Changes to 16 U.S.C. § 2621

H.R. 7977 · Energy Bills Relief Act ·

In committee · step 2 of 5

Sections are cited like “7 U.S.C. § 2012”: 7 of the , 2012.

16 U.S.C. § 2621 Consideration and determination respecting certain ratemaking standards

+42 −0Shown
More for 16 U.S.C. § 2621
Read § 2621
3 changes the bill asks for here, 3 carried out
  1. Carried out:

    Section 111(d) of the Public Utility Regulatory Policies Act of 1978 (16 U.S.C. 2621(d)) is amended by adding at the end the following:(22) Community solar programs.— (A) In general.— Each electric utility shall offer a community solar program that provides all ratepayers, including low-income ratepayers, equitable and demonstrable access to such community solar program. Such programs may include community …

  2. Carried out:

    Section 111(d) of the Public Utility Regulatory Policies Act of 1978 (16 U.S.C. 2621(d)) is amended by adding at the end the following:(22) Large load facility class.— (A) Classification.— Large load facilities shall be considered a class of electric consumers. (B) Cost recovery relating to large load facility class.— Each electric utility that provides electric service to a class of electric consumers …

    The section already has a provision under this letter or number, so it would have two.

  3. Carried out:

    Section 111 of the Public Utility Regulatory Policies Act of 1978 (16 U.S.C. 2621) is amended by adding at the end the following:(e) Definitions.— For the purposes of subsection (d): (1) Large load facility.— The term “large load facility”— (A) means a facility, or an aggregation of facilities at a single site, with respect to which the peak demand of such facility or such aggregation of facilities …

This bill puts a provision under a letter or number this section already uses, so the section would have two. The law has probably changed since the bill was written.

§ 2621(d)–(e)

Start of § 2621 to (d)(21)(B) unchanged

WhereMarkThe Code nowMarkAs the bill would leave it
(d)(21)(C)(C) (C)
accelerate third-party investment in electric vehicle charging for light-, medium-, and heavy-duty vehicles; andaccelerate third-party investment in electric vehicle charging for light-, medium-, and heavy-duty vehicles; and
(d)(21)(D)(D) (D)
appropriately recover the marginal costs of delivering electricity to electric vehicles and electric vehicle charging infrastructure.appropriately recover the marginal costs of delivering electricity to electric vehicles and electric vehicle charging infrastructure.
(d)(22)(22) [inserted: Community solar programs.—]
(d)(22)(A)(A) [inserted: In general.—]
[inserted: Each electric utility shall offer a community solar program that provides all ratepayers, including low-income ratepayers, equitable and demonstrable access to such community solar program. Such programs may include community solar facilities owned or operated by non-utility entities and shall not restrict participation to utility-owned facilities.]
(d)(22)(B)(B) [inserted: Definitions.—]
[inserted: For the purposes of this paragraph:]
(d)(22)(B)(i)(i) [inserted: Community solar program.—]
[inserted: The term “community solar program” means a service provided to any electric consumer that the electric utility serves through which the value of electricity generated by a community solar facility may be used to reduce total charges billed to the electric consumer.]
(d)(22)(B)(ii)(ii) [inserted: Community solar facility.—]
[inserted: The term “community solar facility” means a solar photovoltaic system that—]
(d)(22)(B)(ii)(I)(I) [inserted: ]
[inserted: allocates electricity to multiple electric consumers of an electric utility;]
(d)(22)(B)(ii)(II)(II) [inserted: ]
[inserted: is interconnected with the electric grid; and]
(d)(22)(B)(ii)(III)(III) [inserted: ]
[inserted: is located either on or off the property of the electric consumers described in subclause (I).]
(d)(22)(22) [inserted: Large load facility class.—]
(d)(22)(A)(A) [inserted: Classification.—]
[inserted: Large load facilities shall be considered a class of electric consumers.]
(d)(22)(B)(B) [inserted: Cost recovery relating to large load facility class.—]
[inserted: Each electric utility that provides electric service to a class of electric consumers described in subparagraph (A) shall fully recover from such class all costs associated with any upgrade made to the generation, transmission, or distribution facilities of the electric grid, including local facilities, in order to meet the demand for electric energy from such class, including in the event that a large load facility ceases operations or uses less electric energy than projected at the time of such upgrade.]
(d)(23)(23) [inserted: Grid reliability for large load facilities.—]
[inserted: Each electric utility shall prioritize, among requests from owners or operators of large load facilities for electric service, such a request under which the owner or operator agrees to employ—]
(d)(23)(A)(A) [inserted: ]
[inserted: features that reduce the demand for electric energy from the electric grid during times of peak demand, including—]
(d)(23)(A)(i)(i) [inserted: ]
[inserted: energy efficiency or energy conservation measures;]
(d)(23)(A)(ii)(ii) [inserted: ]
[inserted: onsite energy storage; or]
(d)(23)(A)(iii)(iii) [inserted: ]
[inserted: demand response or load flexibility technologies; and]
(d)(23)(B)(B) [inserted: ]
[inserted: zero-emission electric energy generated onsite or procured within the same balancing authority through a power purchase agreement to meet all of the demand of the large load facility for electric energy.]
(e)(e) [inserted: Definitions.—]
[inserted: For the purposes of subsection (d):]
(e)(1)(1) [inserted: Large load facility.—]
[inserted: The term “large load facility”—]
(e)(1)(A)(A) [inserted: ]
[inserted: means a facility, or an aggregation of facilities at a single site, with respect to which the peak demand of such facility or such aggregation of facilities exceeds 75 megawatts; and]
(e)(1)(B)(B) [inserted: ]
[inserted: does not include an existing facility with respect to which any increased demand is predominantly caused by electrification or measures to reduce greenhouse gas emissions.]
(e)(2)(2) [inserted: Zero-emission electric energy.—]
[inserted: The term “zero-emission electric energy” means electric energy generated without emitting greenhouse gases, including from solar, wind, geothermal, hydroelectric, tidal, fission, or fusion energy.]