Title 42 · The Public Health and Welfare
Changes to 42 U.S.C. § 4019
H.R. 5484 · National Flood Insurance Program Reauthorization and Reform Act of 2025 · Introduced The text as a member of Congress first filed it. Most bills never get further than this.
In committee · step 2 of 5
42 U.S.C. § 4019 Payment of claims
11 changes the bill asks for here, 11 carried out
- Carried out:
in the subsection heading, by inserting
and cooperative
aftercondominium
; - Carried out:
by inserting
, or owners of a share of a cooperative building,
aftercondominium owners
; and - Carried out:
by inserting
or cooperative association
aftercondominium association
each place that term appears; and - Carried out:
by adding at the end the following:
(k) Definitions.— In this section, the terms “cooperative association” and “cooperative building” have the meanings given the terms by the Administrator..
- Carried out:
Section 1312 of the National Flood Insurance Act of 1968 (42 U.S.C. 4019), as amended by section 106(b), is amended by inserting after subsection (c) the following:
(d) Rebuttable presumption for foundation and structural damage.— (1) In general.— For the purposes of the Administrator determining coverage under the standard flood insurance policy under the national flood insurance program, a rebuttable presumption that physical damage to …
- Carried out:
Section 1312 of the National Flood Insurance Act of 1968 (42 U.S.C. 4019), as amended by section 401(a)(1), is amended by inserting after subsection (d) the following:
(e) Guidance on mold remediation.— (1) In general.— The Administrator shall issue guidance relating to the identification of reasonable actions that a policyholder of coverage for flood insurance made available under this title may take to inspect and maintain the property to …
- Carried out:
Section 1312 of the National Flood Insurance Act of 1968 (42 U.S.C. 4019), as amended by subsection (a), is amended by inserting after subsection (e) the following:
(f) Exclusion of certain damage.— For purposes of determining whether damage caused by mold, mildew, moisture, or water to a property shall be excluded from coverage under the standard flood insurance policy— (1) subject to paragraph (2), only the degree of damage caused by …
- Carried out:
Section 1312 of the National Flood Insurance Act of 1968 (42 U.S.C. 4019), as amended by section 403(c), is amended by inserting after subsection (f) the following:
(g) Use of technical assistance reports.— When adjusting claims for any damage to or loss of property that is covered by flood insurance made available under this title, the Administrator may rely upon technical assistance reports, as defined in section 1312A(a), only if the …
- Carried out:
Section 1312 of the National Flood Insurance Act of 1968 (42 U.S.C. 4019), as amended by section 406(a), is amended by inserting after subsection (g) the following:
(h) Deadline for approval of claims.— (1) In general.— The Administrator shall provide that, in the case of a claim for damage to or loss of property that is covered by a policy for flood insurance made available under this title— (A) except as provided in paragraph (2), not …
- Carried out:
Section 1312 of the National Flood Insurance Act of 1968 (42 U.S.C. 4019), as amended by section 408(a), is amended by inserting after subsection (h) the following:
(i) Final engineering reports.— (1) Definitions.— In this subsection— (A) the term “covered claim” means any claim for losses covered by a policy for flood insurance coverage made available under this title; and (B) the term “final engineering report” means an engineering …
- Carried out:
Section 1312 of the National Flood Insurance Act of 1968 (42 U.S.C. 4019), as amended by section 409, is amended by inserting after subsection (i) the following:
(j) No condition of payment of undisputed claim on proof of loss.— (1) In general.— Notwithstanding any other provision of law, or any term or condition of a standard flood insurance policy, the Administrator— (A) may not condition payment of an undisputed claim based on the …
§ 4019(b)–(k)
Start of § 4019 to (b)(2) unchanged ·
(A) $1,000, if the flood insurance coverage for such structure covers loss of, or physical damage to, such structure in an amount equal to or less than $100,000; and
(B) $1,250, if the flood insurance coverage for such structure covers loss of, or physical damage to, such structure in an amount greater than $100,000.
(c) Payment of claims to condominium [inserted: and cooperative ]owners The Administrator may not deny payment for any damage to or loss of property which is covered by flood insurance to condominium owners[inserted: ,] [inserted: or owners of a share of a cooperative building, ]who purchased such flood insurance separate and apart from the flood insurance purchased by the condominium association [inserted: or cooperative association ]in which such owner is a member, based solely, or in any part, on the flood insurance coverage of the condominium association or [inserted: cooperative association or ]others on the overall property owned by the condominium association[inserted: or cooperative association].
(d) [inserted: Rebuttable presumption for foundation and structural damage.—]
(1) [inserted: In general.—] [inserted: For the purposes of the Administrator determining coverage under the standard flood insurance policy under the national flood insurance program, a rebuttable presumption that physical damage to the foundation of, or structural damage to, a structure was not caused by earth movement shall apply if—]
(A) [inserted: flood caused direct physical change to the structure; and]
(B) [inserted: there is damage to the foundation of, or structural damage to, the structure that was not present before the flood, as demonstrated by a certification from the policyholder.]
(2) [inserted: Rebuttal.—] [inserted: In determining coverage as a result of the rebuttable presumption under paragraph (1), an insurance company may rebut the presumption only by providing the Administrator with an engineering report that—]
(A) [inserted: meets standards issued by the Administrator under paragraph (3); and]
(B) [inserted: clearly demonstrates that the physical damage to the foundation of, or structural damage to, a structure described in paragraph (1) was caused directly by earth movement that was not—]
(i) [inserted: caused by the horizontal pressure from standing or slow-moving floodwater (commonly known as “hydrostatic pressure”);]
(ii) [inserted: caused by the force of floodwater that causes the vertical uplift from the underside of a horizontal foundation component, such as a concrete slab, footer, or structural floor assembly (commonly known as “buoyancy”);]
(iii) [inserted: caused by pressure imposed on an object, such as a wall of a building, by high-velocity floodwater or waves flowing against and around the building (commonly known as “hydrodynamic force”);]
(iv) [inserted: caused by floodwater moving along the surface of the ground causing soil to suddenly erode or undermine, resulting in failure of a foundation or to one of the structural components of the foundation (commonly known as “scouring”); or]
(v) [inserted: otherwise caused by flood.]
(3) [inserted: Minimum standards for engineering reports.—] [inserted: The Administrator shall issue minimum standards—]
(A) [inserted: regarding the form and content of engineering reports used to assist insurance claims adjusters with respect to carrying out this subsection; and]
(B) [inserted: that—]
(i) [inserted: include a requirement that any such engineering report shall be signed and have a seal affixed by an engineer who is licensed in the State in which the property to which the claim relates is located; and]
(ii) [inserted: are consistent with generally accepted practices in—]
(I) [inserted: the field of forensic engineering; and]
(II) [inserted: the insurance industry.]
(4) [inserted: Documentation of condition of foundation.—]
(A) [inserted: In general.—] [inserted: If the holder of a policy for flood insurance coverage made available under this title documents the condition of the foundation of a structure covered by the policy with a photograph, video recording, or otherwise, and submits the documentation to the Administrator or the Write Your Own Company that sold the policy, as applicable, the Administrator or Write Your Own Company, respectively, shall keep the documentation and use the documentation when adjusting a claim that arises under the policy.]
(B) [inserted: Notice to policyholders.—] [inserted: The Administrator shall notify a policyholder, when the policyholder purchases or renews a flood insurance policy sold under this title, that the policyholder may document the condition of the foundation of a structure covered by the policy in accordance with subparagraph (A).]
(5) [inserted: Rule of construction.—] [inserted: Nothing in this subsection may be construed to modify the terms and conditions of the standard flood insurance policy.]
(e) [inserted: Guidance on mold remediation.—]
(1) [inserted: In general.—] [inserted: The Administrator shall issue guidance relating to the identification of reasonable actions that a policyholder of coverage for flood insurance made available under this title may take to inspect and maintain the property to which that coverage applies—]
(A) [inserted: after a flood recedes; and]
(B) [inserted: in order to avoid damage to the property that is caused by mold, mildew, moisture, or water.]
(2) [inserted: Considerations.—] [inserted: In developing guidance under paragraph (1), the Administrator shall consider—]
(A) [inserted: any applicable laws and regulations;]
(B) [inserted: the terms and conditions of the standard flood insurance policy;]
(C) [inserted: technical best practices;]
(D) [inserted: the costs of remediation in relation to the condition of a property described in that paragraph; and]
(E) [inserted: the actions that the Administrator may reasonably expect a policyholder described in that paragraph to take, given the likely challenges faced by the policyholder after a flood.]
(3) [inserted: Regular review.—] [inserted: The Administrator shall—]
(A) [inserted: regularly review the guidance issued under paragraph (1); and]
(B) [inserted: revise the guidance issued under paragraph (1) as the Administrator determines appropriate.]
(4) [inserted: Annual distribution.—] [inserted: The Administrator shall provide a copy of the guidance issued under paragraph (1) to a policyholder at the time of the purchase or renewal of a flood insurance policy sold under this title.]
(f) [inserted: Exclusion of certain damage.—] [inserted: For purposes of determining whether damage caused by mold, mildew, moisture, or water to a property shall be excluded from coverage under the standard flood insurance policy—]
(1) [inserted: subject to paragraph (2), only the degree of damage caused by mold, mildew, moisture, or water that could have been avoided through inspection and maintenance may be excluded from that coverage; and]
(2) [inserted: the condition of the property to which the damage relates may not be considered to be attributable to the policyholder with respect to the property, including any failure by the policyholder to inspect and maintain the property after a flood recedes, if—]
(A) [inserted: the policyholder was denied access to the property after the flood receded because of—]
(i) [inserted: a lawful government order;]
(ii) [inserted: a determination by local authorities that the property—]
(I) [inserted: is unsafe or unstable; or]
(II) [inserted: shall be condemned; or]
(iii) [inserted: otherwise unsafe conditions;]
(B) [inserted: a reasonable individual exercising reasonable judgment could not be expected to inspect, maintain, or mitigate the damage to the property under the circumstances; or]
(C) [inserted: the policyholder faced particular challenges, including—]
(i) [inserted: practical or financial difficulty in inspecting or maintaining the property;]
(ii) [inserted: the need to address other more immediate priorities, including—]
(I) [inserted: the health and well-being of the policyholder and the family of the policyholder;]
(II) [inserted: the preservation of basic items;]
(III) [inserted: displacement; and]
(IV) [inserted: other issues that make inspection and maintenance of the property a near-term challenge for the policyholder; and]
(iii) [inserted: the unavailability of contractors or other individuals to perform any required inspection and maintenance.]
(g) [inserted: Use of technical assistance reports.—] [inserted: When adjusting claims for any damage to or loss of property that is covered by flood insurance made available under this title, the Administrator may rely upon technical assistance reports, as defined in section 1312A(a), only if the reports are final and are prepared in compliance with applicable State and Federal laws regarding professional licensure and conduct.]
(h) [inserted: Deadline for approval of claims.—]
(1) [inserted: In general.—] [inserted: The Administrator shall provide that, in the case of a claim for damage to or loss of property that is covered by a policy for flood insurance made available under this title—]
(A) [inserted: except as provided in paragraph (2), not later than 60 days after the date on which a proof of loss or comparable submission is provided to the Administrator—]
(i) [inserted: an initial determination regarding approval of the claim for payment or disapproval of the claim shall be made; and]
(ii) [inserted: notification of the determination described in clause (i) shall be provided to the policyholder making the claim; and]
(B) [inserted: payment of an approved claim shall be made as soon as possible after that approval.]
(2) [inserted: Extension of deadline.—] [inserted: The Administrator shall—]
(A) [inserted: provide that the period described in paragraph (1)(A) may be extended by an additional period of 30 days under extraordinary circumstances; and]
(B) [inserted: by regulation—]
(i) [inserted: establish criteria for—]
(I) [inserted: demonstrating the extraordinary circumstances described in subparagraph (A); and]
(II) [inserted: determining to which claims the extraordinary circumstances described in subparagraph (A) apply; and]
(ii) [inserted: provide that, if the deadline imposed under paragraph (1)(A), as extended under subparagraph (A), if applicable, is not satisfied the amount of the claim to which the deadline relates shall be increased with interest, which shall begin accruing on the date on which the initial claim is filed.]
(3) [inserted: Deadline tolled during certain communication with policyholder.—] [inserted: The deadline under paragraph (1) shall be tolled during any period during which the Administrator or a Write Your Own Company is trying to obtain more information from a policyholder regarding a claim made by the policyholder, or is otherwise working with a policyholder to develop such a claim.]
(i) [inserted: Final engineering reports.—]
(1) [inserted: Definitions.—] [inserted: In this subsection—]
(A) [inserted: the term “covered claim” means any claim for losses covered by a policy for flood insurance coverage made available under this title; and]
(B) [inserted: the term “final engineering report” means an engineering report, survey, or other document in connection with a covered claim that—]
(i) [inserted: is based on an on-site inspection;]
(ii) [inserted: contains final conclusions with respect to an engineering issue or issues involved in the claim; and]
(iii) [inserted: is signed by the responsible in charge or affixed with the seal of the responsible in charge, or both.]
(2) [inserted: Prohibition on manipulation and transmission to third parties.—] [inserted: The Administrator shall require that, in the case of any on-site inspection of a property by an engineer for the purpose of assessing any covered claim, the final engineering report—]
(A) [inserted: may not—]
(i) [inserted: include alterations by, or at the request of, anyone other than the person responsible for the report; or]
(ii) [inserted: be transmitted to any other person before the final engineering report is transmitted to the policyholder who submitted the covered claim; and]
(B) [inserted: shall include a certification, signed by the person responsible for the final engineering report, that the final engineering report does not contain any alterations described in subparagraph (A).]
(j) [inserted: No condition of payment of undisputed claim on proof of loss.—]
(1) [inserted: In general.—] [inserted: Notwithstanding any other provision of law, or any term or condition of a standard flood insurance policy, the Administrator—]
(A) [inserted: may not condition payment of an undisputed claim based on the submission of a proof of loss; and]
(B) [inserted: may instead accept a report submitted by the insurance adjuster the Administrator hires to investigate the claim, if the report is signed by the policyholder, unless the Administrator determines that conditions make signature impracticable.]
(2) [inserted: Refusal to accept amount paid.—] [inserted: Upon the refusal of a policyholder to accept the amount paid under paragraph (1), the Administrator may require the policyholder to submit a proof of loss within a timeframe determined by the Administrator.]
(k) [inserted: Definitions.—] [inserted: In this section, the terms “cooperative association” and “cooperative building” have the meanings given the terms by the Administrator.]