Skip to content
The People's CodeSearch
Menu

Title 16 · ConservationParks and public lands

Changes to 16 U.S.C. § 824o

H.R. 7728 · Connect the Grid Act ·

In committee · step 2 of 5

Sections are cited like “7 U.S.C. § 2012”: 7 of the , 2012.

16 U.S.C. § 824o Electric reliability

+2 −2Shown
More for 16 U.S.C. § 824o
Read § 824o
2 changes the bill asks for here, 2 carried out
  1. Carried out:

    in subsection (a)(3), by striking enlarge such facilities or to construct new transmission capacity or generation capacity and inserting construct new generation capacity; and

  2. Carried out:

    in subsection (i)(2), by striking or transmission.

§ 824o(a)Definitions(2)–(5)

Start of § 824o to (a)(1) unchanged ·

(2) The terms “Electric Reliability Organization” and “ERO” mean the organization certified by the Commission under subsection (c) the purpose of which is to establish and enforce reliability standards for the bulk-power system, subject to Commission review.

(3) The term “reliability standard” means a requirement, approved by the Commission under this section, to provide for reliable operation of the bulk-power system. The term includes requirements for the operation of existing bulk-power system facilities, including cybersecurity protection, and the design of planned additions or modifications to such facilities to the extent necessary to provide for reliable operation of the bulk-power system, but the term does not include any requirement to [struck: enlarge such facilities or to ]construct new [struck: transmission capacity or ]generation capacity.

(4) The term “reliable operation” means operating the elements of the bulk-power system within equipment and electric system thermal, voltage, and stability limits so that instability, uncontrolled separation, or cascading failures of such system will not occur as a result of a sudden disturbance, including a cybersecurity incident, or unanticipated failure of system elements.

(5) The term “Interconnection” means a geographic area in which the operation of bulk-power system components is synchronized such that the failure of one or more of such components may adversely affect the ability of the operators of other components within the system to maintain reliable operation of the facilities within their control.

§ 824o(i)Savings provisions(1)–(4)

(a)(6)–(i) unchanged ·

(1) The ERO shall have authority to develop and enforce compliance with reliability standards for only the bulk-power system.

(2) This section does not authorize the ERO or the Commission to order the construction of additional generation [struck: or transmission ]capacity or to set and enforce compliance with standards for adequacy or safety of electric facilities or services.

(3) Nothing in this section shall be construed to preempt any authority of any State to take action to ensure the safety, adequacy, and reliability of electric service within that State, as long as such action is not inconsistent with any reliability standard, except that the State of New York may establish rules that result in greater reliability within that State, as long as such action does not result in lesser reliability outside the State than that provided by the reliability standards.

(4) Within 90 days of the application of the Electric Reliability Organization or other affected party, and after notice and opportunity for comment, the Commission shall issue a final order determining whether a State action is inconsistent with a reliability standard, taking into consideration any recommendation of the ERO.

Rest of § 824o unchanged ·

Step through the changes