In committee · step 2 of 5

Sections are cited like “7 U.S.C. § 2012”: 7 of the , 2012.

33 U.S.C. § 3901 Definitions

+34 −204 of 5 shown
More for 33 U.S.C. § 3901
Read § 3901Only this section
5 changes the bill asks for here, 4 carried out
  1. Carried out:

    by redesignating paragraphs (11) through (15) as paragraphs (13) through (17), respectively;

  2. Carried out:

    by redesignating paragraph (10) as paragraph (11);

  3. Carried out:

    by inserting after paragraph (9) the following:(10) Rural water project.— The term “rural water project” includes— (A) a rural water supply project authorized under the Reclamation Rural Water Supply Act of 2006 (43 U.S.C. 2401); (B) any project authorized under part III of subtitle A of title X of the Omnibus Public Land …

  4. Carried out:

    by inserting after paragraph (11), as so redesignated, the following:(12) Small community.— The term “small community” means a city, town, or unincorporated area that has a population of not more than 25,000 inhabitants..

  5. Not carried out:

    in section 5022(12), by striking et. and inserting et.

    “et.” isn't in § 3901(12) in the Code as we have it. The law may have changed since the bill was drafted.

    Technical detail“et.” not found in /us/usc/t33/s3901/12

§ 3901(8)–(17)

Start of § 3901 to (8)(A) unchanged

WhereMarkThe Code nowMarkAs the bill would leave it
(8)(B)(B) Exclusion(B) Exclusion
The term “project obligation” does not include a Federal credit instrument.The term “project obligation” does not include a Federal credit instrument.
(9)(9) Rating agency(9) Rating agency
The term “rating agency” means a credit rating agency registered with the Securities and Exchange Commission as a nationally recognized statistical rating organization (as defined in section 78c(a) of title 15).The term “rating agency” means a credit rating agency registered with the Securities and Exchange Commission as a nationally recognized statistical rating organization (as defined in section 78c(a) of title 15).
(10)(10) [inserted: Rural water project.—]
[inserted: The term “rural water project” includes—]
(10)(A)(A) [inserted: ]
[inserted: a rural water supply project authorized under the Reclamation Rural Water Supply Act of 2006 (43 U.S.C. 2401);]
(10)(B)(B) [inserted: ]
[inserted: any project authorized under part III of subtitle A of title X of the Omnibus Public Land Management Act of 2009 (Public Law 111–11), for a federally recognized Indian Tribe; and]
(10)(C)(C) [inserted: ]
[inserted: any rural water project or rural water supply project authorized under—]
(10)(C)(i)(i) [inserted: ]
[inserted: section 1110 of title XI of division FF of the Consolidated Appropriations Act, 2021 (Public Law 116–260); or]
(10)(C)(ii)(ii) [inserted: ]
[inserted: any other Federal law.]
(11)[struck: (10)] Secured loan[inserted: (11)] Secured loan
The term “secured loan” means a direct loan or other debt obligation issued by an obligor and funded by the Secretary or Administrator, as applicable, in connection with the financing of a project under section 3908 of this title.The term “secured loan” means a direct loan or other debt obligation issued by an obligor and funded by the Secretary or Administrator, as applicable, in connection with the financing of a project under section 3908 of this title.
(12)(12) [inserted: Small community.—]
[inserted: The term “small community” means a city, town, or unincorporated area that has a population of not more than 25,000 inhabitants.]
(13)[struck: (11)] State[inserted: (13)] State
The term “State” means—The term “State” means—
(13)(A)(A) (A)
a State;a State;
(13)(B)(B) (B)
the District of Columbia;the District of Columbia;
(13)(C)(C) (C)
the Commonwealth of Puerto Rico; andthe Commonwealth of Puerto Rico; and
(13)(D)(D) (D)
any other territory or possession of the United States.any other territory or possession of the United States.
(14)[struck: (12)] State infrastructure financing authority[inserted: (14)] State infrastructure financing authority
The term “State infrastructure financing authority” means the State entity established or designated by the Governor of a State to receive a capitalization grant provided by, or otherwise carry out the requirements of, title VI of the Federal Water Pollution Control Act (33 U.S.C. 1381 et.1 seq.) or section 300j–12 of title 42.The term “State infrastructure financing authority” means the State entity established or designated by the Governor of a State to receive a capitalization grant provided by, or otherwise carry out the requirements of, title VI of the Federal Water Pollution Control Act (33 U.S.C. 1381 et.1 seq.) or section 300j–12 of title 42.
(15)[struck: (13)] Subsidy amount[inserted: (15)] Subsidy amount
The term “subsidy amount” means the amount of budget authority sufficient to cover the estimated long-term cost to the Federal Government of a Federal credit instrument, as calculated on a net present value basis, excluding administrative costs and any incidental effects on governmental receipts or outlays in accordance with the Federal Credit Reform Act of 1990 (2 U.S.C. 661 et seq.).The term “subsidy amount” means the amount of budget authority sufficient to cover the estimated long-term cost to the Federal Government of a Federal credit instrument, as calculated on a net present value basis, excluding administrative costs and any incidental effects on governmental receipts or outlays in accordance with the Federal Credit Reform Act of 1990 (2 U.S.C. 661 et seq.).
(16)[struck: (14)] Substantial completion[inserted: (16)] Substantial completion
The term “substantial completion”, with respect to a project, means the earliest date on which a project is considered to perform the functions for which the project is designed.The term “substantial completion”, with respect to a project, means the earliest date on which a project is considered to perform the functions for which the project is designed.
(17)[struck: (15)] Treatment works[inserted: (17)] Treatment works
The term “treatment works” has the meaning given the term in section 212 of the Federal Water Pollution Control Act (33 U.S.C. 1292).The term “treatment works” has the meaning given the term in section 212 of the Federal Water Pollution Control Act (33 U.S.C. 1292).

33 U.S.C. § 3902 Authority to provide assistance

+6 −1Shown
More for 33 U.S.C. § 3902
Read § 3902Only this section
2 changes the bill asks for here, 2 carried out
  1. Carried out:

    Section 5023 of the Water Resources Reform and Development Act of 2014 (33 U.S.C. 3902) is amended by adding at the end the following:(c) Technical assistance to small communities.— (1) In general.— The Administrator may provide technical assistance to small communities to aid such communities in developing a proposal for an eligible project and seeking assistance under this subtitle to carry out such project. …

  2. Carried out:

    in section 5023(b)(3) (33 U.S.C. 3902(b)(3)), by striking under paragraph (8) or (10) and inserting under paragraphs (8), (10), (11), (12), or (13); and

§ 3902(b)–(c)

Start of § 3902 to (b)(1) unchanged

WhereMarkThe Code nowMarkAs the bill would leave it
(b)(2)(2) Administrator(2) Administrator
The Administrator shall provide financial assistance to carry out all projects under this chapter that are eligible projects under paragraphs (2), (3), (4), (5), (6), (7), and (9) of section 3905 of this title.The Administrator shall provide financial assistance to carry out all projects under this chapter that are eligible projects under paragraphs (2), (3), (4), (5), (6), (7), and (9) of section 3905 of this title.
(b)(3)(3) Other projects(3) Other projects
The Secretary or the Administrator, as applicable, may carry out eligible projects under [struck: paragraph] (8) or ([struck: 10]) of section 3905 of this title.The Secretary or the Administrator, as applicable, may carry out eligible projects under [inserted: paragraphs] (8)[inserted: ,] [inserted: (10), (11), (12), ]or ([inserted: 13]) of section 3905 of this title.
(c)(c) [inserted: Technical assistance to small communities.—]
(c)(1)(1) [inserted: In general.—]
[inserted: The Administrator may provide technical assistance to small communities to aid such communities in developing a proposal for an eligible project and seeking assistance under this subtitle to carry out such project.]
(c)(2)(2) [inserted: Types of assistance.—]
[inserted: Assistance under paragraph (1) may be in the form of engineering and financial planning assistance.]

33 U.S.C. § 3905 Projects eligible for assistance

+7 −1Shown
More for 33 U.S.C. § 3905
Read § 3905Only this section
2 changes the bill asks for here, 2 carried out
  1. Carried out:

    in paragraph (10), by striking or (8) and inserting (8), (11), (12), or (13); and

  2. Carried out:

    by adding at the end the following:(11) A State-led storage project (as such term is defined in section 4007(a) of the Water Infrastructure Improvements for the Nation Act (43 U.S.C. 390b note)). (12) Transferred works (as such term is defined in section 9601 of the Omnibus Public Land Management Act of 2009 (43 …

§ 3905(9)–(13)

Start of § 3905 to (8)(B) unchanged

WhereMarkThe Code nowMarkAs the bill would leave it
(9)(9) (9)
A combination of projects, each of which is eligible under paragraph (2) or (3), for which a State infrastructure financing authority submits to the Administrator a single application.A combination of projects, each of which is eligible under paragraph (2) or (3), for which a State infrastructure financing authority submits to the Administrator a single application.
(10)(10) (10)
A combination of projects secured by a common security pledge, each of which is eligible under paragraph (1), (2), (3), (4), (5), (6), (7), or ([struck: 8]), for which an eligible entity, or a combination of eligible entities, submits a single application.A combination of projects secured by a common security pledge, each of which is eligible under paragraph (1), (2), (3), (4), (5), (6), (7), [inserted: (8), (11), (12), ]or ([inserted: 13]), for which an eligible entity, or a combination of eligible entities, submits a single application.
(11)(11) [inserted: ]
[inserted: A State-led storage project (as such term is defined in section 4007(a) of the Water Infrastructure Improvements for the Nation Act (43 U.S.C. 390b note)).]
(12)(12) [inserted: ]
[inserted: Transferred works (as such term is defined in section 9601 of the Omnibus Public Land Management Act of 2009 (43 U.S.C. 510)).]
(13)(13) [inserted: ]
[inserted: A congressionally authorized water resources development project that is owned or operated by a non-Federal entity.]

33 U.S.C. § 3907 Determination of eligibility and project selection

+14 −3Shown
More for 33 U.S.C. § 3907
Read § 3907Only this section
4 changes the bill asks for here, 4 carried out
  1. Carried out:

    Section 5028(a)(2)(B) of the Water Resources Reform and Development Act of 2014 (33 U.S.C. 3907(a)(2)(B)) is amended by striking $5,000,000 and inserting $1,000,000.

  2. Carried out:

    Section 5028(a)(2)(B) of the Water Resources Reform and Development Act of 2014 (33 U.S.C. 3907(a)(2)(B)) is further amended by striking a community of not more than 25,000 individuals and inserting a small community.

  3. Carried out:

    by redesignating subsection (c) as subsection (d); and

  4. Carried out:

    by inserting after subsection (b) the following:(c) Collaborative project delivery methods.— (1) Authorization.— The Secretary or the Administrator, as applicable, may select, in accordance with this section, a project to be carried out using a collaborative project delivery method (consistent with any applicable State or …

§ 3907(a)Eligibility requirements(2)–(4)

Start of § 3907 to (a)(2) unchanged

WhereMarkThe Code nowMarkAs the bill would leave it
(2)(A)(A) In general(A) In general
Subject to subparagraph (B), the eligible project costs of a project shall be reasonably anticipated to be not less than $20,000,000.Subject to subparagraph (B), the eligible project costs of a project shall be reasonably anticipated to be not less than $20,000,000.
(2)(B)(B) Small community water infrastructure projects(B) Small community water infrastructure projects
For a project described in paragraph (2) or (3) of section 3905 of this title that serves a [struck: community] [struck: of not more than 25],[struck: 000] [struck: individuals, ]the eligible project costs of a project shall be reasonably anticipated to be not less than $[struck: 5],000,000.For a project described in paragraph (2) or (3) of section 3905 of this title that serves a [inserted: small] [inserted: community], the eligible project costs of a project shall be reasonably anticipated to be not less than $[inserted: 1],000,000.
(3)(3) Dedicated revenue sources(3) Dedicated revenue sources
The Federal credit instrument for the project shall be repayable, in whole or in part, from dedicated revenue sources that also secure the project obligations.The Federal credit instrument for the project shall be repayable, in whole or in part, from dedicated revenue sources that also secure the project obligations.
(4)(4) Public sponsorship of private entities(4) Public sponsorship of private entities

§ 3907(b)–(d)

(a)(4)(A)–(b)(2)(J) unchanged

WhereMarkThe Code nowMarkAs the bill would leave it
(b)(2)(K)(K) (K)
The extent to which assistance under this chapter reduces the contribution of Federal assistance to the project.The extent to which assistance under this chapter reduces the contribution of Federal assistance to the project.
(b)(3)(3) Special rule for certain combined projects(3) Special rule for certain combined projects
For a project described in section 3905(9) of this title, the Administrator shall only consider the criteria described in subparagraphs (B) through (K) of paragraph (2).For a project described in section 3905(9) of this title, the Administrator shall only consider the criteria described in subparagraphs (B) through (K) of paragraph (2).
(c)(c) [inserted: Collaborative project delivery methods.—]
(c)(1)(1) [inserted: Authorization.—]
[inserted: The Secretary or the Administrator, as applicable, may select, in accordance with this section, a project to be carried out using a collaborative project delivery method (consistent with any applicable State or local law), including a construction management at-risk method and a design-build method.]
(c)(2)(2) [inserted: Definitions.—]
[inserted: In this subsection:]
(c)(2)(A)(A) [inserted: Collaborative project delivery method.—]
[inserted: The term “collaborative project delivery method” means a method for carrying out a capital project that involves close collaboration among the eligible entity, the owner of the project (if different from the eligible entity), the designer of the project, and the contractor for the project, from design through completion of construction.]
(c)(2)(B)(B) [inserted: Construction management at-risk method.—]
[inserted: The term “construction management at-risk method” means a collaborative project delivery method in which an engineering firm and a construction management at-risk firm are retained under 2 separate contracts for design and construction, respectively.]
(c)(2)(C)(C) [inserted: Design-build method.—]
[inserted: The term “design-build method” means a collaborative project delivery method under which a single lead contract is entered into with a design-builder for design and construction.]
(d)[struck: (c)] Federal requirements[inserted: (d)] Federal requirements
Nothing in this section supersedes the applicability of other requirements of Federal law (including regulations).Nothing in this section supersedes the applicability of other requirements of Federal law (including regulations).

33 U.S.C. § 3908 Secured loans

+8 −2Shown
More for 33 U.S.C. § 3908
Read § 3908Only this section
3 changes the bill asks for here, 3 carried out
  1. Carried out:

    in subparagraph (B), by striking The final maturity date and inserting Notwithstanding subparagraphs (A) and (B), the final maturity date;

  2. Carried out:

    by redesignating subparagraph (B) as subparagraph (C); and

  3. Carried out:

    by inserting after subparagraph (A) the following:(B) Projects with a useful life of more than 35 years.— Notwithstanding subparagraph (A), for a project with a useful life of more than 35 years (as determined by the Secretary or the Administrator, as applicable), the final maturity date of a secured loan under this section …

§ 3908(b)Terms and limitations(5)–(7)

Start of § 3908 to (b)(5)(A) unchanged

WhereMarkThe Code nowMarkAs the bill would leave it
(5)(A)(i)(i) (i)
the date that is 35 years after the date of substantial completion of the relevant project (as determined by the Secretary or the Administrator, as applicable); andthe date that is 35 years after the date of substantial completion of the relevant project (as determined by the Secretary or the Administrator, as applicable); and
(5)(A)(ii)(ii) (ii)
if the useful life of the project (as determined by the Secretary or Administrator, as applicable) is less than 35 years, the useful life the project.if the useful life of the project (as determined by the Secretary or Administrator, as applicable) is less than 35 years, the useful life the project.
(5)(B)(B) [inserted: Projects with a useful life of more than 35 years.—]
[inserted: Notwithstanding subparagraph (A), for a project with a useful life of more than 35 years (as determined by the Secretary or the Administrator, as applicable), the final maturity date of a secured loan under this section shall be not later than the earlier of—]
(5)(B)(i)(i) [inserted: ]
[inserted: the date that is 55 years after the date of substantial completion of the relevant project (as determined by the Secretary or the Administrator, as applicable); and]
(5)(B)(ii)(ii) [inserted: ]
[inserted: if the useful life of the project is less than 55 years, the useful life of the project.]
(5)(C)[struck: (B)] Special rule for State infrastructure financing authorities[inserted: (C)] Special rule for State infrastructure financing authorities
[struck: The] final maturity date of a secured loan to a State infrastructure financing authority under this section shall be not later than 35 years after the date on which amounts are first disbursed.[inserted: Notwithstanding] [inserted: subparagraphs (A) and (B), the ]final maturity date of a secured loan to a State infrastructure financing authority under this section shall be not later than 35 years after the date on which amounts are first disbursed.
(6)(6) Nonsubordination(6) Nonsubordination
A secured loan under this section shall not be subordinated to the claims of any holder of project obligations in the event of bankruptcy, insolvency, or liquidation of the obligor of the project.A secured loan under this section shall not be subordinated to the claims of any holder of project obligations in the event of bankruptcy, insolvency, or liquidation of the obligor of the project.
(7)(7) Fees(7) Fees

Rest of § 3908 unchanged

33 U.S.C. § 3912 Funding

+8 −4Shown
More for 33 U.S.C. § 3912
Read § 3912Only this section
4 changes the bill asks for here, 4 carried out
  1. Carried out:

    in subsection (b)(2) by inserting (other than technical assistance under section 5023(c)) after technical assistance; and

  2. Carried out:

    in subsection (c)(1) by inserting and for technical assistance to small communities under section 5023(c) before the period at the end.

  3. Carried out:

    by amending subsection (a)(3) to read as follows:(3) Fiscal years 2025 through 2029.— There is authorized to be appropriated to carry out this subtitle, to remain available until expended— (A) $68,000,000 to the Administrator for each of fiscal years 2025 through 2029; and (B) $15,000,000 to the Secretary for each of fiscal years 2025 through 2029.; and

  4. Carried out:

    in subsection (b)(2), by striking the Administrator and inserting the Secretary or the Administrator, as applicable,.

§ 3912(a)–(d)

Start of § 3912 to (a)(1)(D) unchanged

WhereMarkThe Code nowMarkAs the bill would leave it
(a)(1)(E)(E) (E)
$50,000,000 for fiscal year 2019.$50,000,000 for fiscal year 2019.
(a)(2)(2) Fiscal years 2020 and 2021(2) Fiscal years 2020 and 2021
There is authorized to be appropriated to the Administrator to carry out this chapter $50,000,000 for each of fiscal years 2020 and 2021, to remain available until expended.There is authorized to be appropriated to the Administrator to carry out this chapter $50,000,000 for each of fiscal years 2020 and 2021, to remain available until expended.
(a)(3)(3) Fiscal years [struck: 2022] through [struck: 2026](3) Fiscal years [inserted: 2025] through [inserted: 2029.—]
[inserted: There is authorized to be appropriated to carry out this subtitle, to remain available until expended—]
(a)(3)(A)(A) [inserted: ]
[inserted: $68,000,000 to the Administrator for each of fiscal years 2025 through 2029; and]
(a)(3)(B)(B) [inserted: ]
[inserted: $15,000,000 to the Secretary for each of fiscal years 2025 through 2029.]
(a)(3)[struck: There is authorized to be appropriated to the Administrator to carry out this chapter $50,000,000 for each of fiscal years 2022 through 2026, to remain available until expended.]
(b)(b) Administrative costs(b) Administrative costs
(b)(1)(1) Fiscal years 2015 through 2019(1) Fiscal years 2015 through 2019
Of the funds made available to carry out this chapter, the Secretary or the Administrator, as applicable, may use for the administration of this chapter, including for the provision of technical assistance to aid project sponsors in obtaining the necessary approvals for the project, not more than $2,200,000 for each of fiscal years 2015 through 2019.Of the funds made available to carry out this chapter, the Secretary or the Administrator, as applicable, may use for the administration of this chapter, including for the provision of technical assistance to aid project sponsors in obtaining the necessary approvals for the project, not more than $2,200,000 for each of fiscal years 2015 through 2019.
(b)(2)(2) Fiscal years after 2019(2) Fiscal years after 2019
Of the funds made available to carry out this chapter, the Administrator may use for the administration of this chapter, including for the provision of technical assistance to aid project sponsors in obtaining the necessary approvals for the project, not more than $5,000,000 for each of fiscal years 2022 through 2026.Of the funds made available to carry out this chapter, the [inserted: Secretary or the ]Administrator[inserted: ,] [inserted: as applicable, ]may use for the administration of this chapter, including for the provision of technical assistance [inserted: (other than technical assistance under section 5023(c)) ]to aid project sponsors in obtaining the necessary approvals for the project, not more than $5,000,000 for each of fiscal years 2022 through 2026.
(c)(c) Small community water infrastructure projects(c) Small community water infrastructure projects
(c)(1)(1) In general(1) In general
For each fiscal year, the Secretary or the Administrator, as applicable, shall set aside not less than 15 percent of the amounts made available for that fiscal year under this section for small community water infrastructure projects described in section 3907(a)(2)(B) of this title.For each fiscal year, the Secretary or the Administrator, as applicable, shall set aside not less than 15 percent of the amounts made available for that fiscal year under this section for small community water infrastructure projects described in section 3907(a)(2)(B) of this title[inserted: and for technical assistance to small communities under section 5023(c)].
(c)(2)(2) Administration(2) Administration
Any amounts set aside under paragraph (1) that remain unobligated on June 1 of the fiscal year for which the amounts are set aside shall be available for obligation by the Secretary or the Administrator, as applicable, for projects other than small community water infrastructure projects.Any amounts set aside under paragraph (1) that remain unobligated on June 1 of the fiscal year for which the amounts are set aside shall be available for obligation by the Secretary or the Administrator, as applicable, for projects other than small community water infrastructure projects.
(d)(d) Additional funding(d) Additional funding
Notwithstanding section 3908(b)(2) of this title, the Secretary or the Administrator, as applicable, may make available up to 25 percent of the amounts made available for each fiscal year under this section for loans in excess of 49 percent of the total project costs.Notwithstanding section 3908(b)(2) of this title, the Secretary or the Administrator, as applicable, may make available up to 25 percent of the amounts made available for each fiscal year under this section for loans in excess of 49 percent of the total project costs.

Rest of § 3912 unchanged

33 U.S.C. § 3913 Reports on program implementation

+12 −104 of 5 shown
More for 33 U.S.C. § 3913
Read § 3913Only this section
5 changes the bill asks for here, 4 carried out
  1. Not carried out:

    in paragraph (1), by striking Not later than 3 years after the date of enactment of the Water Resources Development Act of 2018 and inserting Not later than 4 years after the date of enactment of the Water Infrastructure Finance and Innovation Act Amendments of 2025; and

    “Not later than 3 years after the date of enactment of the Water Resources Development Act of 2018” isn't in § 3913(b)(1) in the Code as we have it. The law may have changed since the bill was drafted.

    Technical detail“Not later than 3 years after the date of enactment of the Water Resources Development Act of 2018” not found in /us/usc/t33/s3913/b/1
  2. Carried out:

    by redesignating subparagraphs (B) and (C) as subparagraphs (C) and (D), respectively, and inserting after subparagraph (A) the following:(B) an evaluation of the implementation of this subtitle by the Secretary;; and

  3. Carried out:

    by redesignating subparagraphs (B) and (C) as subparagraphs (C) and (D), respectively, and inserting after subparagraph (A) the following:(B) an evaluation of the implementation of this subtitle by the Secretary;; and

  4. Carried out:

    by inserting evaluations and before recommendations; and

  5. Carried out:

    by striking subparagraphs (A) and (B) and inserting subparagraphs (A), (B), and (C).

§ 3913(b)(2)Recommendations(A)–(D)

Start of § 3913 to (b)(1)(F) unchanged

WhereMarkThe Code nowMarkAs the bill would leave it
(2)(2) Recommendations(2) Recommendations
The report under paragraph (1) shall include—The report under paragraph (1) shall include—
(A)(A) (A)
an evaluation of the impacts (if any) of the limitation under section 3907(a)(5)1 of this title on the ability of eligible entities to finance water infrastructure projects under this chapter;an evaluation of the impacts (if any) of the limitation under section 3907(a)(5)1 of this title on the ability of eligible entities to finance water infrastructure projects under this chapter;
(B)(B) [inserted: ]
[inserted: an evaluation of the implementation of this subtitle by the Secretary;]
(C)[struck: (B)] [inserted: (C)]
a recommendation as to whether the objectives of this chapter would be best served—a recommendation as to whether the objectives of this chapter would be best served—
(C)(i)(i) (i)
by continuing the authority of the Secretary or the Administrator, as applicable, to provide assistance under this chapter;by continuing the authority of the Secretary or the Administrator, as applicable, to provide assistance under this chapter;
(C)(ii)(ii) (ii)
by establishing a Government corporation or Government-sponsored enterprise to provide assistance in accordance with this chapter; orby establishing a Government corporation or Government-sponsored enterprise to provide assistance in accordance with this chapter; or
(C)(iii)(iii) (iii)
by terminating the authority of the Secretary and the Administrator under this chapter and relying on the capital markets to fund the types of infrastructure investments assisted by this chapter without Federal participation; andby terminating the authority of the Secretary and the Administrator under this chapter and relying on the capital markets to fund the types of infrastructure investments assisted by this chapter without Federal participation; and
(D)[struck: (C)] [inserted: (D)]
any proposed changes to improve the efficiency and effectiveness of this chapter in providing financing for water infrastructure projects, taking into consideration the recommendations made under subparagraphs (A) and ([struck: B]).any proposed changes to improve the efficiency and effectiveness of this chapter in providing financing for water infrastructure projects, taking into consideration the [inserted: evaluations and ]recommendations made under subparagraphs (A)[inserted: ,] [inserted: (B), ]and ([inserted: C]).

33 U.S.C. § 3915 Outreach plan

+2 −5Shown
More for 33 U.S.C. § 3915
Read § 3915Only this section
1 change the bill asks for here, 1 carried out
  1. Carried out:

    Section 5036 of the Water Resources Reform and Development Act of 2014 (33 U.S.C. 3915) is amended to read as follows:5036. Outreach plan to small communities Not later than 180 days after the date of enactment of the Water Infrastructure Finance and Innovation Act Amendments of 2025, the Administrator, in consultation with relevant Federal agencies, shall develop and begin implementation of an …

§ 3915(a)–(b)

WhereMarkThe Code nowMarkAs the bill would leave it
§ 3915. Outreach plan§ 3915. Outreach plan[inserted: to small communities]
[inserted: Not later than 180 days after the date of enactment of the Water Infrastructure Finance and Innovation Act Amendments of 2025, the Administrator, in consultation with relevant Federal agencies, shall develop and begin implementation of an outreach plan to promote financial assistance available under this subtitle to small communities.]
(a)(a) [struck: Definition of rural community]
[struck: In this section, the term “rural community” means a city, town, or unincorporated area that has a population of not more than 10,000 inhabitants.]
(b)(b) [struck: Outreach required]
[struck: Not later than 180 days after November 15, 2021, the Administrator, in consultation with relevant Federal agencies, shall develop and begin implementation of an outreach plan to promote financial assistance available under this subtitle to small communities and rural communities.]