Title 33 · Navigation and Navigable Waters
Changes to 33 U.S.C. § 467f–2
H.R. 5414 · Dam Assessment and Mitigation Support Act · Introduced The text as a member of Congress first filed it. Most bills never get further than this.
DAMS Act
In committee · step 2 of 5
33 U.S.C. § 467f–2 Rehabilitation of high hazard potential dams
2 changes the bill asks for here, 2 carried out
- Carried out:
Section 8A(f) of the National Dam Safety Program Act (33 U.S.C. 467f–2(f)) is amended by inserting
, which system shall be used by any State that is not using a risk-based priority system developed by the State for identifying such dams
before the period at the end.
- Carried out:
Section 8A(j)(4) of the National Dam Safety Program Act (33 U.S.C. 467f–2(j)(4)) is amended by striking
2026
and inserting2031
.
§ 467f–2(e)–(g)
Start of § 467f–2 to (e)(3)(C) unchanged ·
(4) Plan criteria and technical support The Administrator, in consultation with the Board, shall provide criteria, and may provide technical support, for the development and implementation of floodplain management plans prepared under this subsection.
(f) Priority system The Administrator, in consultation with the Board, shall develop a risk-based priority system for use in identifying eligible high hazard potential dams for which grants may be made under this section[inserted: , which system shall be used by any State that is not using a risk-based priority system developed by the State for identifying such dams].
(g) Funding
(1) Cost sharing
(A) In general Except as provided in subparagraph (C), any assistance provided under this section for a project shall be subject to a non-Federal cost-sharing requirement of not less than 35 percent.
§ 467f–2(j)Authorization of appropriations(3)–(4)
(g)(1)(B)–(j)(2) unchanged ·
(3) $40,000,000 for fiscal year 2020; and
(4) $60,000,000 for each of fiscal years 2021 through [struck: 2026][inserted: 2031].