretary or otherwise required by law;
(vi) whether the proposed project serves historically unconnected or underconnected communities; and
(vii) any other relevant factors, as determined by the Secretary; and
[struck: (3)] [inserted: (4)] the Secretary shall reserve—
(A) not less than 45 percent of the amounts appropriated for grants under this section for projects not located along the Northeast Corridor, of which not less than 20 percent shall be for projects that benefit (in whole or in part) a long-distance route; and
(B) not less than 45 percent of the amounts appropriated for grants under this section for projects listed on the Northeast Corridor project inventory published pursuant to subsection (e)(1).
(e) Long-term Planning.— Not later than 1 year after the date of enactment of the Passenger Rail Expansion and Rail Safety Act of 2021, and every 2 years thereafter, the Secretary shall create a predictable project pipeline that will assist Amtrak, States, and the public with long-term capital planning by publishing a Northeast Corridor project inventory that—
(1) identifies capital projects for Federal investment, project applicants, and proposed Federal funding levels under this section;
Rest of § 24911 unchanged ·