Changes to Geothermal Steam Act of 1970 § 30

H.R. 5576 · Enhancing Geothermal Production on Federal Lands Act ·

Reported by committee · step 2 of 5

Sections are cited like “7 U.S.C. § 2012”: 7 of the , 2012.

Geothermal Steam Act of 1970 § 30 Geothermal exploration projects New section

+29 −0Shown
More for Geothermal Steam Act of 1970 § 30
Every bill that would add § 30
1 change the bill asks for here, 1 carried out
  1. Carried out:

    The Geothermal Steam Act of 1970 (30 U.S.C. 1001 et seq.) is amended by adding at the end the following:30. Geothermal exploration projects (a) Definitions.— In this section: (1) Geothermal exploration project.— The term geothermal exploration project means the drilling of a temperature gradient well, monitoring well, calibration well, or another geothermal exploratory well, including construction or making improvements for such activities, on lands for which the Secretary has issued a geothermal lease— (A) that is carried out by the holder of the lease; (B) for which— (i) the last cemented casing string has an outer diameter of less than 133/8 inches; and (ii) the total unreclaimed surface disturbance at any one time within the project area is less than 8 acres, not including the area of a permanent or temporary access road; (C) that is completed in less than 180 days, including the removal of any surface infrastructure from the project area; and (D) that requires the restoration of the project area within 3 years of the date of first exploration drilling to approximately the condition that existed at the time the project began, unless the project area is subsequently used as part of energy development under the lease. (2) Covered activity.— The term covered activity includes, with respect to exploration, development, or production (including direct use) of geothermal resources— (A) geotechnical investigations; (B) off-road travel in a right-of-way established by Congress, granted by a Federal agency, or included in a land use plan; and (C) construction, maintenance, realignment, and repair of an existing permanent or temporary access road within a right-of-way established by Congress, granted by a Federal agency, or included in a land use plan. (b) Non-Major Federal action.— Geothermal exploration projects and covered activities shall not be considered major Federal actions under section 102(2)(C) of the National Environmental Policy Act of 1969 (42 U.S.C. 4332(2)(C)). (c) Requirement To provide notice.— The holder of a geothermal lease shall provide to the Secretary notice of their intent to carry out a geothermal exploration project at least 30 days before the start of drilling under the project..

§ 30(a)–(c)

§ 30. [inserted: Geothermal exploration projects]

(a) [inserted: Definitions.—] [inserted: In this section:]

(1) [inserted: Geothermal exploration project.—] [inserted: The term “geothermal exploration project” means the drilling of a temperature gradient well, monitoring well, calibration well, or another geothermal exploratory well, including construction or making improvements for such activities, on lands for which the Secretary has issued a geothermal lease—]

(A) [inserted: that is carried out by the holder of the lease;]

(B) [inserted: for which—]

(i) [inserted: the last cemented casing string has an outer diameter of less than 133/8 inches; and]

(ii) [inserted: the total unreclaimed surface disturbance at any one time within the project area is less than 8 acres, not including the area of a permanent or temporary access road;]

(C) [inserted: that is completed in less than 180 days, including the removal of any surface infrastructure from the project area; and]

(D) [inserted: that requires the restoration of the project area within 3 years of the date of first exploration drilling to approximately the condition that existed at the time the project began, unless the project area is subsequently used as part of energy development under the lease.]

(2) [inserted: Covered activity.—] [inserted: The term “covered activity” includes, with respect to exploration, development, or production (including direct use) of geothermal resources—]

(A) [inserted: geotechnical investigations;]

(B) [inserted: off-road travel in a right-of-way established by Congress, granted by a Federal agency, or included in a land use plan; and]

(C) [inserted: construction, maintenance, realignment, and repair of an existing permanent or temporary access road within a right-of-way established by Congress, granted by a Federal agency, or included in a land use plan.]

(b) [inserted: Non-Major Federal action.—] [inserted: Geothermal exploration projects and covered activities shall not be considered major Federal actions under section 102(2)(C) of the National Environmental Policy Act of 1969 (42 U.S.C. 4332(2)(C)).]

(c) [inserted: Requirement To provide notice.—] [inserted: The holder of a geothermal lease shall provide to the Secretary notice of their intent to carry out a geothermal exploration project at least 30 days before the start of drilling under the project.]