49 U.S.C. § 60143 Idled pipelines
4 changes the bill asks for here, 4 carried out
- Carried out:
by striking paragraph (1) and inserting the following:
(1) In general.— Not later than 180 days after the date of enactment of the PIPES Act of 2025, the Secretary shall issue a notice of proposed rulemaking prescribing the applicability of the pipeline safety requirements to idled natural gas or other gas transmission and hazardous liquid pipelines.; and
- Carried out:
in paragraph (2), by adding at the end the following:
(E) Consideration.— In promulgating regulations under this section, the Secretary shall consider the adoption of industry consensus standards..
- Carried out:
in subsection (a)(2) by inserting
carbon dioxide,
afterhazardous liquid,
; and - Carried out:
in subsection (b) by striking
gas transmission and hazardous liquid pipelines
and insertinggas transmission, hazardous liquid, and carbon dioxide pipelines
each place it appears.
§ 60143(a)–(b)
Start of § 60143 to (a)(1)(A) unchanged
| Where | Mark | The Code now | Mark | As the bill would leave it |
|---|---|---|---|---|
| (a)(1)(B) | (B) | (B) | ||
| will not resume service for a period of not less than 180 days; | will not resume service for a period of not less than 180 days; | |||
| (a)(2) | (2) | (2) | ||
| has been isolated from all sources of hazardous liquid, natural gas, or other gas; and | has been isolated from all sources of hazardous liquid, [inserted: carbon dioxide, ]natural gas, or other gas; and | |||
| (a)(3) | (3) | (3) | ||
| (a)(3)(A) | (A) | (A) | ||
| has been purged of combustibles and hazardous materials and maintains a blanket of inert, nonflammable gas at low pressure; or | has been purged of combustibles and hazardous materials and maintains a blanket of inert, nonflammable gas at low pressure; or | |||
| (a)(3)(B) | (B) | (B) | ||
| has not been purged as described in subparagraph (A), but the volume of gas is so small that there is no potential hazard, as determined by the Secretary pursuant to a rule. | has not been purged as described in subparagraph (A), but the volume of gas is so small that there is no potential hazard, as determined by the Secretary pursuant to a rule. | |||
| (b) | (b) Rulemaking.— | (b) Rulemaking.— | ||
| (b)(1) | (1) In general.— | (1) In general.— | ||
| Not later than | Not later than [inserted: 180] [inserted: days] after the date of enactment of the PIPES Act of [inserted: 2025], the Secretary shall [inserted: issue] [inserted: a] [inserted: notice of proposed rulemaking ]prescribing the applicability of the pipeline safety requirements to idled natural [inserted: gas ]or other gas transmission[inserted: ,] hazardous liquid[inserted: ,] [inserted: and carbon dioxide ]pipelines. | |||
| (b)(2) | (2) Requirements.— | (2) Requirements.— | ||
| (b)(2)(A) | (A) In general.— | (A) In general.— | ||
| The applicability of the regulations under paragraph (1) shall be based on the risk that idled natural or other gas transmission | The applicability of the regulations under paragraph (1) shall be based on the risk that idled natural or other gas transmission[inserted: ,] hazardous liquid[inserted: ,] [inserted: and carbon dioxide ]pipelines pose to the public, property, and the environment, and shall include requirements to resume operation. | |||
| (b)(2)(B) | (B) Inspection.— | (B) Inspection.— | ||
| The Secretary or an appropriate State agency shall inspect each idled pipeline and verify that the pipeline has been purged of combustibles and hazardous materials, if required under subsection (a). | The Secretary or an appropriate State agency shall inspect each idled pipeline and verify that the pipeline has been purged of combustibles and hazardous materials, if required under subsection (a). | |||
| (b)(2)(C) | (C) Requirements for reinspection.— | (C) Requirements for reinspection.— | ||
| The Secretary shall determine the requirements for periodic reinspection of idled natural or other gas transmission | The Secretary shall determine the requirements for periodic reinspection of idled natural or other gas transmission[inserted: ,] hazardous liquid[inserted: ,] [inserted: and carbon dioxide ]pipelines. | |||
| (b)(2)(D) | (D) Resumption of operations.— | (D) Resumption of operations.— | ||
| As a condition to allowing an idled pipeline to resume operations, the Secretary shall require that, prior to resuming operations, the pipeline shall be— | As a condition to allowing an idled pipeline to resume operations, the Secretary shall require that, prior to resuming operations, the pipeline shall be— | |||
| (b)(2)(D)(i) | (i) | (i) | ||
| inspected with— | inspected with— |
§ 60143(b)(2)Requirements.—(D)–(E)
(b)(2)(D)(i)(I)–(II) unchanged
| Where | Mark | The Code now | Mark | As the bill would leave it |
|---|---|---|---|---|
| (D)(i)(III) | (III) | (III) | ||
| if the use of hydrostatic pressure testing or an internal inspection device is not technologically feasible, another comparable technology or practice; and | if the use of hydrostatic pressure testing or an internal inspection device is not technologically feasible, another comparable technology or practice; and | |||
| (D)(ii) | (ii) | (ii) | ||
| in compliance with regulations promulgated under this chapter, including any regulations that became effective while the pipeline was idled. | in compliance with regulations promulgated under this chapter, including any regulations that became effective while the pipeline was idled. | |||
| (E) | (E) [inserted: Consideration.—] | |||
| [inserted: In promulgating regulations under this section, the Secretary shall consider the adoption of industry consensus standards.] | ||||