16 U.S.C. § 831m–1 Tennessee Valley Authority least-cost planning program

+1 −1Shown
More for 16 U.S.C. § 831m–1
Read § 831m–1Only this section
1 change the bill asks for here, 1 carried out
  1. Carried out:

    Section 113(b)(2)(A) of the Energy Policy Act of 1992 (16 U.S.C. 831m–1) is amended by inserting resilience, extreme weather risk, impacts to public health, after dispatchability.

§ 831m–1(b)(2)Planning and selection process(A)–(C)

Start of § 831m–1 to (b)(1) unchanged

WhereMarkThe Code nowMarkAs the bill would leave it
(2)(2) Planning and selection process(2) Planning and selection process
The planning and selection process referred to in paragraph (1) shall—The planning and selection process referred to in paragraph (1) shall—
(A)(A) (A)
take into account necessary features for system operation, including diversity, reliability, dispatchability, and other factors of risk;take into account necessary features for system operation, including diversity, reliability, dispatchability[inserted: resilience], [inserted: extreme weather risk, impacts to public health,, ]and other factors of risk;
(B)(B) (B)
take into account the ability to verify energy savings achieved through energy conservation and efficiency and the projected durability of such savings measured over time; andtake into account the ability to verify energy savings achieved through energy conservation and efficiency and the projected durability of such savings measured over time; and
(C)(C) (C)
treat demand and supply resources on a consistent and integrated basis.treat demand and supply resources on a consistent and integrated basis.