Changes to the Code
H.R. 5549 · Efficient Nuclear Licensing Hearings Act · Referred The text sent to a committee of the other chamber after one chamber passed it.
Passed the House · step 3 of 5
42 U.S.C. § 2239 Hearings and judicial review
5 changes the bill asks for here, 3 carried out
- Not carried out:
by striking In any proceeding under this Act and inserting the following:(i) In any proceeding under this Act; and
The bill turns “In any proceeding under this Act” into a provision of its own, but in § 2239(a)(1)(A) the text doesn't begin with those words. The law may have changed since the bill was drafted.
Technical detail
“In any proceeding under this Act” does not open the text of /us/usc/t42/s2239/a/1/A - Not carried out:
in clause (i) (as so designated), by striking The Commission shall hold a hearing and all that follows through upon a determination by the Commission that the amendment involves no significant hazards consideration. and inserting the following:
(ii) The Commission may, in the absence of a request for a hearing by any person whose interest may be affected, issue a construction permit, an operating license, a combined construction permit and operating license, an amendment to a construction permit, an amendment to an …
We can't read how this instruction is worded yet, so it isn't shown in the text.
Technical detail
no-pattern: striking QTEXT and all that follows through QTEXT and inserting the following: QCONTENT; - Carried out:
by inserting
informal
beforehearing procedures
; and - Carried out:
by striking
, whether informal or formal adjudicatory,
; and - Carried out:
in the second sentence of paragraph (2)(A), by striking
required hearing
and insertinghearing held by the Commission under this section
.
§ 2239(a)(1)–(2)
Start of § 2239 to (a)(1)(B)(ii) unchanged
| Where | Mark | Text |
|---|---|---|
| (1)(B)(iii) | (iii) | |
| After receiving a request for a hearing under clause (i), the Commission expeditiously shall either deny or grant the request. If the request is granted, the Commission shall determine, after considering petitioners’ prima facie showing and any answers thereto, whether during a period of interim operation, there will be reasonable assurance of adequate protection of the public health and safety. If the Commission determines that there is such reasonable assurance, it shall allow operation during an interim period under the combined license. | ||
| (1)(B)(iv) | (iv) | |
| The Commission, in its discretion, shall determine appropriate hearing procedures | ||
| The Commission, in its discretion, shall determine appropriate [inserted: informal ]hearing procedures for any hearing under clause (i), and shall state its reasons therefor. | ||
| (1)(B)(v) | (v) | |
| The Commission shall, to the maximum possible extent, render a decision on issues raised by the hearing request within 180 days of the publication of the notice provided by clause (i) or the anticipated date for initial loading of fuel into the reactor, whichever is later. Commencement of operation under a combined license is not subject to subparagraph (A). | ||
| (2) | (2) | |
| (2)(A) | (A) | |
| The Commission may issue and make immediately effective any amendment to an operating license or any amendment to a combined construction and operating license, upon a determination by the Commission that such amendment involves no significant hazards consideration, notwithstanding the pendency before the Commission of a request for a hearing from any person. Such amendment may be issued and made immediately effective in advance of the holding and completion of any | ||
| The Commission may issue and make immediately effective any amendment to an operating license or any amendment to a combined construction and operating license, upon a determination by the Commission that such amendment involves no significant hazards consideration, notwithstanding the pendency before the Commission of a request for a hearing from any person. Such amendment may be issued and made immediately effective in advance of the holding and completion of any hearing[inserted: held by the Commission under this section]. In determining under this section whether such amendment involves no significant hazards consideration, the Commission shall consult with the State in which the facility involved is located. In all other respects such amendment shall meet the requirements of this chapter. | ||
| (2)(B) | (B) | |
| The Commission shall periodically (but not less frequently than once every thirty days) publish notice of any amendments issued, or proposed to be issued, as provided in subparagraph (A). Each such notice shall include all amendments issued, or proposed to be issued, since the date of publication of the last such periodic notice. Such notice shall, with respect to each amendment or proposed amendment (i) identify the facility involved; and (ii) provide a brief description of such amendment. Nothing in this subsection shall be construed to delay the effective date of any amendment. | ||
| (2)(C) | (C) | |
| The Commission shall, during the ninety-day period following the effective date of this paragraph, promulgate regulations establishing (i) standards for determining whether any amendment to an operating license or any amendment to a combined construction and operating license involves no significant hazards consideration; (ii) criteria for providing or, in emergency situations, dispensing with prior notice and reasonable opportunity for public comment on any such determination, which criteria shall take into account the exigency of the need for the amendment involved; and (iii) procedures for consultation on any such determination with the State in which the facility involved is located. |
Rest of § 2239 unchanged
42 U.S.C. § 2243 Licensing of uranium enrichment facilities
3 changes the bill asks for here, 2 carried out
- Carried out:
by striking
on the record
; and - Not carried out:
by inserting
if a person whose interest may be affected by such construction and operation has requested a hearing regarding the licensing of the construction and operation of the facility
afterand 63
; and“and 63” isn't in § 2243(b)(1) in the Code as we have it. The law may have changed since the bill was drafted.
Technical detail
“and 63” not found in /us/usc/t42/s2243/b/1 - Carried out:
in paragraph (2), by striking
Such hearing
and insertingIf a hearing is held under paragraph (1), the hearing
.
§ 2243(a)–(c)
Start of § 2243 to (a)(1) unchanged
| Where | Mark | Text |
|---|---|---|
| (a)(2) | (2) Timing | |
| An environmental impact statement prepared under paragraph (1) shall be prepared before the hearing on the issuance of a license for the construction and operation of a uranium enrichment facility is completed. | ||
| (b) | (b) Adjudicatory hearing | |
| (b)(1) | (1) In general | |
| The Commission shall conduct a single adjudicatory hearing | ||
| The Commission shall conduct a single adjudicatory hearing with regard to the licensing of the construction and operation of a uranium enrichment facility under sections 2073 and 2093 of this title. | ||
| (b)(2) | (2) Timing | |
| [inserted: If] [inserted: a ]hearing [inserted: is held under paragraph (1), the hearing ]shall be completed and a decision issued before the issuance of a license for such construction and operation. | ||
| (b)(3) | (3) Single proceeding | |
| No further Commission licensing action shall be required to authorize operation. | ||
| (c) | (c) Inspection and operation | |
| Prior to commencement of operation of a uranium enrichment facility licensed hereunder, the Commission shall verify through inspection that the facility has been constructed in accordance with the requirements of the license for construction and operation. The Commission shall publish notice of the inspection results in the Federal Register. |
Rest of § 2243 unchanged
42 U.S.C. § 2235 Construction permits and operating licenses
The bill's words for this section
- Not carried out:
Section 185 b. of the Atomic Energy Act of 1954 (42 U.S.C. 2235(b)) is amended by striking
After holding a public hearing under section 189 a. (1)(A),
and insertingAfter the thirty days notice and publication period or holding a hearing, as applicable, under section 189 a. (1)(A),
.“After holding a public hearing under section 189 a. (1)(A),” isn't in § 2235(b) in the Code as we have it. The law may have changed since the bill was drafted.
Technical detail
“After holding a public hearing under section 189 a. (1)(A),” not found in /us/usc/t42/s2235/b