23 U.S.C. § 134 Metropolitan transportation planning
1 change the bill asks for here, 1 carried out
- Carried out:
Section 134(h) of title 23, United States Code, is amended by adding at the end the following:
(4) More options before more lanes.— Before carrying out a project to construct new capacity, or maintain existing capacity through reconstruction, for single-occupancy passenger vehicles, a metropolitan planning organization shall submit to the Secretary, and make publicly …
§ 134(h)–(i)
Start of § 134 to (h)(2)(C) unchanged
| Where | Mark | The Code now | Mark | As the bill would leave it |
|---|---|---|---|---|
| (h)(2)(D) | (D) Integration of other performance-based plans.— | (D) Integration of other performance-based plans.— | ||
| A metropolitan planning organization shall integrate in the metropolitan transportation planning process, directly or by reference, the goals, objectives, performance measures, and targets described in other State transportation plans and transportation processes, as well as any plans developed under chapter 53 of title 49 by providers of public transportation, required as part of a performance-based program. | A metropolitan planning organization shall integrate in the metropolitan transportation planning process, directly or by reference, the goals, objectives, performance measures, and targets described in other State transportation plans and transportation processes, as well as any plans developed under chapter 53 of title 49 by providers of public transportation, required as part of a performance-based program. | |||
| (h)(3) | (3) Failure to consider factors.— | (3) Failure to consider factors.— | ||
| The failure to consider any factor specified in paragraphs (1) and (2) shall not be reviewable by any court under this title or chapter 53 of title 49, subchapter II of chapter 5 of title 5, or chapter 7 of title 5 in any matter affecting a transportation plan, a TIP, a project or strategy, or the certification of a planning process. | The failure to consider any factor specified in paragraphs (1) and (2) shall not be reviewable by any court under this title or chapter 53 of title 49, subchapter II of chapter 5 of title 5, or chapter 7 of title 5 in any matter affecting a transportation plan, a TIP, a project or strategy, or the certification of a planning process. | |||
| (h)(4) | (4) [inserted: More options before more lanes.—] | |||
| [inserted: Before carrying out a project to construct new capacity, or maintain existing capacity through reconstruction, for single-occupancy passenger vehicles, a metropolitan planning organization shall submit to the Secretary, and make publicly available, documents that demonstrate that the metropolitan planning organization has completed all projects to implement transit priority measures requested by transit providers under section 5323(w). Not later than 15 days after the submission of such documents, the Secretary shall provide for a 180-day of public comment period on the veracity of the information provided in such submission. The Secretary shall approve or reject the submission not later than 365 days after such submission.] | ||||
| (i) | (i) Development of Transportation Plan.— | (i) Development of Transportation Plan.— | ||
| (i)(1) | (1) Requirements.— | (1) Requirements.— | ||
| (i)(1)(A) | (A) In general.— | (A) In general.— | ||
| Each metropolitan planning organization shall prepare and update a transportation plan for its metropolitan planning area in accordance with the requirements of this subsection. | Each metropolitan planning organization shall prepare and update a transportation plan for its metropolitan planning area in accordance with the requirements of this subsection. | |||
Rest of § 134 unchanged
23 U.S.C. § 135 Statewide and nonmetropolitan transportation planning
1 change the bill asks for here, 1 carried out
- Carried out:
Section 135(d) of title 23, United States Code, is amended by adding at the end the following:
(4) More options before more lanes.— Before carrying out a project to construct new capacity, or maintain existing capacity through reconstruction, for single-occupancy passenger vehicles, a State shall submit to the Secretary, and make publicly available, documents that …
§ 135(d)–(e)
Start of § 135 to (d)(2)(C) unchanged
| Where | Mark | The Code now | Mark | As the bill would leave it |
|---|---|---|---|---|
| (d)(2)(D) | (D) Use of performance measures and targets.— | (D) Use of performance measures and targets.— | ||
| The performance measures and targets established under this paragraph shall be considered by a State when developing policies, programs, and investment priorities reflected in the statewide transportation plan and statewide transportation improvement program. | The performance measures and targets established under this paragraph shall be considered by a State when developing policies, programs, and investment priorities reflected in the statewide transportation plan and statewide transportation improvement program. | |||
| (d)(3) | (3) Failure to consider factors.— | (3) Failure to consider factors.— | ||
| The failure to take into consideration the factors specified in paragraphs (1) and (2) shall not be subject to review by any court under this title, chapter 53 of title 49, subchapter II of chapter 5 of title 5, or chapter 7 of title 5 in any matter affecting a statewide transportation plan, a statewide transportation improvement program, a project or strategy, or the certification of a planning process. | The failure to take into consideration the factors specified in paragraphs (1) and (2) shall not be subject to review by any court under this title, chapter 53 of title 49, subchapter II of chapter 5 of title 5, or chapter 7 of title 5 in any matter affecting a statewide transportation plan, a statewide transportation improvement program, a project or strategy, or the certification of a planning process. | |||
| (d)(4) | (4) [inserted: More options before more lanes.—] | |||
| [inserted: Before carrying out a project to construct new capacity, or maintain existing capacity through reconstruction, for single-occupancy passenger vehicles, a State shall submit to the Secretary, and make publicly available, documents that demonstrate that the State has completed all projects to implement transit priority measures requested by transit providers under section 5323(w). Not later than 15 days after the submission of such documents, the Secretary shall provide for a 180-day of public comment period on the veracity of the information provided in such submission. The Secretary shall approve or reject the submission not later than 365 days after such submission.] | ||||
| (e) | (e) Additional Requirements.— | (e) Additional Requirements.— | ||
| In carrying out planning under this section, each State shall, at a minimum— | In carrying out planning under this section, each State shall, at a minimum— | |||
| (e)(1) | (1) | (1) | ||
| with respect to nonmetropolitan areas, cooperate with affected local officials with responsibility for transportation or, if applicable, through regional transportation planning organizations described in subsection (m); | with respect to nonmetropolitan areas, cooperate with affected local officials with responsibility for transportation or, if applicable, through regional transportation planning organizations described in subsection (m); | |||
Rest of § 135 unchanged
49 U.S.C. § 5303 Metropolitan transportation planning
5 changes the bill asks for here, 5 carried out
- Carried out:
in subsection (i)(2), by adding at the end the following:
(I) Transit priority measures.— An identification of the locations in which a transit provider may request the implementation of transit priority measures under section 5323(w).; and
- Carried out:
in clause (ii), by striking
and
at the end; - Carried out:
in clause (iii), by striking the period at the end and inserting
; and
; and - Carried out:
by adding at the end the following:
(iv) includes any projects for transit priority measures, as defined in section 5323(w), on public rights-of-way within the jurisdiction of the metropolitan planning area that are requested by transit providers;; and
- Carried out:
in paragraph (3), by adding at the end the following:
(E) Transit priority measures.— The program shall include any projects requested by transit providers for transit priority measures, as defined in section 5323(w), on public rights-of-way within the jurisdiction of the metropolitan planning area that are requested by transit providers..
§ 5303(i)Development of Transportation Plan.—(2)–(4)
Start of § 5303 to (i)(2)(F) unchanged
| Where | Mark | The Code now | Mark | As the bill would leave it |
|---|---|---|---|---|
| (2)(G) | (G) Capital investment and other strategies.— | (G) Capital investment and other strategies.— | ||
| Capital investment and other strategies to preserve the existing and projected future metropolitan transportation infrastructure, provide for multimodal capacity increases based on regional priorities and needs, and reduce the vulnerability of the existing transportation infrastructure to natural disasters. | Capital investment and other strategies to preserve the existing and projected future metropolitan transportation infrastructure, provide for multimodal capacity increases based on regional priorities and needs, and reduce the vulnerability of the existing transportation infrastructure to natural disasters. | |||
| (2)(H) | (H) Transportation and transit enhancement activities.— | (H) Transportation and transit enhancement activities.— | ||
| Proposed transportation and transit enhancement activities, including consideration of the role that intercity buses may play in reducing congestion, pollution, and energy consumption in a cost-effective manner and strategies and investments that preserve and enhance intercity bus systems, including systems that are privately owned and operated. | Proposed transportation and transit enhancement activities, including consideration of the role that intercity buses may play in reducing congestion, pollution, and energy consumption in a cost-effective manner and strategies and investments that preserve and enhance intercity bus systems, including systems that are privately owned and operated. | |||
| (2)(I) | (I) [inserted: Transit priority measures.—] | |||
| [inserted: An identification of the locations in which a transit provider may request the implementation of transit priority measures under section 5323(w).] | ||||
| (3) | (3) Coordination with clean air act agencies.— | (3) Coordination with clean air act agencies.— | ||
| In metropolitan areas that are in nonattainment for ozone or carbon monoxide under the Clean Air Act (42 U.S.C. 7401 et seq.), the metropolitan planning organization shall coordinate the development of a transportation plan with the process for development of the transportation control measures of the State implementation plan required by that Act. | In metropolitan areas that are in nonattainment for ozone or carbon monoxide under the Clean Air Act (42 U.S.C. 7401 et seq.), the metropolitan planning organization shall coordinate the development of a transportation plan with the process for development of the transportation control measures of the State implementation plan required by that Act. | |||
| (4) | (4) Optional scenario development.— | (4) Optional scenario development.— | ||
§ 5303(j)(1)Development.—(A)–(C)
(i)(4)(A)–(j)(1)(A) unchanged
| Where | Mark | The Code now | Mark | As the bill would leave it |
|---|---|---|---|---|
| (A)(i) | (i) | (i) | ||
| contains projects consistent with the current metropolitan transportation plan; | contains projects consistent with the current metropolitan transportation plan; | |||
| (A)(ii) | (ii) | (ii) | ||
| reflects the investment priorities established in the current metropolitan transportation plan; | reflects the investment priorities established in the current metropolitan transportation plan; | |||
| (A)(iii) | (iii) | (iii) | ||
| once implemented, is designed to make progress toward achieving the performance targets established under subsection (h)(2) | once implemented, is designed to make progress toward achieving the performance targets established under subsection (h)(2)[inserted: ; and] | |||
| (A)(iv) | (iv) [inserted: ] | |||
| [inserted: includes any projects for transit priority measures, as defined in section 5323(w), on public rights-of-way within the jurisdiction of the metropolitan planning area that are requested by transit providers;] | ||||
| (B) | (B) Opportunity for comment.— | (B) Opportunity for comment.— | ||
| In developing the TIP, the metropolitan planning organization, in cooperation with the State and any affected public transportation operator, shall provide an opportunity for participation by interested parties in the development of the program, in accordance with subsection (i)(5). | In developing the TIP, the metropolitan planning organization, in cooperation with the State and any affected public transportation operator, shall provide an opportunity for participation by interested parties in the development of the program, in accordance with subsection (i)(5). | |||
| (C) | (C) Funding estimates.— | (C) Funding estimates.— | ||
| For the purpose of developing the TIP, the metropolitan planning organization, public transportation agency, and State shall cooperatively develop estimates of funds that are reasonably expected to be available to support program implementation. | For the purpose of developing the TIP, the metropolitan planning organization, public transportation agency, and State shall cooperatively develop estimates of funds that are reasonably expected to be available to support program implementation. | |||
§ 5303(j)Metropolitan TIP.—(3)–(5)
(j)(1)(D)–(3)(B) unchanged
| Where | Mark | The Code now | Mark | As the bill would leave it |
|---|---|---|---|---|
| (3)(C) | (C) Consistency with long-range transportation plan.— | (C) Consistency with long-range transportation plan.— | ||
| Each project shall be consistent with the long-range transportation plan developed under subsection (i) for the area. | Each project shall be consistent with the long-range transportation plan developed under subsection (i) for the area. | |||
| (3)(D) | (D) Requirement of anticipated full funding.— | (D) Requirement of anticipated full funding.— | ||
| The program shall include a project, or an identified phase of a project, only if full funding can reasonably be anticipated to be available for the project or the identified phase within the time period contemplated for completion of the project or the identified phase. | The program shall include a project, or an identified phase of a project, only if full funding can reasonably be anticipated to be available for the project or the identified phase within the time period contemplated for completion of the project or the identified phase. | |||
| (3)(E) | (E) [inserted: Transit priority measures.—] | |||
| [inserted: The program shall include any projects requested by transit providers for transit priority measures, as defined in section 5323(w), on public rights-of-way within the jurisdiction of the metropolitan planning area that are requested by transit providers.] | ||||
| (4) | (4) Notice and comment.— | (4) Notice and comment.— | ||
| Before approving a TIP, a metropolitan planning organization, in cooperation with the State and any affected public transportation operator, shall provide an opportunity for participation by interested parties in the development of the program, in accordance with subsection (i)(5). | Before approving a TIP, a metropolitan planning organization, in cooperation with the State and any affected public transportation operator, shall provide an opportunity for participation by interested parties in the development of the program, in accordance with subsection (i)(5). | |||
| (5) | (5) Selection of projects.— | (5) Selection of projects.— | ||
Rest of § 5303 unchanged
49 U.S.C. § 5304 Statewide and nonmetropolitan transportation planning
2 changes the bill asks for here, 2 carried out
- Carried out:
in subsection (f), by adding at the end the following:
(10) Transit priority measures.— The statewide transportation plan shall identify all areas on public right-of-way in which a transit provider may request the implementation of transit priority measures under section 5323(w).; and
- Carried out:
in subsection (g)(5), by adding at the end the following:
(I) Transit priority measures.— A statewide transportation improvement program shall include any projects requested by transit providers for transit priority measures, as defined in section 5323(w), on public rights-of-way..
§ 5304(f)–(g)
Start of § 5304 to (f)(7)(B) unchanged
| Where | Mark | The Code now | Mark | As the bill would leave it |
|---|---|---|---|---|
| (f)(8) | (8) Existing system.— | (8) Existing system.— | ||
| The statewide transportation plan should include capital, operations and management strategies, investments, procedures, and other measures to ensure the preservation and most efficient use of the existing transportation system. | The statewide transportation plan should include capital, operations and management strategies, investments, procedures, and other measures to ensure the preservation and most efficient use of the existing transportation system. | |||
| (f)(9) | (9) Publication of long-range transportation plans.— | (9) Publication of long-range transportation plans.— | ||
| Each long-range transportation plan prepared by a State shall be published or otherwise made available, including (to the maximum extent practicable) in electronically accessible formats and means, such as the World Wide Web. | Each long-range transportation plan prepared by a State shall be published or otherwise made available, including (to the maximum extent practicable) in electronically accessible formats and means, such as the World Wide Web. | |||
| (f)(10) | (10) [inserted: Transit priority measures.—] | |||
| [inserted: The statewide transportation plan shall identify all areas on public right-of-way in which a transit provider may request the implementation of transit priority measures under section 5323(w).] | ||||
| (g) | (g) Statewide Transportation Improvement Program.— | (g) Statewide Transportation Improvement Program.— | ||
| (g)(1) | (1) Development.— | (1) Development.— | ||
| (g)(1)(A) | (A) In general.— | (A) In general.— | ||
| Each State shall develop a statewide transportation improvement program for all areas of the State. | Each State shall develop a statewide transportation improvement program for all areas of the State. | |||
§ 5304(g)Statewide Transportation Improvement Program.—(5)–(6)
(g)(1)(B)–(5)(G) unchanged
| Where | Mark | The Code now | Mark | As the bill would leave it |
|---|---|---|---|---|
| (5)(G)(ii) | (ii) Required action by the secretary.— | (ii) Required action by the secretary.— | ||
| Action by the Secretary shall be required for a State to select any project from the illustrative list of additional projects included in the financial plan under subparagraph (F) for inclusion in an approved transportation improvement program. | Action by the Secretary shall be required for a State to select any project from the illustrative list of additional projects included in the financial plan under subparagraph (F) for inclusion in an approved transportation improvement program. | |||
| (5)(H) | (H) Priorities.— | (H) Priorities.— | ||
| The transportation improvement program shall reflect the priorities for programming and expenditures of funds, including transportation enhancement activities, required by this chapter and title 23. | The transportation improvement program shall reflect the priorities for programming and expenditures of funds, including transportation enhancement activities, required by this chapter and title 23. | |||
| (5)(I) | (I) [inserted: Transit priority measures.—] | |||
| [inserted: A statewide transportation improvement program shall include any projects requested by transit providers for transit priority measures, as defined in section 5323(w), on public rights-of-way.] | ||||
| (6) | (6) Project selection for areas of less than 50,000 population.— | (6) Project selection for areas of less than 50,000 population.— | ||
| (6)(A) | (A) In general.— | (A) In general.— | ||
| Projects carried out in areas with populations of less than 50,000 individuals shall be selected, from the approved transportation improvement program (excluding projects carried out on the National Highway System and projects carried out under the bridge program or the Interstate maintenance program under title 23 or under sections 5310 and 5311 of this chapter), by the State in cooperation with the affected nonmetropolitan local officials with responsibility for transportation or, if applicable, through regional transportation planning organizations described in subsection (l). | Projects carried out in areas with populations of less than 50,000 individuals shall be selected, from the approved transportation improvement program (excluding projects carried out on the National Highway System and projects carried out under the bridge program or the Interstate maintenance program under title 23 or under sections 5310 and 5311 of this chapter), by the State in cooperation with the affected nonmetropolitan local officials with responsibility for transportation or, if applicable, through regional transportation planning organizations described in subsection (l). | |||
Rest of § 5304 unchanged
49 U.S.C. § 5307 Urbanized area formula grants
4 changes the bill asks for here, 4 carried out
- Carried out:
in subparagraph (K), by striking
and
at the end; and - Carried out:
by adding at the end the following:
(M) plans to complete a bus network redesign by fiscal year 2045 and, beginning in fiscal year 2045 and each fiscal year thereafter, has completed a bus network redesign in the preceding 20-year period; and; and
- Carried out:
by redesignating paragraphs (6) and (7) as paragraphs (7) and (8), respectively; and
- Carried out:
by inserting after paragraph (5) the following:
(6) ensure that the final program of projects uses the authority granted to transit agencies under section 5323(w) to improve the ridership experience for the maximum feasible number of transit riders;.
§ 5307(b)–(c)
Start of § 5307 to (b)(3) unchanged
| Where | Mark | The Code now | Mark | As the bill would leave it |
|---|---|---|---|---|
| (b)(4) | (4) | (4) | ||
| provide an opportunity for a public hearing in which to obtain the views of individuals on the proposed program of projects; | provide an opportunity for a public hearing in which to obtain the views of individuals on the proposed program of projects; | |||
| (b)(5) | (5) | (5) | ||
| ensure that the proposed program of projects provides for the coordination of public transportation services assisted under section 5336 of this title with transportation services assisted from other United States Government sources; | ensure that the proposed program of projects provides for the coordination of public transportation services assisted under section 5336 of this title with transportation services assisted from other United States Government sources; | |||
| (b)(6) | (6) [inserted: ] | |||
| [inserted: ensure that the final program of projects uses the authority granted to transit agencies under section 5323(w) to improve the ridership experience for the maximum feasible number of transit riders;] | ||||
| (b)(7) | [inserted: (7)] | |||
| consider comments and views received, especially those of private transportation providers, in preparing the final program of projects; and | consider comments and views received, especially those of private transportation providers, in preparing the final program of projects; and | |||
| (b)(8) | [inserted: (8)] | |||
| make the final program of projects available to the public. | make the final program of projects available to the public. | |||
| (c) | (c) Grant Recipient Requirements.— | (c) Grant Recipient Requirements.— | ||
| A recipient may receive a grant in a fiscal year only if— | A recipient may receive a grant in a fiscal year only if— | |||
| (c)(1) | (1) | (1) | ||
| the recipient, within the time the Secretary prescribes, submits a final program of projects prepared under subsection (b) of this section and a certification for that fiscal year that the recipient (including a person receiving amounts from a Governor under this section)— | the recipient, within the time the Secretary prescribes, submits a final program of projects prepared under subsection (b) of this section and a certification for that fiscal year that the recipient (including a person receiving amounts from a Governor under this section)— | |||
§ 5307(c)–(d)
(c)(1)(A)–(J) unchanged
| Where | Mark | The Code now | Mark | As the bill would leave it |
|---|---|---|---|---|
| (c)(1)(J)(ii) | (ii) | (ii) | ||
| has decided that the expenditure for security projects is not necessary; | has decided that the expenditure for security projects is not necessary; | |||
| (c)(1)(K) | (K) | (K) | ||
| in the case of a recipient for an urbanized area with a population of not fewer than 200,000 individuals, as determined by the Bureau of the Census, will submit an annual report listing projects carried out in the preceding fiscal year under this section for associated transit improvements as defined in section 5302; | in the case of a recipient for an urbanized area with a population of not fewer than 200,000 individuals, as determined by the Bureau of the Census, will submit an annual report listing projects carried out in the preceding fiscal year under this section for associated transit improvements as defined in section 5302; | |||
| (c)(1)(L) | (L) | (L) | ||
| will comply with section 5329(d); and | will comply with section 5329(d); and | |||
| (c)(1)(M) | (M) [inserted: ] | |||
| [inserted: plans to complete a bus network redesign by fiscal year 2045 and, beginning in fiscal year 2045 and each fiscal year thereafter, has completed a bus network redesign in the preceding 20-year period; and] | ||||
| (c)(2) | (2) | (2) | ||
| the Secretary accepts the certification. | the Secretary accepts the certification. | |||
| (d) | (d) Government Share of Costs.— | (d) Government Share of Costs.— | ||
Rest of § 5307 unchanged
49 U.S.C. § 5323 General provisions
1 change the bill asks for here, 1 carried out
- Carried out:
Section 5323 of title 49, United States Code, is amended by adding at the end the following:
(w) Prioritizing transit vehicles.— (1) In general.— The owners of public rights-of-way shall cooperate to the maximum extent feasible with transit providers to ensure that transit vehicles that run at grade are able to complete routes in as reliable and frequent a manner as …
§ 5323(v)–(w)
Start of § 5323 to (v)(3) unchanged
| Where | Mark | The Code now | Mark | As the bill would leave it |
|---|---|---|---|---|
| (v)(3)(A) | (A) | (A) | ||
| the Secretary of Homeland Security to publish or ensure compliance with requirements or standards concerning cybersecurity for rail fixed guideway public transportation systems; or | the Secretary of Homeland Security to publish or ensure compliance with requirements or standards concerning cybersecurity for rail fixed guideway public transportation systems; or | |||
| (v)(3)(B) | (B) | (B) | ||
| the Secretary of Transportation under section 5329 to address cybersecurity issues as those issues relate to the safety of rail fixed guideway public transportation systems. | the Secretary of Transportation under section 5329 to address cybersecurity issues as those issues relate to the safety of rail fixed guideway public transportation systems. | |||
| (w) | (w) [inserted: Prioritizing transit vehicles.—] | |||
| (w)(1) | (1) [inserted: In general.—] | |||
| [inserted: The owners of public rights-of-way shall cooperate to the maximum extent feasible with transit providers to ensure that transit vehicles that run at grade are able to complete routes in as reliable and frequent a manner as possible.] | ||||
| (w)(2) | (2) [inserted: By-right transit priority measures.—] | |||
| [inserted: A transit provider may request that the owner of a public right-of-way implement transit priority measures on suitable corridors and the owner of said public right-of-way shall carry out specified collaboration with the transit provider to complete such request to the satisfaction of the transit provider.] | ||||
| (w)(3) | (3) [inserted: Consultation of Federal Transit Administration.—] | |||
| [inserted: If a transit provider determines that a request for transit priority measures has not been adequately incorporated into a project on a suitable corridor or the owner of a public right-of-way believes that a transit provider is making unreasonable requests, the transit provider or the public right-of-way owner may request that the regional office of the Federal Transit Administration make a determination on the matter. Such regional office shall defer to the transit provider unless the owner of the public right-of-way can provide evidence—] | ||||
| (w)(3)(A) | (A) [inserted: ] | |||
| [inserted: that allocating funding to implement requested transit priority measures would threaten the state of good repair of the overall public transportation system, even if funds from all projects to construct new capacity, or maintain existing capacity through reconstruction, for single-occupancy passenger vehicles were reallocated to either—] | ||||
| (w)(3)(A)(i) | (i) [inserted: ] | |||
| [inserted: implementing requested transit priority measures; or] | ||||
| (w)(3)(A)(ii) | (ii) [inserted: ] | |||
| [inserted: maintaining the state of good repair of the overall transportation system; or] | ||||
| (w)(3)(B) | (B) [inserted: ] | |||
| [inserted: that—] | ||||
| (w)(3)(B)(i) | (i) [inserted: ] | |||
| [inserted: the benefits a transit provider expects to see from the implementation of requested transit priority measures are factually incorrect as based on—] | ||||
| (w)(3)(B)(i)(I) | (I) [inserted: ] | |||
| [inserted: transportation demand modeling; and] | ||||
| (w)(3)(B)(i)(II) | (II) [inserted: ] | |||
| [inserted: real-world examples of similar projects in the United States and other countries; and] | ||||
| (w)(3)(B)(ii) | (ii) [inserted: ] | |||
| [inserted: the corridor where transit priority measures have been requested is not actually a suitable corridor.] | ||||
| (w)(4) | (4) [inserted: Prevention of compliance-avoiding service alterations.—] | |||
| [inserted: A transit provider may not alter the frequency of service on fixed-route transit service with the purpose of ensuring a public right-of-way does not meet the requirements of a suitable corridor.] | ||||
| (w)(5) | (5) [inserted: Penalties for non-compliance.—] | |||
| [inserted: If a regional office of the Federal Transit Administration finds by a preponderance of the evidence that a public right-of-way owner is not complying with paragraph (2) or a transit provider is in violation of paragraph (4), the Secretary shall not award any discretionary grants to that public right-of-way owner for the following year.] | ||||
| (w)(6) | (6) [inserted: In-kind match.—] | |||
| [inserted: Of the non-Federal share required for any projects that complete transit priority measures requested through this subsection, 25 percent may be derived from amounts expended for associated capital improvements related to a project or program that implements transit priority measures.] | ||||
| (w)(7) | (7) [inserted: Definitions.—] | |||
| [inserted: In this subsection:] | ||||
| (w)(7)(A) | (A) [inserted: Specified collaboration.—] | |||
| [inserted: The term “specified collaboration” means—] | ||||
| (w)(7)(A)(i) | (i) [inserted: ] | |||
| [inserted: the owner of a public right-of-way about which a transit provider has made a formal request shall—] | ||||
| (w)(7)(A)(i)(I) | (I) [inserted: ] | |||
| [inserted: respond not later than 180 days after the date on which such owner submits such request with—] | ||||
| (w)(7)(A)(i)(I)(aa) | (aa) [inserted: ] | |||
| [inserted: the expected cost of implementing the requested transit priority measures;] | ||||
| (w)(7)(A)(i)(I)(bb) | (bb) [inserted: ] | |||
| [inserted: an identification of any funding sources such owner expects to use to construct the requested transit priority measures; and] | ||||
| (w)(7)(A)(i)(I)(cc) | (cc) [inserted: ] | |||
| [inserted: any timelines for completion of the construction of such measure, depending on any variations in circumstances, taking into consideration—] | ||||
| (w)(7)(A)(i)(I)(cc)(AA) | (AA) [inserted: ] | |||
| [inserted: how existing funds from chapter 53 of title 49 and chapter 1 of title 23 are spent; and] | ||||
| (w)(7)(A)(i)(I)(cc)(BB) | (BB) [inserted: ] | |||
| [inserted: how long it may take to access additional needed funding; and] | ||||
| (w)(7)(A)(i)(II) | (II) [inserted: ] | |||
| [inserted: work with transit providers to create the maximum feasible impact of implementing transit priority measures in the most expeditious manner possible by—] | ||||
| (w)(7)(A)(i)(II)(aa) | (aa) [inserted: ] | |||
| [inserted: adding transit priority measures to all projects scheduled to begin construction not later than 365 days of the date of enactment of this subsection, including—] | ||||
| (w)(7)(A)(i)(II)(aa)(AA) | (AA) [inserted: ] | |||
| [inserted: all new construction and reconstruction or retrofit projects; and] | ||||
| (w)(7)(A)(i)(II)(aa)(BB) | (BB) [inserted: ] | |||
| [inserted: all maintenance projects and ongoing operations, such as resurfacing, repaving, restriping, or rehabilitation; and] | ||||
| (w)(7)(A)(i)(II)(bb) | (bb) [inserted: ] | |||
| [inserted: proposing amendments to the applicable transportation improvement program and statewide transportation improvement program to—] | ||||
| (w)(7)(A)(i)(II)(bb)(AA) | (AA) [inserted: ] | |||
| [inserted: ensure projects on rights-of-way identified as suitable corridors in formal requests include transit priority measures requested by transit providers; and] | ||||
| (w)(7)(A)(i)(II)(bb)(BB) | (BB) [inserted: ] | |||
| [inserted: prioritize implementing projects identified in formal requests by transit providers; and] | ||||
| (w)(7)(A)(ii) | (ii) [inserted: ] | |||
| [inserted: not later than 120 days before carrying out a project on a suitable corridor for which the owner of a public right-of-way is required to produce a plan under section 5303 or 5304, such owner shall alert any transit provider operating on that corridor or operating in the same jurisdiction as that corridor and work cooperatively with the transit provider to incorporate any transit priority measures requested by the transit provider into the project.] | ||||
| (w)(7)(B) | (B) [inserted: Formal request.—] | |||
| [inserted: The term “formal request” means a request submitted to the owner of the public right-of-way that a suitable corridor is on, with copies sent to the applicable regional offices of the Federal Transit Administration and Federal Highway Administration, indicating—] | ||||
| (w)(7)(B)(i) | (i) [inserted: ] | |||
| [inserted: the location at which the transit provider would like the right-of-way owner to implement transit priority measures;] | ||||
| (w)(7)(B)(ii) | (ii) [inserted: ] | |||
| [inserted: which transit priority measures such provider would like the right-of-way owner to implement;] | ||||
| (w)(7)(B)(iii) | (iii) [inserted: ] | |||
| [inserted: whether or not the requested transit priority measures—] | ||||
| (w)(7)(B)(iii)(I) | (I) [inserted: ] | |||
| [inserted: would be immediately implementable through projects that would qualify for funding under section 5309; or] | ||||
| (w)(7)(B)(iii)(II) | (II) [inserted: ] | |||
| [inserted: would set up the suitable corridor for the implementation of additional transit priority measures that would qualify for funding under section 5309;] | ||||
| (w)(7)(B)(iv) | (iv) [inserted: ] | |||
| [inserted: the order of priority for the implementation of requested transit priority measures;] | ||||
| (w)(7)(B)(v) | (v) [inserted: ] | |||
| [inserted: an explanation of how the transit priority measures align with the program of projects required by sections—] | ||||
| (w)(7)(B)(v)(I) | (I) [inserted: ] | |||
| [inserted: 5307(b);] | ||||
| (w)(7)(B)(v)(II) | (II) [inserted: ] | |||
| [inserted: 5310(b)(6); and] | ||||
| (w)(7)(B)(v)(III) | (III) [inserted: ] | |||
| [inserted: 5311(2);] | ||||
| (w)(7)(B)(vi) | (vi) [inserted: ] | |||
| [inserted: the benefits for transit riders that they expect to see from the implementation of the transit priority measures; and] | ||||
| (w)(7)(B)(vii) | (vii) [inserted: ] | |||
| [inserted: the conditions that make the identified right-of-way a suitable corridor for transit priority measures.] | ||||
| (w)(7)(C) | (C) [inserted: Suitable corridors.—] | |||
| [inserted: The term “suitable corridors” means—] | ||||
| (w)(7)(C)(i) | (i) [inserted: ] | |||
| [inserted: the right-of-way and quarter-mile on either end of a right-of-way where—] | ||||
| (w)(7)(C)(i)(I) | (I) [inserted: ] | |||
| [inserted: at least six buses are scheduled to run each hour; or] | ||||
| (w)(7)(C)(i)(II) | (II) [inserted: ] | |||
| [inserted: there are at least 2 lanes in each direction for all-purpose vehicle travel; or] | ||||
| (w)(7)(C)(ii) | (ii) [inserted: ] | |||
| [inserted: any right-of-way where light rail vehicles are scheduled to run at a frequency of at least 6 vehicles per hour.] | ||||
| (w)(7)(D) | (D) [inserted: Transit-friendly intersections projects.—] | |||
| [inserted: The term “transit-friendly intersections projects” means projects that include—] | ||||
| (w)(7)(D)(i) | (i) [inserted: ] | |||
| [inserted: converting a stop-sign to a traffic signal;] | ||||
| (w)(7)(D)(ii) | (ii) [inserted: ] | |||
| [inserted: adding a turn arrow signal, which may or may not be bus-activated; and] | ||||
| (w)(7)(D)(iii) | (iii) [inserted: ] | |||
| [inserted: traffic signal priority.] | ||||
| (w)(7)(E) | (E) [inserted: Transit-friendly streets projects.—] | |||
| [inserted: The term “transit-friendly streets projects” means projects that include—] | ||||
| (w)(7)(E)(i) | (i) [inserted: ] | |||
| [inserted: the addition, improvement, or widening of sidewalks;] | ||||
| (w)(7)(E)(ii) | (ii) [inserted: ] | |||
| [inserted: the conversion of on-street parking spaces to designated loading zones;] | ||||
| (w)(7)(E)(iii) | (iii) [inserted: ] | |||
| [inserted: the consolidation or removal of underutilized or duplicative driveways;] | ||||
| (w)(7)(E)(iv) | (iv) [inserted: ] | |||
| [inserted: the installation of transit-only lanes that have restricted access for nonemergency vehicles, including—] | ||||
| (w)(7)(E)(iv)(I) | (I) [inserted: ] | |||
| [inserted: curbside transit-only lanes;] | ||||
| (w)(7)(E)(iv)(II) | (II) [inserted: ] | |||
| [inserted: median transit-only lanes with either left- or right-side door boarding;] | ||||
| (w)(7)(E)(iv)(III) | (III) [inserted: ] | |||
| [inserted: offset transit-only lanes that are paired with either transit stop bump outs or boarding islands to ensure that parked vehicles do not prevent transit riders from onboarding or offboarding a transit vehicle; and] | ||||
| (w)(7)(E)(iv)(IV) | (IV) [inserted: ] | |||
| [inserted: dedicated transit-only lanes on limited-access highways;] | ||||
| (w)(7)(E)(v) | (v) [inserted: ] | |||
| [inserted: the introduction of turn restrictions to prevent through-traffic by nontransit vehicles; and] | ||||
| (w)(7)(E)(vi) | (vi) [inserted: ] | |||
| [inserted: the conversion of a right-of-way to a transit mall, wherein transit vehicles are the only vehicles allowed, with limited exceptions for timed deliveries.] | ||||
| (w)(7)(F) | (F) [inserted: Transit-friendly transit stop projects.—] | |||
| [inserted: The term “transit-friendly transit stop projects” means projects that include—] | ||||
| (w)(7)(F)(i) | (i) [inserted: ] | |||
| [inserted: the installation of lighting, seating, shelter, signage that tracks arrival time of buses, and additional wayfinding;] | ||||
| (w)(7)(F)(ii) | (ii) [inserted: ] | |||
| [inserted: raising the height of the sidewalk and curb at a bus stop to make boarding easier;] | ||||
| (w)(7)(F)(iii) | (iii) [inserted: ] | |||
| [inserted: the construction of transit stop bump-outs or boarding islands; and] | ||||
| (w)(7)(F)(iv) | (iv) [inserted: ] | |||
| [inserted: the installation of bicycling parking, either protected or unprotected, around bus stops that are served by routes with at least four buses per hour.] | ||||
| (w)(7)(G) | (G) [inserted: Transit priority measures.—] | |||
| [inserted: The term “transit priority measures” means changes to the design of a public right-of-way that reallocate space away from all-purpose vehicle traffic and towards transit vehicles through transit-friendly transit stop projects, transit-friendly streets projects, and transit-friendly intersections projects in order to improve the efficiency and reliability of transit service.] | ||||
| (w)(7)(H) | (H) [inserted: Transit vehicles.—] | |||
| [inserted: The term “transit vehicles” means transit buses, light rail trains, and, when operated on limited access highways, intercity buses.] | ||||
49 U.S.C. § 5337 State of good repair grants
1 change the bill asks for here, 1 carried out
- Carried out:
Section 5337 of title 49, United States Code, is amended by adding at the end the following:
(g) Bus stop shelter reimbursement program.— (1) In general.— The Secretary shall reimburse an eligible entity for installing bus stop shelters if such entity followed the formal process established under paragraph (3) for the installation of each such shelter. (2) Reimbursement …
§ 5337(f)–(h)
Start of § 5337 to (f)(7)(C)(i) unchanged
| Where | Mark | The Code now | Mark | As the bill would leave it |
|---|---|---|---|---|
| (f)(7)(C)(ii) | (ii) | (ii) | ||
| may include a commitment, contingent on amounts to be specified in law in advance for commitments under this paragraph, to obligate an additional amount from future available budget authority specified in law. | may include a commitment, contingent on amounts to be specified in law in advance for commitments under this paragraph, to obligate an additional amount from future available budget authority specified in law. | |||
| (f)(7)(D) | (D) Statement of contingent commitment.— | (D) Statement of contingent commitment.— | ||
| A multi-year agreement under this paragraph shall state that the contingent commitment is not an obligation of the Federal Government. | A multi-year agreement under this paragraph shall state that the contingent commitment is not an obligation of the Federal Government. | |||
| (g) | (g) [inserted: Bus stop shelter reimbursement program.—] | |||
| (g)(1) | (1) [inserted: In general.—] | |||
| [inserted: The Secretary shall reimburse an eligible entity for installing bus stop shelters if such entity followed the formal process established under paragraph (3) for the installation of each such shelter.] | ||||
| (g)(2) | (2) [inserted: Reimbursement amount.—] | |||
| [inserted: The Secretary shall annually determine the amount for which an eligible entity shall be reimbursed for each bus stop shelter that such entity verifies has been successfully installed, including any additional amounts necessary for bus stop shelters to meet different weather standards. The Secretary shall set such amount at a level that—] | ||||
| (g)(2)(A) | (A) [inserted: ] | |||
| [inserted: maintains purchasing power for the eligible entity relying on such amount;] | ||||
| (g)(2)(B) | (B) [inserted: ] | |||
| [inserted: ensures that such amount is sufficient to discourage inflation; and] | ||||
| (g)(2)(C) | (C) [inserted: ] | |||
| [inserted: incentivizes eligible entities to use products covered by a Federal purchasing schedule authorized under section 5 of the Faster Buses Better Futures Act.] | ||||
| (g)(3) | (3) [inserted: Establishment of formal process.—] | |||
| [inserted: The Secretary shall establish a formal process for the instillation of bus stop shelters to be reimbursable under this subsection that includes—] | ||||
| (g)(3)(A) | (A) [inserted: ] | |||
| [inserted: an annual notice of funding opportunity that requires an eligible entity seeking reimbursement to—] | ||||
| (g)(3)(A)(i) | (i) [inserted: ] | |||
| [inserted: submit to the Secretary a bus shelter plan;] | ||||
| (g)(3)(A)(ii) | (ii) [inserted: ] | |||
| [inserted: each year after the submission of a plan under clause (i), submit to the Secretary a report containing—] | ||||
| (g)(3)(A)(ii)(I) | (I) [inserted: ] | |||
| [inserted: the progress the eligible entity has made in implementing the bus shelter plan with both Federal and non-Federal funds; and] | ||||
| (g)(3)(A)(ii)(II) | (II) [inserted: ] | |||
| [inserted: the total cost of the bus stop shelters installed by such entity;] | ||||
| (g)(3)(A)(iii) | (iii) [inserted: ] | |||
| [inserted: indicate the quantity and location of proposed bus stop shelters;] | ||||
| (g)(3)(A)(iv) | (iv) [inserted: ] | |||
| [inserted: ensure that each proposed bus stop shelter meets weather standards; and] | ||||
| (g)(3)(A)(v) | (v) [inserted: ] | |||
| [inserted: indicate how the proposed bus stop shelter installations will be coordinated with any other capital projects taking place at bus stops with such proposed installations, including—] | ||||
| (g)(3)(A)(v)(I) | (I) [inserted: ] | |||
| [inserted: projects funded under section 5309;] | ||||
| (g)(3)(A)(v)(II) | (II) [inserted: ] | |||
| [inserted: transit priority measures authorized under section 5323(w); and] | ||||
| (g)(3)(A)(v)(III) | (III) [inserted: ] | |||
| [inserted: projects funded under subsection (h); and] | ||||
| (g)(3)(B) | (B) [inserted: ] | |||
| [inserted: a period between 270 and 365 days after the Notice of Funding Opportunity opens in which the eligible entity provides to the Secretary—] | ||||
| (g)(3)(B)(i) | (i) [inserted: ] | |||
| [inserted: the number and location of the bus stop shelters proposed in the bus shelter plan that have been installed; and] | ||||
| (g)(3)(B)(ii) | (ii) [inserted: ] | |||
| [inserted: verification, in a form determined by the Secretary, that the bus stop shelters identified in clause (i)—] | ||||
| (g)(3)(B)(ii)(I) | (I) [inserted: ] | |||
| [inserted: were constructed; and] | ||||
| (g)(3)(B)(ii)(II) | (II) [inserted: ] | |||
| [inserted: meet weather standards.] | ||||
| (g)(4) | (4) [inserted: Grant requirements.—] | |||
| [inserted: Except as otherwise provided in this subsection, amounts provided under this subsection shall be subject to the requirements of section 5307 of title 49, United States Code.] | ||||
| (g)(5) | (5) [inserted: Definitions.—] | |||
| [inserted: In this subsection:] | ||||
| (g)(5)(B) | (B) [inserted: Bus shelter plan.—] | |||
| [inserted: The term “bus shelter plan” means a plan prepared by an eligible entity that—] | ||||
| (g)(5)(B)(i) | (i) [inserted: ] | |||
| [inserted: identifies which bus stops under the jurisdiction of the entity that do not either shelter, seating, or both;] | ||||
| (g)(5)(B)(ii) | (ii) [inserted: ] | |||
| [inserted: the order of priority for installing bus stop shelters at stops identified in clause (i); and] | ||||
| (g)(5)(B)(iii) | (iii) [inserted: ] | |||
| [inserted: how the order of priority listed in clause (ii) addresses equity of service to all riders regardless of whether the riders are low-income, seniors, or members of a community of color.] | ||||
| (g)(5)(C) | (C) [inserted: Bus stop shelter.—] | |||
| [inserted: The term “bus stop shelter” means a structure installed at a stop on a fixed-route bus service that—] | ||||
| (g)(5)(C)(i) | (i) [inserted: ] | |||
| [inserted: meets weather standards;] | ||||
| (g)(5)(C)(ii) | (ii) [inserted: ] | |||
| [inserted: provides seating; and] | ||||
| (g)(5)(C)(iii) | (iii) [inserted: ] | |||
| [inserted: has signage that tracks arrival time of transit vehicles.] | ||||
| (g)(5)(D) | (D) [inserted: Eligible entity.—] | |||
| [inserted: The term “eligible entity” means a recipient or subrecipient of assistance under section 5307 or 5311.] | ||||
| (g)(5)(E) | (E) [inserted: Weather standards.—] | |||
| [inserted: The term “weather standards” means guidelines, as determined by the Secretary, outlining what protection a bus stop shelter provides individuals based on weather conditions, including—] | ||||
| (g)(5)(E)(i) | (i) [inserted: ] | |||
| [inserted: levels of rain, snow, and other types of precipitation;] | ||||
| (g)(5)(E)(ii) | (ii) [inserted: ] | |||
| [inserted: heat and sunshine; and] | ||||
| (g)(5)(E)(iii) | (iii) [inserted: ] | |||
| [inserted: extreme cold.] | ||||
| (g)(6) | (6) [inserted: Authorization of appropriations.—] | |||
| [inserted: There is authorized to be appropriated $1,000,000,000 for each of fiscal years 2026 through 2030 to provide grants under this subsection.] | ||||
| (h) | (h) [inserted: All stations accessibility program.—] | |||
| (h)(1) | (1) [inserted: In general.—] | |||
| [inserted: The Secretary may make grants under this subsection to assist eligible entities in financing capital projects to upgrade accessibility for individuals with disabilities by increasing the number of covered stations that meet the construction standards of title II of the Americans with Disabilities Act of 1990 (42 U.S.C. 12131 et seq.).] | ||||
| (h)(2) | (2) [inserted: Eligible costs.—] | |||
| [inserted: A grant awarded under this section shall be used by an eligible entity for the purpose described in paragraph (1) only—] | ||||
| (h)(2)(A) | (A) [inserted: ] | |||
| [inserted: for a project to repair, improve, or relocate station infrastructure at a covered station;] | ||||
| (h)(2)(B) | (B) [inserted: ] | |||
| [inserted: to develop or modify a plan for pursuing public transportation accessibility projects; or] | ||||
| (h)(2)(C) | (C) [inserted: ] | |||
| [inserted: to carry out other projects at covered stations that meet the construction standards of title II of the Americans with Disabilities Act of 1990 (42 U.S.C. 12131 et seq.).] | ||||
| (h)(3) | (3) [inserted: Eligible facilities.—] | |||
| [inserted: The Secretary—] | ||||
| (h)(3)(A) | (A) [inserted: ] | |||
| [inserted: may not provide a grant under this subsection to upgrade a station that is accessible to, and usable by, individuals with disabilities consistent with construction standards under title II the Americans with Disabilities Act of 1990 (42 U.S.C. 1231 et seq.); and] | ||||
| (h)(3)(B) | (B) [inserted: ] | |||
| [inserted: may provide a grant to upgrade a station that is not accessible and usable as described in paragraph (1), even if related services, programs, or activities, if viewed in entirety, are readily accessible and usable as so described.] | ||||
| (h)(4) | (4) [inserted: Application.—] | |||
| [inserted: To apply for a grant under this subsection, an applicant shall provide to the Secretary such information as the Secretary may require, including information on—] | ||||
| (h)(4)(A) | (A) [inserted: ] | |||
| [inserted: the extent to which the proposed project will increase the accessibility of a covered system;] | ||||
| (h)(4)(B) | (B) [inserted: ] | |||
| [inserted: projected improvements in access to jobs, community activities, and essential destinations provided by such project;] | ||||
| (h)(4)(C) | (C) [inserted: ] | |||
| [inserted: the applicant’s plans to—] | ||||
| (h)(4)(C)(i) | (i) [inserted: ] | |||
| [inserted: enhance the customer experience and maximize accessibility of stations, and the transit options such stations serve, for individuals with disabilities;] | ||||
| (h)(4)(C)(ii) | (ii) [inserted: ] | |||
| [inserted: improve the operations of, provide efficiencies of service to, and enhance the public transportation system for individuals with disabilities; and] | ||||
| (h)(4)(C)(iii) | (iii) [inserted: ] | |||
| [inserted: address equity of service to all riders regardless of whether the riders are low-income, seniors, or members of a community of color; and] | ||||
| (h)(4)(D) | (D) [inserted: ] | |||
| [inserted: coordination between the applicant and disability advocacy entities.] | ||||
| (h)(5) | (5) [inserted: Federal share.—] | |||
| [inserted: The Federal share of the total project cost of a grant provided under this subsection shall be 90 percent. The recipient may provide additional local matching amounts.] | ||||
| (h)(6) | (6) [inserted: Grant requirements.—] | |||
| [inserted: Except as otherwise provided under this subsection, a grant provided under this subsection shall be subject to the requirements of section 5307.] | ||||
| (h)(7) | (7) [inserted: Grant solicitation.—] | |||
| [inserted: The Secretary may provide funds authorized under this subsection through 1 or more notices of funding opportunity.] | ||||
| (h)(8) | (8) [inserted: Funding.—] | |||
| (h)(8)(A) | (A) [inserted: Authorization of appropriations.—] | |||
| [inserted: There is authorized to be appropriated $1,000,000,000 for each of fiscal years 2026 through 2030 to provide grants under this subsection.] | ||||
| (h)(8)(B) | (B) [inserted: Availability of amounts.—] | |||
| [inserted: Amounts made available under this subsection shall be available for a period of 4 fiscal years after the fiscal year in which the amount is made available.] | ||||
| (h)(9) | (9) [inserted: Definitions.—] | |||
| [inserted: In this section:] | ||||
| (h)(9)(A) | (A) [inserted: Covered station.—] | |||
| [inserted: The term “covered station” means a bus station, a multimodal transfer station, or a rail fixed guideway public transportation station for passenger use constructed prior to the date of enactment of the Faster Buses Better Futures Act.] | ||||
| (h)(9)(B) | (B) [inserted: Disability.—] | |||
| [inserted: The term “disability” has the meaning given such term in section 3 of the Americans with Disabilities Act of 1990 (42 U.S.C. 12102).] | ||||
| (h)(9)(C) | (C) [inserted: Eligible entity.—] | |||
| [inserted: The term “eligible entity” means—] | ||||
| (h)(9)(C)(i) | (i) [inserted: ] | |||
| [inserted: a recipient or subrecipient of assistance under section 5307 or 5311; or] | ||||
| (h)(9)(C)(ii) | (ii) [inserted: ] | |||
| [inserted: a State or local government that operates a rail fixed guideway public transportation system that was in operation before July 26, 1990.] | ||||
49 U.S.C. § 5339 Grants for buses and bus facilities
3 changes the bill asks for here, 3 carried out
- Carried out:
by amending paragraph (2) to read as follows:
(2) Grant considerations.— In making grants under this subsection, the Secretary shall— (A) consider the age and condition of buses, bus fleets, related equipment, and bus-related facilities; and (B) give priority to eligible recipients who have received a grant under subsection …
- Carried out:
by adding at the end the following:
(12) Authorization of appropriations.— There is authorized to be appropriated to carry out this subsection $20,000,000,000 for the period of fiscal years 2026 through 2030.; and
- Carried out:
by adding at the end the following:
(e) Bus network redesign grants.— (1) Grants authorized.— Not later than 720 days after the date of enactment of the Faster Buses Better Futures Act, the Secretary shall establish a program to award grants, on a competitive basis, to eligible entities. (2) Application.— To …
§ 5339(b)Buses and Bus Facilities Competitive Grants.—(1)–(4)
Start of § 5339 to (b)(1)(A) unchanged
| Where | Mark | The Code now | Mark | As the bill would leave it |
|---|---|---|---|---|
| (1)(B) | (B) | (B) | ||
| rehabilitating, purchasing, constructing, or leasing bus-related facilities. | rehabilitating, purchasing, constructing, or leasing bus-related facilities. | |||
| (2) | (2) Grant considerations.— | (2) Grant considerations.— | ||
| [inserted: In making grants under this subsection, the Secretary shall—] | ||||
| (2)(A) | (A) [inserted: ] | |||
| [inserted: consider the age and condition of buses, bus fleets, related equipment, and bus-related facilities; and] | ||||
| (2)(B) | (B) [inserted: ] | |||
| [inserted: give priority to eligible recipients who have received a grant under subsection (e) and have successfully increased bus ridership as a result of the bus network redesign carried out with such grant.] | ||||
| (2) | ||||
| (3) | (3) Statewide applications.— | (3) Statewide applications.— | ||
| A State may submit a statewide application on behalf of a public agency or private nonprofit organization engaged in public transportation in rural areas or other areas for which the State allocates funds. The submission of a statewide application shall not preclude the submission and consideration of any application under this subsection from other eligible recipients (as described in subsection (a)(4)) in an urbanized area in a State. | A State may submit a statewide application on behalf of a public agency or private nonprofit organization engaged in public transportation in rural areas or other areas for which the State allocates funds. The submission of a statewide application shall not preclude the submission and consideration of any application under this subsection from other eligible recipients (as described in subsection (a)(4)) in an urbanized area in a State. | |||
| (4) | (4) Requirements for the secretary.— | (4) Requirements for the secretary.— | ||
| The Secretary shall— | The Secretary shall— | |||
§ 5339(b)–(c)
(b)(4)(A)–(11) unchanged
| Where | Mark | The Code now | Mark | As the bill would leave it |
|---|---|---|---|---|
| (b)(11)(A) | (A) In general.— | (A) In general.— | ||
| Eligible recipients under this subsection should, to the extent practicable, seek to utilize the procurement tools authorized under section 3019 of the FAST Act (49 U.S.C. 5325 note; Public Law 114–94). | Eligible recipients under this subsection should, to the extent practicable, seek to utilize the procurement tools authorized under section 3019 of the FAST Act (49 U.S.C. 5325 note; Public Law 114–94). | |||
| (b)(11)(B) | (B) Written explanation.— | (B) Written explanation.— | ||
| If an eligible recipient under this subsection purchases less than 5 buses through a standalone procurement, the eligible recipient shall provide to the Secretary a written explanation regarding why the tools authorized under section 3019 of the FAST Act (49 U.S.C. 5325 note; Public Law 114–94) were not utilized. | If an eligible recipient under this subsection purchases less than 5 buses through a standalone procurement, the eligible recipient shall provide to the Secretary a written explanation regarding why the tools authorized under section 3019 of the FAST Act (49 U.S.C. 5325 note; Public Law 114–94) were not utilized. | |||
| (b)(12) | (12) [inserted: Authorization of appropriations.—] | |||
| [inserted: There is authorized to be appropriated to carry out this subsection $20,000,000,000 for the period of fiscal years 2026 through 2030.] | ||||
| (c) | (c) Low or No Emission Grants.— | (c) Low or No Emission Grants.— | ||
| (c)(1) | (1) Definitions.— | (1) Definitions.— | ||
| In this subsection— | In this subsection— | |||
§ 5339(c)–(e)
(c)(1)(A)–(8)(A) unchanged
| Where | Mark | The Code now | Mark | As the bill would leave it |
|---|---|---|---|---|
| (c)(8)(B) | (B) Competitive procurement.— | (B) Competitive procurement.— | ||
| Eligible projects awarded with partnerships under this subsection shall be considered to satisfy the requirement for a competitive procurement under section 5325. | Eligible projects awarded with partnerships under this subsection shall be considered to satisfy the requirement for a competitive procurement under section 5325. | |||
| (d) | (d) Workforce Development Training Activities.— | (d) Workforce Development Training Activities.— | ||
| 5 percent of grants related to zero emissions vehicles (as defined in subsection (c)(1)) or related infrastructure under subsection (b) or (c) shall be used by recipients to fund workforce development training, as described in section 5314(b)(2) (including registered apprenticeships and other labor-management training programs) under the recipient’s plan to address the impact of the transition to zero emission vehicles on the applicant’s current workforce under subsection (c)(3)(D), unless the recipient certifies a smaller percentage is necessary to carry out that plan. | 5 percent of grants related to zero emissions vehicles (as defined in subsection (c)(1)) or related infrastructure under subsection (b) or (c) shall be used by recipients to fund workforce development training, as described in section 5314(b)(2) (including registered apprenticeships and other labor-management training programs) under the recipient’s plan to address the impact of the transition to zero emission vehicles on the applicant’s current workforce under subsection (c)(3)(D), unless the recipient certifies a smaller percentage is necessary to carry out that plan. | |||
| (e) | (e) [inserted: Bus network redesign grants.—] | |||
| (e)(1) | (1) [inserted: Grants authorized.—] | |||
| [inserted: Not later than 720 days after the date of enactment of the Faster Buses Better Futures Act, the Secretary shall establish a program to award grants, on a competitive basis, to eligible entities.] | ||||
| (e)(2) | (2) [inserted: Application.—] | |||
| [inserted: To receive a grant under this subsection, an eligible entity shall complete an eligible bus network redesign and submit to the Secretary an application at such time, in such manner, and containing such information as the Secretary may require, including—] | ||||
| (e)(2)(A) | (A) [inserted: ] | |||
| [inserted: an overview of the existing bus network;] | ||||
| (e)(2)(B) | (B) [inserted: ] | |||
| [inserted: an overview of the eligible bus network redesign;] | ||||
| (e)(2)(C) | (C) [inserted: ] | |||
| [inserted: an analysis of the impact of the bus network redesign on—] | ||||
| (e)(2)(C)(i) | (i) [inserted: ] | |||
| [inserted: service hours; and] | ||||
| (e)(2)(C)(ii) | (ii) [inserted: ] | |||
| [inserted: route miles;] | ||||
| (e)(2)(D) | (D) [inserted: ] | |||
| [inserted: an analysis demonstrating that the eligible bus network redesign can increase transit ridership by 100 percent not later than 6 years after such redesign is implemented;] | ||||
| (e)(2)(E) | (E) [inserted: ] | |||
| [inserted: an evaluation examining any equity and mobility gaps in each transit system operated by the eligible entity or in the geographic area under the jurisdiction of the eligible entity, and how the eligible bus network redesign will significantly close such gaps, including—] | ||||
| (e)(2)(E)(i) | (i) [inserted: ] | |||
| [inserted: public transit ridership rates, disaggregated by—] | ||||
| (e)(2)(E)(i)(I) | (I) [inserted: ] | |||
| [inserted: mode of transit; and] | ||||
| (e)(2)(E)(i)(II) | (II) [inserted: ] | |||
| [inserted: demographic group, including youth (including foster care youth), seniors, individuals with disabilities, and low-income individuals; and] | ||||
| (e)(2)(E)(ii) | (ii) [inserted: ] | |||
| [inserted: average length of bus routes, average speed of bus routes, and average delay times of bus routes;] | ||||
| (e)(2)(F) | (F) [inserted: ] | |||
| [inserted: an estimation of additional costs that the eligible entity will incur in order to implement the eligible bus network redesign, including—] | ||||
| (e)(2)(F)(i) | (i) [inserted: ] | |||
| [inserted: fuel costs;] | ||||
| (e)(2)(F)(ii) | (ii) [inserted: ] | |||
| [inserted: personnel costs;] | ||||
| (e)(2)(F)(iii) | (iii) [inserted: ] | |||
| [inserted: maintenance costs; and] | ||||
| (e)(2)(F)(iv) | (iv) [inserted: ] | |||
| [inserted: other operational costs; and] | ||||
| (e)(2)(G) | (G) [inserted: ] | |||
| [inserted: a description of eligible projects that the eligible entity intends to carry out to implement the eligible bus network redesign, including—] | ||||
| (e)(2)(G)(i) | (i) [inserted: ] | |||
| [inserted: expanding bus fleets; and] | ||||
| (e)(2)(G)(ii) | (ii) [inserted: ] | |||
| [inserted: constructing additional bus garages.] | ||||
| (e)(3) | (3) [inserted: Grant uses.—] | |||
| [inserted: A grant awarded under this section may only be used to—] | ||||
| (e)(3)(A) | (A) [inserted: ] | |||
| [inserted: carry out eligible projects; and] | ||||
| (e)(3)(B) | (B) [inserted: ] | |||
| [inserted: pay for the difference in operating costs between the existing level of fixed-route bus service and the level outlined in the eligible bus network redesign submitted pursuant to paragraph (2).] | ||||
| (e)(4) | (4) [inserted: Federal share.—] | |||
| (e)(4)(A) | (A) [inserted: Eligible projects.—] | |||
| [inserted: The Federal share of the costs described in paragraph (3)(A) shall be 80 percent.] | ||||
| (e)(4)(B) | (B) [inserted: First 3-year period.—] | |||
| [inserted: In calculating the Federal share of the costs described in paragraph (3)(B)—] | ||||
| (e)(4)(B)(i) | (i) [inserted: ] | |||
| [inserted: for the 3-year period beginning on the date on which an eligible entity receives a grant under this subsection, such Federal share shall be 100 percent; and] | ||||
| (e)(4)(B)(ii) | (ii) [inserted: ] | |||
| [inserted: for any period of a grant award that is during the 3-year period beginning on the date on which the period described in clause (i) ends, such Federal share shall be 33 percent.] | ||||
| (e)(5) | (5) [inserted: Priority.—] | |||
| [inserted: In awarding grants under this subsection, the Secretary shall prioritize awarding grants to eligible entities that propose an eligible bus network redesign that is capable of increasing transit ridership by the largest percentage.] | ||||
| (e)(6) | (6) [inserted: Conditions of grant assistance.—] | |||
| [inserted: As a condition of receiving a grant under this subsection, an eligible entity shall—] | ||||
| (e)(6)(A) | (A) [inserted: ] | |||
| [inserted: in the case of an entity that is a recipient of a grant under section 5307—] | ||||
| (e)(6)(A)(i) | (i) [inserted: ] | |||
| [inserted: report to the Federal Transit Administration, for inclusion in the National Transit Database—] | ||||
| (e)(6)(A)(i)(I) | (I) [inserted: ] | |||
| [inserted: the service frequency, vehicle revenue hours, and unlinked passenger trips originating and terminating in areas of persistent poverty and underserved communities;] | ||||
| (e)(6)(A)(i)(II) | (II) [inserted: ] | |||
| [inserted: the number of jobs and essential services accessible by transit, and improvement in such access, including specific reporting on access by transit for areas of persistent poverty and underserved communities; and] | ||||
| (e)(6)(A)(i)(III) | (III) [inserted: ] | |||
| [inserted: any other data the Secretary determines necessary and appropriate; and] | ||||
| (e)(6)(A)(ii) | (ii) [inserted: ] | |||
| [inserted: during the 1-year period preceding the date on which the entity receives such grant, and at least every 2 years thereafter, conduct a survey of transit riders and nonriding residents of areas of persistent poverty and underserved communities on transit service improvements, using means designed to maximize participation from riders and nonriders, and publish the survey results in an online format;] | ||||
| (e)(6)(B) | (B) [inserted: ] | |||
| [inserted: in the case of an entity that is Indian Tribe—] | ||||
| (e)(6)(B)(i) | (i) [inserted: ] | |||
| [inserted: report to the Federal Transit Administration, for inclusion in the National Transit Database—] | ||||
| (e)(6)(B)(i)(I) | (I) [inserted: ] | |||
| [inserted: revenue vehicle hours and unlinked passenger trips; and] | ||||
| (e)(6)(B)(i)(II) | (II) [inserted: ] | |||
| [inserted: any other data the Secretary determines necessary and appropriate; and] | ||||
| (e)(6)(B)(ii) | (ii) [inserted: ] | |||
| [inserted: during the 1-year period preceding the date on which the entity receives such grant, and at least every 2 years thereafter, conduct a survey of transit riders and nonriding residents of the service area on transit service improvements, using means designed to maximize participation from riders and nonriders, and publish the survey results in an online format; and] | ||||
| (e)(6)(C) | (C) [inserted: ] | |||
| [inserted: in the case of an entity that is a State receiving a grant under section 5311—] | ||||
| (e)(6)(C)(i) | (i) [inserted: ] | |||
| [inserted: report to the Federal Transit Administration, for inclusion in the National Transit Database—] | ||||
| (e)(6)(C)(i)(I) | (I) [inserted: ] | |||
| [inserted: revenue vehicle hours for each State, including revenue vehicle hours and unlinked passenger trips originating and terminating in areas of persistent poverty and underserved communities; and] | ||||
| (e)(6)(C)(i)(II) | (II) [inserted: ] | |||
| [inserted: any other data the Secretary determines necessary and appropriate;] | ||||
| (e)(6)(C)(ii) | (ii) [inserted: ] | |||
| [inserted: provide an annually updated report to the Secretary—] | ||||
| (e)(6)(C)(ii)(I) | (I) [inserted: ] | |||
| [inserted: that identifies underserved communities and areas of persistent poverty in the nonurbanized areas of the State that do not have any reported public transit services, or in which either the availability or utilization of rural public transit is in the bottom quintile of all rural public transit services in the United States, using measurements identified by the Secretary; and] | ||||
| (e)(6)(C)(ii)(II) | (II) [inserted: ] | |||
| [inserted: that describes progress toward achieving a strategy for establishing high-quality transit service in such communities and areas; and] | ||||
| (e)(6)(C)(iii) | (iii) [inserted: ] | |||
| [inserted: during the 1-year period preceding the date on which the State receives such grant, and at least every 2 years thereafter, conduct a survey of transit riders and nonriding residents of areas of persistent poverty and underserved communities within the State regarding transit service improvements, using means designed to maximize participation from riders and nonriders, and publishes the survey results in an online format.] | ||||
| (e)(7) | (7) [inserted: Rule of construction.—] | |||
| [inserted: Nothing in this subsection may be construed to prevent an eligible entity from implementing a redesigned bus network through the use of any other Federal or non-Federal funds.] | ||||
| (e)(8) | (8) [inserted: Authorization of appropriations.—] | |||
| [inserted: To carry out this subsection, there is authorized to be appropriated $250,000,000,000 for the period of fiscal years 2026 through 2030.] | ||||
| (e)(9) | (9) [inserted: Definitions.—] | |||
| [inserted: In this subsection:] | ||||
| (e)(9)(A) | (A) [inserted: Additional forms of collective transportation.—] | |||
| [inserted: The term “additional forms of collective transportation” means forms of collective transportation that are not considered public transportation, including intercity passenger rail transportation, intercity bus service, and school bus service.] | ||||
| (e)(9)(B) | (B) [inserted: Area of persistent poverty.—] | |||
| [inserted: The term “area of persistent poverty” means—] | ||||
| (e)(9)(B)(i) | (i) [inserted: ] | |||
| [inserted: a county that has consistently had greater than or equal to 20 percent of the population of such county living in poverty during the most recent 30-year period for which data is available, as measured by the 1990 and 2000 decennial censuses; or] | ||||
| (e)(9)(B)(ii) | (ii) [inserted: ] | |||
| [inserted: a census tract with a poverty rate of at least 20 percent as measured by the 2014 through 2018 5-year data series available from the American Community Survey of the Bureau of the Census.] | ||||
| (e)(9)(B)(iii) | (iii) [inserted: Eligible bus network redesign.—] | |||
| [inserted: The term “eligible bus network redesign” means a fixed route bus network redesign that—] | ||||
| (e)(9)(B)(iii)(I) | (I) [inserted: ] | |||
| [inserted: through eligible projects, is expected to increase total transit network ridership levels by 100 percent more than such ridership levels as of April 1, 2025, by the end of the 6-year period beginning on the date of implementation of such redesign;] | ||||
| (e)(9)(B)(iii)(II) | (II) [inserted: ] | |||
| [inserted: is informed by extensive, equitable outreach to affected communities, underserved communities, and areas of persistent poverty communities; and] | ||||
| (e)(9)(B)(iii)(III) | (III) [inserted: ] | |||
| [inserted: does not rely on ridership increases from—] | ||||
| (e)(9)(B)(iii)(III)(aa) | (aa) [inserted: ] | |||
| [inserted: microtransit;] | ||||
| (e)(9)(B)(iii)(III)(bb) | (bb) [inserted: ] | |||
| [inserted: automated buses; and] | ||||
| (e)(9)(B)(iii)(III)(cc) | (cc) [inserted: ] | |||
| [inserted: fare elimination.] | ||||
| (e)(9)(B)(iv) | (iv) [inserted: Eligible entity.—] | |||
| [inserted: The term “eligible entity” means a recipient of funds under section 5307 or 5311.] | ||||
| (e)(9)(B)(v) | (v) [inserted: Eligible project.—] | |||
| [inserted: The term “eligible project” means any project, or program of projects, that is implemented as part of an eligible bus network redesign, including—] | ||||
| (e)(9)(B)(v)(I) | (I) [inserted: ] | |||
| [inserted: a project that reconfigures routes to better serve trips individuals are seeking to take;] | ||||
| (e)(9)(B)(v)(II) | (II) [inserted: ] | |||
| [inserted: a project that improves integration of fixed route bus service and—] | ||||
| (e)(9)(B)(v)(II)(aa) | (aa) [inserted: ] | |||
| [inserted: higher order forms of public transportation; and] | ||||
| (e)(9)(B)(v)(II)(bb) | (bb) [inserted: ] | |||
| [inserted: additional forms of collective transportation;] | ||||
| (e)(9)(B)(v)(III) | (III) [inserted: ] | |||
| [inserted: a project that consolidates stops on fixed route bus service;] | ||||
| (e)(9)(B)(v)(IV) | (IV) [inserted: ] | |||
| [inserted: a project that rationalizes fare policies through means such as fare integration, fare capping, and fare subsidization;] | ||||
| (e)(9)(B)(v)(V) | (V) [inserted: ] | |||
| [inserted: a project that decreases headways;] | ||||
| (e)(9)(B)(v)(VI) | (VI) [inserted: ] | |||
| [inserted: a project that expands service area, hours, or days;] | ||||
| (e)(9)(B)(v)(VII) | (VII) [inserted: ] | |||
| [inserted: a project for new or increased frequent nonfixed guideway service or frequent fixed guideway service; and] | ||||
| (e)(9)(B)(v)(VIII) | (VIII) [inserted: ] | |||
| [inserted: associated capital improvements related to projects described in clauses (i) through (vii).] | ||||
| (e)(9)(B)(vi) | (vi) [inserted: Higher-order forms of public transportation.—] | |||
| [inserted: The term “higher-order forms of public transportation” means bus rapid transit, light rail transit, heavy rail transit, and commuter rail.] | ||||
| (e)(9)(B)(vii) | (vii) [inserted: Overview.—] | |||
| [inserted: The term “overview” means a list of routes on a bus network, a timetable for each route, and a map showing each route, with connections to higher-order forms of public transportation and additional collective transportation noted on the timetable and map.] | ||||
| (e)(9)(B)(viii) | (viii) [inserted: Underserved community.—] | |||
| [inserted: The term “underserved community” means—] | ||||
| (e)(9)(B)(viii)(I) | (I) [inserted: ] | |||
| [inserted: a census tract or block numbering area in which the median income does not exceed 80 percent of the area median income;] | ||||
| (e)(9)(B)(viii)(II) | (II) [inserted: ] | |||
| [inserted: families with income not greater than 100 percent of the area median income that reside in minority census tracts;] | ||||
| (e)(9)(B)(viii)(III) | (III) [inserted: ] | |||
| [inserted: families with income not greater than 100 percent of the area median income that reside in areas affected by disasters, as determined by the Administrator of the Federal Transit Administration;] | ||||
| (e)(9)(B)(viii)(IV) | (IV) [inserted: ] | |||
| [inserted: a census tract that has a minority population of at least 30 percent or a median income of less than 100 percent of the area median income;] | ||||
| (e)(9)(B)(viii)(V) | (V) [inserted: ] | |||
| [inserted: a community that has low access to jobs and essential services, as determined by the Secretary; or] | ||||
| (e)(9)(B)(viii)(VI) | (VI) [inserted: ] | |||
| [inserted: a census block or group of geographically contiguous census blocks in which the population of any racial or ethnic minority individuals, individually or in combination, comprises 30 percent or more of the population of persons in the census block or group of geographically contiguous census blocks.] | ||||