Title 16 · ConservationParks and public lands
Changes to 16 U.S.C. § 831m–1
H.R. 6357 · TVA Increase Rate of Participation Act · Introduced The text as a member of Congress first filed it. Most bills never get further than this.
TVA IRP Act
In committee · step 2 of 5
16 U.S.C. § 831m–1 Tennessee Valley Authority least-cost planning program
+1 −1Shown
1 change the bill asks for here, 1 carried out
- Carried out:
Section 113(b)(2)(A) of the Energy Policy Act of 1992 (16 U.S.C. 831m–1) is amended by inserting
resilience, extreme weather risk, impacts to public health,
afterdispatchability
.
§ 831m–1(b)(2)Planning and selection process(A)–(C)
Start of § 831m–1 to (b)(1) unchanged
| Where | Mark | Text |
|---|---|---|
| (2) | (2) Planning and selection process | |
| The planning and selection process referred to in paragraph (1) shall— | ||
| (A) | (A) | |
| take into account necessary features for system operation, including diversity, reliability, dispatchability, and other factors of risk; | ||
| take into account necessary features for system operation, including diversity, reliability, dispatchability[inserted: resilience], [inserted: extreme weather risk, impacts to public health,, ]and other factors of risk; | ||
| (B) | (B) | |
| take into account the ability to verify energy savings achieved through energy conservation and efficiency and the projected durability of such savings measured over time; and | ||
| (C) | (C) | |
| treat demand and supply resources on a consistent and integrated basis. |
Rest of § 831m–1 unchanged