Changes to the Code
H.R. 6256 · Floodplain Enhancement and Recovery Act · Introduced The text as a member of Congress first filed it. Most bills never get further than this.
In committee · step 2 of 5
42 U.S.C. § 4101e Exemption from fees for certain map change requests
1 change the bill asks for here, 1 carried out
- Carried out:
Section 22 of the Homeowner Flood Insurance Affordability Act of 2014 (42 U.S.C. 4101e) is amended to read as follows:
22. Ecosystem restoration projects (a) Definition.— In this section, the term “ecosystem restoration project” means a project proposed for the primary purpose of manipulating the physical, chemical, or biological characteristics of a site with the goal of— (1) recovering natural …
§ 4101e(a)–(d)
§ 4101e. [struck: Exemption][inserted: Ecosystem] [struck: from][inserted: restoration] [struck: fees for certain map change requests][inserted: projects]
(a) [inserted: Definition.—] [inserted: In this section, the term “ecosystem restoration project” means a project proposed for the primary purpose of manipulating the physical, chemical, or biological characteristics of a site with the goal of—]
(1) [inserted: recovering natural and beneficial functions to a former or degraded aquatic resource or floodplain; or]
(2) [inserted: enhancing, accelerating, reclaiming, or improving a specific, natural, and beneficial function of an aquatic resource or floodplain.]
(b) [inserted: Exemption from fees for flood hazard change requests for ecosystem restoration projects.—] [inserted: Notwithstanding any other provision of law, a requester shall be exempt from submitting a review or processing fee for a request for a flood insurance rate map change based on an ecosystem restoration project.]
(c) [inserted: Exemption from conditional approval for certain ecosystem restoration projects.—] [inserted: A community may permit an ecosystem restoration project within an adopted regulatory floodway that would result in an increase in base flood elevations, if—]
(1) [inserted: a professional engineer uses the best judgment of the engineer to determine that the cumulative effect of the proposed ecosystem restoration project, when combined with all other existing development, will not increase the water surface elevation of the base flood by more than 1 foot (or a greater amount or metric determined appropriate by the Administrator);]
(2) [inserted: no insurable structure or any critical infrastructure is located in an area that would be adversely impacted by the increased base flood elevation; and]
(3) [inserted: not later than 180 days after the date on which the ecosystem restoration project is completed, the community submits to the Administrator an analysis regarding the changed conditions caused by the ecosystem restoration project.]
(d) [inserted: Rule of construction.—] [inserted: Nothing in this section may be construed to affect the procedure (as in effect on the day before the date of enactment of the Floodplain Enhancement and Recovery Act) for providing notification to a landowner with respect to development in a regulatory floodway.]
[struck: Notwithstanding any other provision of law, a requester shall be exempt from submitting a review or processing fee for a request for a flood insurance rate map change based on a habitat restoration project that is funded in whole or in part with Federal or State funds, including dam removal, culvert redesign or installation, or the installation of fish passage.]