43 U.S.C. § 510 Definitions

+36 −224 of 5 shown
More for 43 U.S.C. § 510
Read § 510Only this section
5 changes the bill asks for here, 4 carried out
  1. Carried out:

    by redesignating paragraphs (1), (2), (3), (4), (5), (6), and (7) as paragraphs (2), (3), (4), (5), (6), (7), and (1), respectively;

  2. Not carried out:

    by arranging the redesignated paragraphs in numerical order;

    We can't read how this instruction is worded yet, so it isn't shown in the text.

    Technical detailno-pattern: arranging the redesignated paragraphs in numerical order;
  3. Carried out:

    in paragraph (3) (as so redesignated), by striking et seq.) and inserting et seq.));

  4. Carried out:

    in paragraph (4) (as so redesignated), by striking mean and inserting means; and

  5. Carried out:

    by adding at the end the following:(8) Urban canal of concern.— The term “urban canal of concern” means a transferred works or segment of a transferred works— (A) that is— (i) a canal reach, the failure of which would result in— (I) an estimated at-risk population of more than 100 individuals; or (II) an …

§ 510(2)–(8)

WhereMarkThe Code nowMarkAs the bill would leave it
§ 510. Definitions§ 510. Definitions
In this subchapter:In this subchapter:
(2)[struck: (1)] Inspection[inserted: (2)] Inspection
The term “inspection” means an inspection of a project facility carried out by the Secretary—The term “inspection” means an inspection of a project facility carried out by the Secretary—
(2)(A)(A) (A)
to assess and determine the general condition of the project facility; andto assess and determine the general condition of the project facility; and
(2)(B)(B) (B)
to estimate the value of property, and the size of the population, that would be at risk if the project facility fails, is breached, or otherwise allows flooding to occur.to estimate the value of property, and the size of the population, that would be at risk if the project facility fails, is breached, or otherwise allows flooding to occur.
(3)[struck: (2)] Project facility[inserted: (3)] Project facility
The term “project facility” means any part or incidental feature of a project, excluding high- and significant-hazard dams, constructed under the Federal reclamation law (the Act of June 17, 1902 (32 Stat. 388, chapter 1093), and Acts supplemental to and amendatory of that Act (43 U.S.C. 371 et seq.) .The term “project facility” means any part or incidental feature of a project, excluding high- and significant-hazard dams, constructed under the Federal reclamation law (the Act of June 17, 1902 (32 Stat. 388, chapter 1093), and Acts supplemental to and amendatory of that Act (43 U.S.C. 371 et seq.)[inserted: )] .
(4)[struck: (3)] Reserved works[inserted: (4)] Reserved works
The term “reserved works” [struck: mean] any project facility at which the Secretary carries out the operation and maintenance of the project facility.The term “reserved works” [inserted: means] any project facility at which the Secretary carries out the operation and maintenance of the project facility.
(5)[struck: (4)] Secretary[inserted: (5)] Secretary
The term “Secretary” means the Secretary of the Interior, acting through the Commissioner of Reclamation.The term “Secretary” means the Secretary of the Interior, acting through the Commissioner of Reclamation.
(6)[struck: (5)] Transferred works[inserted: (6)] Transferred works
The term “transferred works” means a project facility, the operation and maintenance of which is carried out by a non-Federal entity, under the provisions of a formal operation and maintenance transfer contract.The term “transferred works” means a project facility, the operation and maintenance of which is carried out by a non-Federal entity, under the provisions of a formal operation and maintenance transfer contract.
(7)[struck: (6)] Transferred works operating entity[inserted: (7)] Transferred works operating entity
The term “transferred works operating entity” means the organization which is contractually responsible for operation and maintenance of transferred works.The term “transferred works operating entity” means the organization which is contractually responsible for operation and maintenance of transferred works.
(1)[struck: (7)] Extraordinary operation and maintenance work[inserted: (1)] Extraordinary operation and maintenance work
The term “extraordinary operation and maintenance work” means major, nonrecurring maintenance to Reclamation-owned or operated facilities, or facility components, that is—The term “extraordinary operation and maintenance work” means major, nonrecurring maintenance to Reclamation-owned or operated facilities, or facility components, that is—
(1)(A)(A) (A)
intended to ensure the continued safe, dependable, and reliable delivery of authorized project benefits; andintended to ensure the continued safe, dependable, and reliable delivery of authorized project benefits; and
(1)(B)(B) (B)
greater than 10 percent of the contractor’s or the transferred works operating entity’s annual operation and maintenance budget for the facility, or greater than $100,000.greater than 10 percent of the contractor’s or the transferred works operating entity’s annual operation and maintenance budget for the facility, or greater than $100,000.
(8)(8) [inserted: Urban canal of concern.—]
[inserted: The term “urban canal of concern” means a transferred works or segment of a transferred works—]
(8)(A)(A) [inserted: ]
[inserted: that is—]
(8)(A)(i)(i) [inserted: ]
[inserted: a canal reach, the failure of which would result in—]
(8)(A)(i)(I)(I) [inserted: ]
[inserted: an estimated at-risk population of more than 100 individuals; or]
(8)(A)(i)(II)(II) [inserted: ]
[inserted: an estimated property damage of more than $5,000,000; or]
(8)(A)(ii)(ii) [inserted: ]
[inserted: a canal reach determined by the responsible Bureau of Reclamation regional or area office to be classified as an urban canal reach; and]
(8)(B)(B) [inserted: ]
[inserted: with respect to which the Secretary determines, pursuant to the guidelines and criteria developed under section 9602(a), that if a failure were to occur, the failure would result in loss of life and property in the vicinity of the failed transferred works or segment of transferred works.]

43 U.S.C. § 510b Extraordinary operation and maintenance work performed by the Secretary

+7 −0Shown
More for 43 U.S.C. § 510b
Read § 510bOnly this section
1 change the bill asks for here, 1 carried out
  1. Carried out:

    Section 9603 of the Omnibus Public Land Management Act of 2009 (43 U.S.C. 510b) is amended by adding at the end the following:(e) Extraordinary operation and maintenance work on urban canals of concern.— (1) In general.— The Secretary or the transferred works operating entity shall carry out any extraordinary operation and maintenance work on an urban canal of concern that the transferred works …

§ 510b(d)–(f)

Start of § 510b to (d)(7) unchanged

WhereMarkThe Code nowMarkAs the bill would leave it
(d)(7)(A)(A) (A)
any funding provided, or contracts entered into, under subsection (a) before December 27, 2020; orany funding provided, or contracts entered into, under subsection (a) before December 27, 2020; or
(d)(7)(B)(B) (B)
the use of funds otherwise made available to the Secretary to carry out subsection (a).the use of funds otherwise made available to the Secretary to carry out subsection (a).
(e)(e) [inserted: Extraordinary operation and maintenance work on urban canals of concern.—]
(e)(1)(1) [inserted: In general.—]
[inserted: The Secretary or the transferred works operating entity shall carry out any extraordinary operation and maintenance work on an urban canal of concern that the transferred works operating entity, with the concurrence of the Secretary, determines to be necessary.]
(e)(2)(2) [inserted: Funding.—]
[inserted: In the case of extraordinary operation and maintenance work on an urban canal of concern authorized under paragraph (1), or if the Secretary determines that a project facility inspected and maintained pursuant to the guidelines and criteria set forth in section 9602(a) requires extraordinary operation and maintenance work pursuant to paragraph (1), the Secretary shall provide Federal funds on a nonreimbursable basis sufficient to cover 35 percent of the portion of total cost of the extraordinary operation and maintenance work allocable to the transferred works operating entity that is needed to carry out the extraordinary operation and maintenance work on the urban canal of concern, with the remaining share of any additional Federal funds advanced by the Secretary for the extraordinary operation and maintenance work to be repaid under subsection (b).]
(f)(f) [inserted: Reimbursable funds.—]
[inserted: Any reimbursable funds provided under this section shall be considered to be a non-Federal source of funds for purposes of any cost-sharing requirement for a Federal grant.]