Title 49 · TransportationTransportation
Changes to 49 U.S.C. § 60139
H.R. 5301 · PIPES Act of 2025 · Introduced The text as a member of Congress first filed it. Most bills never get further than this.
Reported by committee · step 2 of 5
49 U.S.C. § 60139 Maximum allowable operating pressure
3 changes the bill asks for here, 3 carried out
- Carried out:
in subsection (c)(1)(A) by inserting
except as provided in subsection (e),
beforerequire
; - Carried out:
by redesignating subsection (e) as subsection (f); and
- Carried out:
by inserting after subsection (d) the following:
(e) Testing records working group.— (1) Previously tested transmission lines.— Until the completion of the report of the Working Group required under paragraph (2) and the rulemaking proceeding required under paragraph (3), the Secretary shall not require an owner or operator of …
§ 60139(c)Determination of Maximum Allowable Operating Pressure.—(1)–(2)
Start of § 60139 to (c) unchanged ·
(1) In general.— In the case of a transmission line of an owner or operator of a pipeline facility identified under subsection (b)(1), the Secretary shall—
(A) [inserted: except as provided in subsection (e), ]require the owner or operator to reconfirm a maximum allowable operating pressure as expeditiously as economically feasible; and
(B) determine what actions are appropriate for the pipeline owner or operator to take to maintain safety until a maximum allowable operating pressure is confirmed.
(2) Interim actions.— In determining the actions for an owner or operator of a pipeline facility to take under paragraph (1)(B), the Secretary shall take into account potential consequences to public safety and the environment, potential impacts on pipeline system reliability and deliverability, and other factors, as appropriate.
§ 60139(d)–(f)
(d) unchanged ·
(B) other alternative methods, including in-line inspections, determined by the Secretary to be of equal or greater effectiveness.
(3) Completion of testing.— The Secretary, in consultation with the Chairman of the Federal Energy Regulatory Commission and State regulators, as appropriate, shall establish timeframes for the completion of such testing that take into account potential consequences to public safety and the environment and that minimize costs and service disruptions.
(e) [inserted: Testing records working group.—]
(1) [inserted: Previously tested transmission lines.—] [inserted: Until the completion of the report of the Working Group required under paragraph (2) and the rulemaking proceeding required under paragraph (3), the Secretary shall not require an owner or operator of a pipeline facility to reconfirm the maximum allowable operating pressure of a natural gas transmission pipeline pursuant to section 192.624 of title 49, Code of Federal Regulations, if the owner or operator confirms the material strength of the pipeline through prior testing conducted to a sufficient minimum pressure in accordance with prevailing safety standards and practices, including any applicable class location factors, and documented in contemporaneous records.]
(2) [inserted: Working group report.—]
(A) [inserted: In general.—] [inserted: No later than 30 days after the date of enactment of the PIPES Act of 2025, the Secretary of Transportation shall create a fairly balanced working group (hereinafter referred to as the “Working Group”) to produce a report containing recommendations on the minimum pressure and contemporaneous records that are sufficient to confirm the material strength of a pipeline through prior testing.]
(B) [inserted: Composition of Working Group.—] [inserted: The Working Group—]
(i) [inserted: shall be comprised of the Administrator of the Pipeline and Hazardous Materials Safety Administration, State pipeline regulators, the public, and industry stakeholders active in the operation of natural gas pipelines; and]
(ii) [inserted: may include members of the Technical Pipeline Safety Standards Committee or be conducted in a manner that otherwise ensures input from the public, as determined appropriate by the Secretary.]
(C) [inserted: Consideration.—] [inserted: In preparing the report required under paragraph (1), the Working Group—]
(i) [inserted: shall consider historical practices and all available research conducted regarding minimum pressure and contemporaneous records on transmission pipelines; and]
(ii) [inserted: may consider the need for any additional research or analyses needed to demonstrate the adequacy of any strength testing performed.]
(D) [inserted: Applicability of FACA.—] [inserted: Chapter 10 of title 5 shall not apply to the Working Group.]
(E) [inserted: Submission of report.—] [inserted: Not later than 180 days after the date of enactment of the PIPES Act of 2025, the Working Group shall submit to the Secretary the report produced under paragraph (2), including any minority views.]
(3) [inserted: Rulemaking.—] [inserted: Not later than 180 days after receiving the report described in paragraph (2), the Secretary shall initiate a rulemaking proceeding under section 60102 to revise, or make a technical correction to, the maximum allowable operating pressure reconfirmation regulations issued pursuant to this section.]
[struck: (e)] [inserted: (f)] High-consequence Area Defined.— In this section, the term “high-consequence area” means an area described in section 60109(a).