Title 33 · Navigation and Navigable Waters
Changes to 33 U.S.C. § 1342
H.R. 4879 · Emergency Rural Water Response Act of 2025 · Introduced The text as a member of Congress first filed it. Most bills never get further than this.
In committee · step 2 of 5
33 U.S.C. § 1342 National pollutant discharge elimination system
1 change the bill asks for here, 1 carried out
- Carried out:
Section 402(l) of the Federal Water Pollution Control Act (33 U.S.C. 1342(l)) is amended by adding at the end the following:
(4) Emergency use of portable water treatment and filtration facilities.— During any 6-month period immediately following a declaration by a State of a disaster or state of emergency, no permit shall be required under this section by the Administrator (or the State, in the case …
§ 1342(l)–(n)
Start of § 1342 to (l)(3)(A) unchanged ·
(B) Other requirements.— Nothing in this paragraph exempts a discharge from silvicultural activity from any permitting requirement under section 1344 of this title, existing permitting requirements under section 1342 of this title, or from any other federal law.
(C) The authorization provided in Section1 1365(a) of this title does not apply to any non-permitting program established under 1342(p)(6)2 of this title for the silviculture activities listed in 1342(l)(3)(A)2 of this title, or to any other limitations that might be deemed to apply to the silviculture activities listed in 1342(l)(3)(A)2 of this title.
(4) [inserted: Emergency use of portable water treatment and filtration facilities.—] [inserted: During any 6-month period immediately following a declaration by a State of a disaster or state of emergency, no permit shall be required under this section by the Administrator (or the State, in the case of a permit program approved under subsection (b)) for discharges from a portable water treatment and filtration facility installed in the area covered by the declaration to provide clean water as needed to respond to conditions caused by the event that resulted in the declaration.]
(m) Additional pretreatment of conventional pollutants not required To the extent a treatment works (as defined in section 1292 of this title) which is publicly owned is not meeting the requirements of a permit issued under this section for such treatment works as a result of inadequate design or operation of such treatment works, the Administrator, in issuing a permit under this section, shall not require pretreatment by a person introducing conventional pollutants identified pursuant to section 1314(a)(4) of this title into such treatment works other than pretreatment required to assure compliance with pretreatment standards under subsection (b)(8) of this section and section 1317(b)(1) of this title. Nothing in this subsection shall affect the Administrator’s authority under sections 1317 and 1319 of this title, affect State and local authority under sections 1317(b)(4) and 1370 of this title, relieve such treatment works of its obligations to meet requirements established under this chapter, or otherwise preclude such works from pursuing whatever feasible options are available to meet its responsibility to comply with its permit under this section.
(n) Partial permit program
Rest of § 1342 unchanged ·