Title 49 · TransportationTransportation
Changes to 49 U.S.C. § 60108
H.R. 5301 · PIPES Act of 2025 · Introduced The text as a member of Congress first filed it. Most bills never get further than this.
Reported by committee · step 2 of 5
49 U.S.C. § 60108 Inspection and maintenance
3 changes the bill asks for here, 3 carried out
- Carried out:
Section 60108(a) of title 49, United States Code, is amended by adding at the end the following:
(4) Alternative method of maintaining rights-of-way.— (A) In general.— As part of the review conducted under paragraph (3), the Secretary shall allow for an alternative method of maintaining rights-of-way for pipelines and other pipeline facilities under a voluntary program …
- Carried out:
in subsection (a)(1) by striking
gas pipeline facility or hazardous liquid pipeline facility
and insertinggas pipeline facility, hazardous liquid pipeline facility, or carbon dioxide pipeline facility
; and - Carried out:
in subsection (e)(1) by striking
gas or hazardous liquid pipeline facility
and insertinggas pipeline facility, hazardous liquid pipeline facility, or carbon dioxide pipeline facility
.
§ 60108(a)
§ 60108. Inspection and maintenance
(a) Plans.—
(1) Each person owning or operating a gas pipeline facility[inserted: ,] [struck: or ]hazardous liquid pipeline facility[inserted: ,] [inserted: or carbon dioxide pipeline facility ]shall carry out a current written plan (including any changes) for inspection and maintenance of each facility used in the transportation and owned or operated by the person. A copy of the plan shall be kept at any office of the person the Secretary of Transportation considers appropriate. The Secretary also may require a person owning or operating a pipeline facility subject to this chapter to file a plan for inspection and maintenance for approval.
(2) If the Secretary or a State authority responsible for enforcing standards prescribed under this chapter decides that a plan required under paragraph (1) of this subsection is inadequate for safe operation, the Secretary or authority shall require the person to revise the plan. Revision may be required only after giving notice and an opportunity for a hearing. A plan required under paragraph (1) must be practicable and designed to meet the need for pipeline safety, must meet the requirements of any regulations promulgated under section 60102(q), and must include terms designed to enhance the ability to discover safety-related conditions described in section 60102(h)(1) of this title. In deciding on the adequacy of a plan, the Secretary or authority shall consider—
(A) relevant available pipeline safety information;
§ 60108(a)–(b)
(a)(2)(B)–(3)(A) unchanged ·
(B) Context of review.— The Secretary may conduct a review under this paragraph as an element of the inspection of the operator carried out by the Secretary under subsection (b).
(C) Inadequate programs.— If the Secretary determines that a plan reviewed under this paragraph does not comply with the requirements of this chapter (including any regulations promulgated under this chapter), has not been adequately implemented, is inadequate for the safe operation of a pipeline facility, or is otherwise inadequate, the Secretary may conduct enforcement proceedings under this chapter.
(4) [inserted: Alternative method of maintaining rights-of-way.—]
(A) [inserted: In general.—] [inserted: As part of the review conducted under paragraph (3), the Secretary shall allow for an alternative method of maintaining rights-of-way for pipelines and other pipeline facilities under a voluntary program carried out by the operator if such alternative method achieves a level of safety at least equal to the level of safety required by regulations issued under this chapter.]
(B) [inserted: Purpose.—] [inserted: An operator considering implementing an alternative method described under subparagraph (A) may consider incorporating into the plan for implementing such method 1 or more conservation practices, including—]
(i) [inserted: integrated vegetation management practices, including reduced mowing;]
(ii) [inserted: the development of habitat and forage for pollinators and other wildlife through seeding or planting of diverse native forbs and grasses;]
(iii) [inserted: practices relating to maintenance strategies that promote early successional vegetation or limit disturbance during periods of highest use by target pollinator species and other wildlife on pipeline or facilities rights-of-way, including—]
(I) [inserted: increasing mowing height;]
(II) [inserted: reducing mowing frequency; and]
(III) [inserted: refraining from mowing monarch and other pollinator habitat during periods in which monarchs or other pollinators are present;]
(iv) [inserted: an integrated vegetation management plan that may include approaches such as mechanical tree and brush removal and targeted and judicious use of herbicides and mowing to address incompatible or undesirable vegetation while promoting compatible and beneficial vegetation on pipeline and facilities rights-of-way;]
(v) [inserted: planting or seeding of deeply rooted, regionally appropriate perennial grasses and wildflowers, including milkweed, to enhance habitat;]
(vi) [inserted: removing shallow-rooted grasses from planting and seeding mixes, except for use as nurse or cover crops; or]
(vii) [inserted: obtaining expert training or assistance on wildlife and pollinator-friendly practices, including—]
(I) [inserted: native plant identification;]
(II) [inserted: establishment and management of regionally appropriate native plants;]
(III) [inserted: land management practices; and]
(IV) [inserted: integrated vegetation management.]
(C) [inserted: Savings clause.—] [inserted: Nothing in this section exempts an operator from compliance with the applicable requirements under this chapter or any applicable regulations promulgated under this chapter.]
(D) [inserted: Consultation.—]
(i) [inserted: Available guidance.—] [inserted: In developing such alternative methods, an operator shall consult any available guidance issued by—]
(I) [inserted: the Secretary; or]
(II) [inserted: an applicable State agency carrying out compliance activities on behalf of the Secretary in accordance with section 60105.]
(ii) [inserted: Leading industry practices.—] [inserted: In the absence of the guidance described in clause (i), an operator may consult leading industry practices and guidance to develop and implement such alternative methods.]
(b) Inspection and Testing.—
(1) The Secretary shall inspect and require appropriate testing of a pipeline facility subject to this chapter that is not covered by a certification under section 60105 of this title or an agreement under section 60106 of this title. The Secretary shall decide on the frequency and type of inspection and testing under this subsection on a case-by-case basis after considering the following:
§ 60108(e)In General.—(1)–(2)
(b)(1)(A)–(d)(4) unchanged ·
(e) In General.— After the completion of a Pipeline and Hazardous Materials Safety Administration pipeline safety inspection, the Administrator of such Administration, or the State authority certified under section 60105 of title 49, United States Code, to conduct such inspection, shall—
(1) within 30 days, conduct a post-inspection briefing with the owner or operator of the gas [struck: or][inserted: pipeline] [inserted: facility, ]hazardous liquid pipeline facility[inserted: ,] [inserted: or carbon dioxide pipeline facility ]inspected outlining any concerns; and
(2) within 90 days, to the extent practicable, provide the owner or operator with written preliminary findings of the inspection.