H.R. 5711
Metropolitan Planning Enhancement Act
The bill's own words, as Congress.gov publishes them, without its long title and table of contents.
Sec. 1. Short title This Act may be cited as the Metropolitan Planning Enhancement Act.
Sec. 2. Metropolitan transportation planning
(a) Development of transportation plan Section 134(i) of title 23, United States Code, is amended—
(1) by redesignating paragraphs (7) and (8) as paragraphs (8) and (9); and
(2) by inserting after paragraph (6) the following:
(7) Project selection transparency and accountability.— Projects included in the adopted transportation plan shall be selected through a publicly available transparent process that includes use of criteria that directly support factors in subsection (h), the national transportation goals under section 150(b), and applicable State transportation goals. The criteria shall be used to publicly categorize the highest performing projects.
.
(b) Metropolitan tip Section 134(j)(2)(A) of title 23, United States Code is amended by adding after the period at the end the following:
Projects included in the priority list shall come from the highest performing category of projects identified in the transportation plan under subsection (i)(7). If a lower-categorized project is included in the priority project list, a public description shall be included to explain why the lower-categorized project is included before a higher-categorized project, including geographic balance and projects in economically distressed areas.
.
Sec. 3. Statewide and nonmetropolitan transportation planning
(a) Long-Range statewide transportation plan Section 135(f) of title 23, United States Code, is amended—
(1) by redesignating paragraph (9) as paragraph (10); and
(2) by inserting after paragraph (8) the following:
(9) Project selection transparency and accountability.— Projects included in the adopted long-range statewide transportation plan shall be selected through a publicly available transparent process that includes use of criteria that directly support factors in subsection (d), the national transportation goals under section 150(b), and applicable State transportation goals. The criteria shall be used to publicly categorize the highest performing projects.
.
(b) Statewide transportation improvement plan Section 135(g)(5)(A) of title 23, United States Code is amended by adding after the period at the end the following:
Projects included in the transportation improvement program shall come from the highest performing category of projects identified in the transportation plan under subsection (f)(9). If a lower-categorized project is included in the priority project list, a public description shall be included to explain why the lower-categorized project is included before a higher-categorized project, including geographic balance and projects in economically distressed areas.
.
Sec. 4. Metropolitan transportation planning
(a) Development of transportation plan Section 5303(i) of chapter 53 of title 49, United States Code, is amended—
We couldn't place this change in the Code: we can't yet read how this change is worded.
(1) by redesignating paragraphs (7) and (8) as paragraphs (8) and (9); and
We couldn't place this change in the Code: it changes a law that isn't arranged into the US Code, or doesn't say where in the Code.
(2) by inserting after paragraph (6) the following:
(7) Project selection transparency and accountability.— Projects included in the adopted transportation plan shall be selected through a publicly available transparent process that includes use of criteria that directly support factors in subsection (h), the national transportation goals under section 150(b), and applicable State transportation goals. The criteria shall be used to publicly categorize the highest performing projects.
.
We couldn't place this change in the Code: it changes a law that isn't arranged into the US Code, or doesn't say where in the Code.
(b) Metropolitan tip Section 5303(j)(2)(A) of chapter 53 of title 49, United States Code is amended by adding after the period at the end the following:
Projects included in the priority list shall come from the highest performing category of projects identified in the transportation plan under subsection (i)(7). If a lower-categorized project is included in the priority project list, a public description shall be included to explain why the lower-categorized project is included before a higher-categorized project, including geographic balance and projects in economically distressed areas.
.
We couldn't place this change in the Code: we can't yet read how this change is worded.
Sec. 5. Statewide and nonmetropolitan transportation planning
(a) Long-Range statewide transportation plan Section 5304(f) of chapter 53 of title 49, United States Code, is amended—
We couldn't place this change in the Code: we can't yet read how this change is worded.
(1) by redesignating paragraph (9) as paragraph (10); and
We couldn't place this change in the Code: it changes a law that isn't arranged into the US Code, or doesn't say where in the Code.
(2) by inserting after paragraph (8) the following:
(9) Project selection transparency and accountability.— Projects included in the adopted long-range statewide transportation plan shall be selected through a publicly available transparent process that includes use of criteria that directly support factors in subsection (d), the national transportation goals under section 150(b), and applicable State transportation goals. The criteria shall be used to publicly categorize the highest performing projects.
.
We couldn't place this change in the Code: it changes a law that isn't arranged into the US Code, or doesn't say where in the Code.
(b) Statewide transportation improvement plan Section 5304(g)(5)(A) of chapter 53 of title 49, United States Code, is amended by adding after the period at the end the following:
Projects included in the statewide transportation improvement program shall come from the highest performing category of projects identified in the transportation plan under subsection (f)(9). If a lower-categorized project is included in the priority project list, a public description shall be included to explain why the lower-categorized project is included before a higher-categorized project, including geographic balance and projects in economically distresses areas.
.
We couldn't place this change in the Code: we can't yet read how this change is worded.