Changes to the Code

H.R. 7066 · SHIELD Act ·

In committee · step 2 of 5

Sections are cited like “7 U.S.C. § 2012”: 7 of the , 2012.

16 U.S.C. § 2621 Consideration and determination respecting certain ratemaking standards

+27 −0Shown
More for 16 U.S.C. § 2621
Read § 2621Only this section
2 changes the bill asks for here, 2 carried out
  1. Carried out:

    Section 111(d) of the Public Utility Regulatory Policies Act of 1978 (16 U.S.C. 2621(d)) is amended by adding at the end the following:(22) Large load facility class.— (A) Classification.— Large load facilities shall be considered a class of electric consumers. (B) Cost recovery relating to large load facility class.— Each electric utility that provides electric service to a class of electric consumers …

  2. Carried out:

    Section 111 of the Public Utility Regulatory Policies Act of 1978 (16 U.S.C. 2621) is amended by adding at the end the following:(e) Definitions.— For the purposes of subsection (d): (1) Large load facility.— The term “large load facility”— (A) means a facility, or an aggregation of facilities at a single site, with respect to which the peak demand of such facility or such aggregation of facilities …

§ 2621(d)–(e)

Start of § 2621 to (d)(21)(B) unchanged

WhereMarkThe Code nowMarkAs the bill would leave it
(d)(21)(C)(C) (C)
accelerate third-party investment in electric vehicle charging for light-, medium-, and heavy-duty vehicles; andaccelerate third-party investment in electric vehicle charging for light-, medium-, and heavy-duty vehicles; and
(d)(21)(D)(D) (D)
appropriately recover the marginal costs of delivering electricity to electric vehicles and electric vehicle charging infrastructure.appropriately recover the marginal costs of delivering electricity to electric vehicles and electric vehicle charging infrastructure.
(d)(22)(22) [inserted: Large load facility class.—]
(d)(22)(A)(A) [inserted: Classification.—]
[inserted: Large load facilities shall be considered a class of electric consumers.]
(d)(22)(B)(B) [inserted: Cost recovery relating to large load facility class.—]
[inserted: Each electric utility that provides electric service to a class of electric consumers described in subparagraph (A) shall fully recover from such class all costs associated with any upgrade made to the generation, transmission, or distribution facilities of the electric grid, including local facilities, in order to meet the demand for electric energy from such class, including in the event that a large load facility ceases operations or uses less electric energy than projected at the time of such upgrade.]
(d)(23)(23) [inserted: Grid reliability for large load facilities.—]
[inserted: Each electric utility shall prioritize, among requests from owners or operators of large load facilities for electric service, such a request under which the owner or operator agrees to employ—]
(d)(23)(A)(A) [inserted: ]
[inserted: features that reduce the demand for electric energy from the electric grid during times of peak demand, including—]
(d)(23)(A)(i)(i) [inserted: ]
[inserted: energy efficiency or energy conservation measures;]
(d)(23)(A)(ii)(ii) [inserted: ]
[inserted: onsite energy storage; or]
(d)(23)(A)(iii)(iii) [inserted: ]
[inserted: demand response or load flexibility technologies; and]
(d)(23)(B)(B) [inserted: ]
[inserted: zero-emission electric energy generated onsite or procured within the same balancing authority through a power purchase agreement to meet all of the demand of the large load facility for electric energy.]
(e)(e) [inserted: Definitions.—]
[inserted: For the purposes of subsection (d):]
(e)(1)(1) [inserted: Large load facility.—]
[inserted: The term “large load facility”—]
(e)(1)(A)(A) [inserted: ]
[inserted: means a facility, or an aggregation of facilities at a single site, with respect to which the peak demand of such facility or such aggregation of facilities exceeds 75 megawatts; and]
(e)(1)(B)(B) [inserted: ]
[inserted: does not include an existing facility with respect to which any increased demand is predominantly caused by electrification or measures to reduce greenhouse gas emissions.]
(e)(2)(2) [inserted: Zero-emission electric energy.—]
[inserted: The term “zero-emission electric energy” means electric energy generated without emitting greenhouse gases, including from solar, wind, geothermal, hydroelectric, tidal, fission, or fusion.]

16 U.S.C. § 2622 Obligations to consider and determine

+16 −13 of 4 shown
More for 16 U.S.C. § 2622
Read § 2622Only this section
4 changes the bill asks for here, 3 carried out
  1. Carried out:

    in subsection (b), by adding at the end the following:(9) (A) Not later than 1 year after the date of enactment of this paragraph, each State regulatory authority (with respect to each electric utility for which the State has ratemaking authority) and each nonregulated utility shall commence consideration under section 111, or set …

  2. Carried out:

    by striking subsection (b)(2) and inserting subsection (b); and

  3. Not carried out:

    by inserting In the case of the standard established by paragraphs (22) and (23) of section 111(d), the reference contained in this subsection to the date of enactment of this Act shall be deemed to be a reference to the date of enactment of such paragraphs (22) and (23). after paragraph (21).; and

    “paragraph (21).” isn't in § 2622(c) in the Code as we have it. The law may have changed since the bill was drafted.

    Technical detail“paragraph (21).” not found in /us/usc/t16/s2622/c
  4. Carried out:

    by adding at the end the following:(i) Other prior State actions.— Subsections (b) and (c) shall not apply to the standards established by paragraphs (22) and (23) of section 111(d) in the case of any electric utility in a State if, before the date of enactment of this subsection— (1) the State has implemented …

§ 2622(b)–(d)

Start of § 2622 to (b)(8) unchanged

WhereMarkThe Code nowMarkAs the bill would leave it
(b)(8)(A)(A) (A)
Not later than 1 year after November 15, 2021, each State regulatory authority (with respect to each electric utility for which the State has ratemaking authority) and each nonregulated utility shall commence consideration under section 2621 of this title, or set a hearing date for consideration, with respect to the standard established by paragraph (21) of section 2621(d) of this title.Not later than 1 year after November 15, 2021, each State regulatory authority (with respect to each electric utility for which the State has ratemaking authority) and each nonregulated utility shall commence consideration under section 2621 of this title, or set a hearing date for consideration, with respect to the standard established by paragraph (21) of section 2621(d) of this title.
(b)(8)(B)(B) (B)
Not later than 2 years after November 15, 2021, each State regulatory authority (with respect to each electric utility for which the State has ratemaking authority), and each nonregulated electric utility shall complete the consideration and make the determination under section 2621 of this title with respect to the standard established by paragraph (21) of section 2621(d) of this title.Not later than 2 years after November 15, 2021, each State regulatory authority (with respect to each electric utility for which the State has ratemaking authority), and each nonregulated electric utility shall complete the consideration and make the determination under section 2621 of this title with respect to the standard established by paragraph (21) of section 2621(d) of this title.
(b)(9)(9) [inserted: ]
(b)(9)(A)(A) [inserted: ]
[inserted: Not later than 1 year after the date of enactment of this paragraph, each State regulatory authority (with respect to each electric utility for which the State has ratemaking authority) and each nonregulated utility shall commence consideration under section 111, or set a hearing date for consideration, with respect to each standard established by paragraphs (22) and (23) of section 111(d).]
(b)(9)(B)(B) [inserted: ]
[inserted: Not later than 2 years after the date of enactment of this paragraph, each State regulatory authority (with respect to each electric utility for which the State has ratemaking authority), and each nonregulated electric utility shall complete the consideration and make the determination under section 111 with respect to each standard established by paragraphs (22) and (23) of section 111(d).]
(b)(9)(C)(C) [inserted: ]
[inserted: Not later than 30 days after completing the consideration and making a determination under section 111 with respect to each standard established by paragraphs (22) and (23) of section 111(d), each State regulatory authority (with respect to each electric utility for which the State has ratemaking authority), and each nonregulated electric utility shall submit to the Committee on Energy and Commerce of the House of Representatives and the Committee on Energy and Natural Resources of the Senate a report detailing the process used for consideration and an explanation for the determination.]
(c)(c) Failure to comply(c) Failure to comply
Each State regulatory authority (with respect to each electric utility for which it has ratemaking authority) and each nonregulated electric utility shall undertake the consideration, and make the determination, referred to in section 2621 of this title with respect to each standard established by section 2621(d) of this title in the first rate proceeding commenced after the date three years after November 9, 1978, respecting the rates of such utility if such State regulatory authority or nonregulated electric utility has not, before such date, complied with subsection (b)[struck: (2)] with respect to such standard. In the case of each standard established by paragraphs (11) through (13) of section 2621(d) of this title, the reference contained in this subsection to November 9, 1978, shall be deemed to be a reference to August 8, 2005. In the case of the standard established by paragraph (14) of section 2621(d) of this title, the reference contained in this subsection to November 9, 1978, shall be deemed to be a reference to August 8, 2005. In the case of the standard established by paragraph (15) of section 2621(d) of this title, the reference contained in this subsection to November 9, 1978, shall be deemed to be a reference to August 8, 2005. In the case of the standards established by paragraphs (16) through (19) of section 2621(d) of this title, the reference contained in this subsection to November 9, 1978, shall be deemed to be a reference to December 19, 2007. In the case of the standard established by paragraph (20) of section 2621(d) of this title, the reference contained in this subsection to November 9, 1978, shall be deemed to be a reference to November 15, 2021. In the case of the standard established by paragraph (21) of section 2621(d) of this title, the reference contained in this subsection to November 9, 1978, shall be deemed to be a reference to November 15, 2021.Each State regulatory authority (with respect to each electric utility for which it has ratemaking authority) and each nonregulated electric utility shall undertake the consideration, and make the determination, referred to in section 2621 of this title with respect to each standard established by section 2621(d) of this title in the first rate proceeding commenced after the date three years after November 9, 1978, respecting the rates of such utility if such State regulatory authority or nonregulated electric utility has not, before such date, complied with subsection (b) with respect to such standard. In the case of each standard established by paragraphs (11) through (13) of section 2621(d) of this title, the reference contained in this subsection to November 9, 1978, shall be deemed to be a reference to August 8, 2005. In the case of the standard established by paragraph (14) of section 2621(d) of this title, the reference contained in this subsection to November 9, 1978, shall be deemed to be a reference to August 8, 2005. In the case of the standard established by paragraph (15) of section 2621(d) of this title, the reference contained in this subsection to November 9, 1978, shall be deemed to be a reference to August 8, 2005. In the case of the standards established by paragraphs (16) through (19) of section 2621(d) of this title, the reference contained in this subsection to November 9, 1978, shall be deemed to be a reference to December 19, 2007. In the case of the standard established by paragraph (20) of section 2621(d) of this title, the reference contained in this subsection to November 9, 1978, shall be deemed to be a reference to November 15, 2021. In the case of the standard established by paragraph (21) of section 2621(d) of this title, the reference contained in this subsection to November 9, 1978, shall be deemed to be a reference to November 15, 2021.
(d)(d) Prior State actions relating to standard under certain paragraphs of section 2621(d)(d) Prior State actions relating to standard under certain paragraphs of section 2621(d)
Subsections (b) and (c) of this section shall not apply to the standards established by paragraphs (11) through (13) and paragraphs (16) through (19) of section 2621(d) of this title in the case of any electric utility in a State if, before August 8, 2005—Subsections (b) and (c) of this section shall not apply to the standards established by paragraphs (11) through (13) and paragraphs (16) through (19) of section 2621(d) of this title in the case of any electric utility in a State if, before August 8, 2005—
(d)(1)(1) (1)
the State has implemented for such utility the standard concerned (or a comparable standard);the State has implemented for such utility the standard concerned (or a comparable standard);

§ 2622(h)–(i)

(d)(2)–(h)(1) unchanged

WhereMarkThe Code nowMarkAs the bill would leave it
(h)(2)(2) (2)
the State regulatory authority for the State or the relevant nonregulated electric utility has conducted a proceeding to consider implementation of the standard (or a comparable standard) for the electric utility; orthe State regulatory authority for the State or the relevant nonregulated electric utility has conducted a proceeding to consider implementation of the standard (or a comparable standard) for the electric utility; or
(h)(3)(3) (3)
the State legislature has voted on the implementation of the standard (or a comparable standard) for the electric utility during the 3-year period ending on November 15, 2021.the State legislature has voted on the implementation of the standard (or a comparable standard) for the electric utility during the 3-year period ending on November 15, 2021.
(i)(i) [inserted: Other prior State actions.—]
[inserted: Subsections (b) and (c) shall not apply to the standards established by paragraphs (22) and (23) of section 111(d) in the case of any electric utility in a State if, before the date of enactment of this subsection—]
(i)(1)(1) [inserted: ]
[inserted: the State has implemented for the electric utility the standard concerned (or a comparable standard);]
(i)(2)(2) [inserted: ]
[inserted: the State regulatory authority for the State or the relevant nonregulated electric utility has conducted a proceeding to consider implementation of the standard concerned (or a comparable standard) for the electric utility; or]
(i)(3)(3) [inserted: ]
[inserted: the State legislature has voted on the implementation of the standard concerned (or a comparable standard) for the electric utility during the 3-year period ending on that date of enactment.]

16 U.S.C. § 2634 Prior and pending proceedings

Couldn't place the change
More for 16 U.S.C. § 2634
Read § 2634Only this section

The bill's words for this section

  1. Not carried out:

    Section 124 of the Public Utility Regulatory Policies Act of 1978 (16 U.S.C. 2634) is amended by inserting In the case of each standard established by paragraphs (22) and (23) of section 111(d), the reference contained in this section to the date of enactment of this Act shall be deemed to be a reference to the date of enactment of such paragraphs (22) and (23). after paragraph (21)..

    “paragraph (21).” isn't in § 2634 in the Code as we have it. The law may have changed since the bill was drafted.

    Technical detail“paragraph (21).” not found in /us/usc/t16/s2634

§ 2634

WhereMarkThe Code nowMarkAs the bill would leave it
§ 2634. Prior and pending proceedings§ 2634. Prior and pending proceedings
For purposes of subchapters I and II, and this subchapter, proceedings commenced by State regulatory authorities (with respect to electric utilities for which it has ratemaking authority) and nonregulated electric utilities before November 9, 1978, and actions taken before such date in such proceedings shall be treated as complying with the requirements of subchapters I and II, and this subchapter if such proceedings and actions substantially conform to such requirements. For purposes of subchapters I and II, and this subchapter, any such proceeding or action commenced before November 9, 1978, but not completed before such date, shall comply with the requirements of subchapters I and II, and this subchapter, to the maximum extent practicable, with respect to so much of such proceeding or action as takes place after such date, except as otherwise provided in section 2631(c) of this title. In the case of each standard established by paragraphs (11) through (13) of section 2621(d) of this title, the reference contained in this section to November 9, 1978, shall be deemed to be a reference to August 8, 2005. In the case of the standard established by paragraph (14) of section 2621(d) of this title, the reference contained in this section to November 9, 1978, shall be deemed to be a reference to August 8, 2005. In the case of each standard established by paragraph (15) of section 2621(d) of this title, the reference contained in this section to November 9, 1978, shall be deemed to be a reference to August 8, 2005. In the case of the standard established by paragraph (20) of section 2621(d) of this title, the reference contained in this section to November 9, 1978, shall be deemed to be a reference to November 15, 2021. In the case of the standard established by paragraph (21) of section 2621(d) of this title, the reference contained in this section to November 9, 1978, shall be deemed to be a reference to November 15, 2021.For purposes of subchapters I and II, and this subchapter, proceedings commenced by State regulatory authorities (with respect to electric utilities for which it has ratemaking authority) and nonregulated electric utilities before November 9, 1978, and actions taken before such date in such proceedings shall be treated as complying with the requirements of subchapters I and II, and this subchapter if such proceedings and actions substantially conform to such requirements. For purposes of subchapters I and II, and this subchapter, any such proceeding or action commenced before November 9, 1978, but not completed before such date, shall comply with the requirements of subchapters I and II, and this subchapter, to the maximum extent practicable, with respect to so much of such proceeding or action as takes place after such date, except as otherwise provided in section 2631(c) of this title. In the case of each standard established by paragraphs (11) through (13) of section 2621(d) of this title, the reference contained in this section to November 9, 1978, shall be deemed to be a reference to August 8, 2005. In the case of the standard established by paragraph (14) of section 2621(d) of this title, the reference contained in this section to November 9, 1978, shall be deemed to be a reference to August 8, 2005. In the case of each standard established by paragraph (15) of section 2621(d) of this title, the reference contained in this section to November 9, 1978, shall be deemed to be a reference to August 8, 2005. In the case of the standard established by paragraph (20) of section 2621(d) of this title, the reference contained in this section to November 9, 1978, shall be deemed to be a reference to November 15, 2021. In the case of the standard established by paragraph (21) of section 2621(d) of this title, the reference contained in this section to November 9, 1978, shall be deemed to be a reference to November 15, 2021.

Step through the changes