Title 49 · TransportationTransportation
Changes to 49 U.S.C. § 60117
H.R. 5301 · PIPES Act of 2025 · Introduced The text as a member of Congress first filed it. Most bills never get further than this.
Reported by committee · step 2 of 5
49 U.S.C. § 60117 Administrative
7 changes the bill asks for here, 7 carried out
- Carried out:
in subparagraph (A) by striking
liquid pipeline facility or liquefied natural gas pipeline facility
and insertingliquid pipeline facility, a liquefied natural gas pipeline facility, or a carbon dioxide pipeline facility
; and - Carried out:
in subparagraph (B)(i)(II) by inserting
or carbon dioxide pipeline facility
afterhazardous liquid pipeline facility
; and - Carried out:
in paragraph (1) by striking
gas or hazardous liquid pipeline facilities
and insertinggas pipeline facilities, hazardous liquid pipeline facilities, or carbon dioxide pipeline facilities
; and - Carried out:
in paragraph (8) by striking
gas or hazardous liquid pipeline facility
and insertinggas pipeline facility, hazardous liquid pipeline facility, or carbon dioxide pipeline facility
. - Carried out:
in subparagraph (I) by striking
and
at the end; - Carried out:
in subparagraph (J) by striking the period and inserting
; and
; and - Carried out:
by adding at the end the following:
(K) allow the respondent an opportunity for a hearing on the record conducted by an administrative law judge, in accordance with section 554 of title 5, for a notice of probable violation enforcement matter— (i) with a proposed civil penalty of at least $125,000; or (ii) where …
§ 60117(b)Enforcement Procedures.—(1)–(2)
Start of § 60117 to (b)(1)(G) unchanged ·
(H) require the Office of Pipeline Safety to file a post-hearing recommendation not later than 30 days after the deadline for any post-hearing submission of a respondent;
(I) require an order on a petition for reconsideration to be issued not later than 120 days after the date on which the petition is filed;[struck: and]
(J) allow an operator to request that an issue of controversy or uncertainty be addressed through a declaratory order in accordance with section 554(e) of title 5[struck: .][inserted: ; and]
(K) [inserted: allow the respondent an opportunity for a hearing on the record conducted by an administrative law judge, in accordance with section 554 of title 5, for a notice of probable violation enforcement matter—]
(i) [inserted: with a proposed civil penalty of at least $125,000; or]
(ii) [inserted: where the respondent can reasonably show the cost of the proposed compliance action will exceed $125,000.]
(2) Open to the public.— A hearing under this section shall be—
(A) noticed to the public on the website of the Pipeline and Hazardous Materials Safety Administration; and
§ 60117(o)Cost Recovery for Design Reviews.—(1)–(2)
(b)(2)(B)–(n)(2) unchanged ·
(o) Cost Recovery for Design Reviews.—
(1) In general.—
(A) Review costs.— For any project described in subparagraph (B), if the Secretary conducts facility design safety reviews in connection with a proposal to construct, expand, or operate a gas or hazardous liquid pipeline facility[inserted: ,] [struck: or][inserted: a] liquefied natural gas pipeline facility, [inserted: or a carbon dioxide pipeline facility, ]including construction inspections and oversight, the Secretary may require the person proposing the project to pay the costs incurred by the Secretary relating to such reviews. If the Secretary exercises the cost recovery authority described in this paragraph, the Secretary shall prescribe a fee structure and assessment methodology that is based on the costs of providing these reviews and shall prescribe procedures to collect fees under this paragraph. The Secretary may not collect design safety review fees under this paragraph and section 60301 for the same design safety review.
(B) Projects to which applicable.— Subparagraph (A) applies to any project that—
(i) has design and construction costs totaling at least $2,500,000,000, as periodically adjusted by the Secretary to take into account increases in the Consumer Price Index for all-urban consumers published by the Department of Labor, based on—
(I) the cost estimate provided to the Federal Energy Regulatory Commission in an application for a certificate of public convenience and necessity for a gas pipeline facility or an application for authorization for a liquefied natural gas pipeline facility; or
(II) a good faith estimate developed by the person proposing a hazardous liquid pipeline facility [inserted: or carbon dioxide pipeline facility ]and submitted to the Secretary; or
(ii) uses new or novel technologies or design, as determined by the Secretary.
(2) Notification.— For any new pipeline facility construction project in which the Secretary will conduct design reviews, the person proposing the project shall notify the Secretary and provide the design specifications, construction plans and procedures, and related materials at least 120 days prior to the commencement of construction. To the maximum extent practicable, not later than 90 days after receiving such design specifications, construction plans and procedures, and related materials, the Secretary shall provide written comments, feedback, and guidance on the project.
§ 60117(o)–(p)
(o)(3) unchanged ·
(4) No additional permitting authority.— Nothing in this subsection may be construed as authorizing the Secretary to require a person to obtain a permit before beginning design and construction in connection with a project described in paragraph (1)(B).
(p) Emergency Order Authority.—
(1) In general.— If the Secretary determines that an unsafe condition or practice, or a combination of unsafe conditions and practices, constitutes or is causing an imminent hazard, the Secretary may issue an emergency order described in paragraph (3) imposing emergency restrictions, prohibitions, and safety measures on owners and operators of gas [struck: or][inserted: pipeline] [inserted: facilities, ]hazardous liquid pipeline facilities[inserted: ,] [inserted: or carbon dioxide pipeline facilities ]without prior notice or an opportunity for a hearing, but only to the extent necessary to abate the imminent hazard.
(2) Considerations.—
(A) In general.— Before issuing an emergency order under paragraph (1), the Secretary shall consider, as appropriate, the following factors:
§ 60117(p)Emergency Order Authority.—(7)–(9)
(p)(2)(A)(i)–(7)(A) unchanged ·
(B) Final regulations.— Not later than 270 days after such date of enactment, the Secretary shall issue such regulations as are necessary to carry out this subsection. Such regulations shall ensure that the review process described in paragraph (4) contains the same procedures as subsections (d) and (g) of section 109.19 of title 49, Code of Federal Regulations, and is otherwise consistent with the review process developed under such section, to the greatest extent practicable and not inconsistent with this section.
(8) Imminent hazard defined.— In this subsection, the term “imminent hazard” means the existence of a condition relating to a gas [struck: or][inserted: pipeline] [inserted: facility, ]hazardous liquid pipeline facility[inserted: ,] [inserted: or carbon dioxide pipeline facility ]that presents a substantial likelihood that death, serious illness, severe personal injury, or a substantial endangerment to health, property, or the environment may occur before the reasonably foreseeable completion date of a formal proceeding begun to lessen the risk of such death, illness, injury, or endangerment.
(9) Limitation and savings clause.— An emergency order issued under this subsection may not be construed to—
(A) alter, amend, or limit the Secretary’s obligations under, or the applicability of, section 553 of title 5; or
(B) provide the authority to amend the Code of Federal Regulations.