Changes to the Code
H.R. 7977 · Energy Bills Relief Act · Introduced The text as a member of Congress first filed it. Most bills never get further than this.
In committee · step 2 of 5
7 U.S.C. § 8107a Rural energy savings program
22 changes the bill asks for here, 19 carried out
- Carried out:
in subparagraph (B), by striking
or
at the end; - Carried out:
by redesignating subparagraph (C) as subparagraph (D); and
- Carried out:
by inserting after subparagraph (B) the following:
(C) any Indian Tribe (as defined in section 4 of the Indian Self-Determination and Education Assistance Act (25 U.S.C. 5304));;
- Carried out:
in the subsection heading, by inserting
and grants
afterLoans
; - Carried out:
by striking paragraph (1) and inserting the following:
(1) In general.— Subject to the requirements of this subsection, the Secretary shall provide— (A) loans to eligible entities that agree to use the loan funds to make loans under subsection (d) to qualified consumers for the purpose of implementing energy efficiency measures; and …
- Carried out:
in the paragraph heading, by inserting
for loans
afterRequirements
; and - Carried out:
in subparagraph (A)(i), by striking
that is
; - Carried out:
by redesignating subparagraphs (A) and (B) as clauses (i) and (ii), respectively, and indenting the clauses appropriately;
- Not carried out:
in the matter preceding clause (i) (as so redesignated), by striking With respect to a loan under paragraph (1) and inserting the following:(A) In general.— Subject to subparagraph (B), with respect to a loan under paragraph (1)(A); and
§ 8107a(c)(5) already has provisions of its own, so its opening words can't simply become the first of them.
Technical detail
/us/usc/t7/s8107a/c/5 has provisions already, so its words can't become the first - Carried out:
by adding at the end the following:
(B) Extensions.— The Secretary may extend the term of a loan under subparagraph (A)(i), or the deadline for the repayment of an advance under subparagraph (A)(ii), as the Secretary determines to be appropriate.;
- Carried out:
in subparagraph (B), by striking
paragraph (1)
and insertingparagraph (1)(A)
; and - Carried out:
in subparagraph (C), in the matter preceding clause (i), by striking
Repayment of the special advance
and insertingSubject to an applicable extension under paragraph (5)(B), repayment of a special advance under this paragraph
; - Carried out:
in paragraph (8), by striking
paragraph (1)
and insertingparagraph (1)(A)
; and - Carried out:
by adding at the end the following:
(10) Grants.— (A) In general.— At the election of an eligible entity that receives a loan under this subsection, the Secretary shall provide to the eligible entity a grant to pay for a portion of the costs incurred in— (i) applying for the loan; (ii) making a loan to a qualified …
- Carried out:
in the matter preceding subparagraph (A), by inserting
or grant
beforefunds
; and - Not carried out:
by striking (B) shall finance and inserting the following:(B)(i) may have a term and amortization schedule the length of which is the useful life of the energy efficiency measures implemented using the loan, provided that the loan to the qualified consumer does not exceed 20 years; and (ii) shall finance; and
It replaces words with whole new provisions, a kind of change we can't show yet.
Technical detail
unsupported: strike text and insert levels in its place - Not carried out:
in clause (ii) (as so designated), by striking
a loan term of not more than 10 years
and insertingthe applicable loan term described in clause (i)
;The bill points to clause (ii) of § 8107a(d)(1)(B), which isn't there in the Code as we have it. It may have been renumbered or removed since the bill was drafted.
Technical detail
target not found: no clause (ii) in /us/usc/t7/s8107a/d/1/B - Carried out:
in the subsection heading, by inserting
outreach,
aftertraining,
; - Carried out:
in subparagraph (A), by striking
and technical assistance of the program
and insertingoutreach, and technical assistance relating to the program under this section
; and - Carried out:
in subparagraph (B)(ii), by inserting
, outreach,
aftertechnical assistance
; and - Carried out:
by adding at the end the following:
(3) Funding.— Of the amounts made available under subsection (i), the Secretary may use such sums as are necessary to provide outreach, training, and technical assistance under this subsection.; and
- Carried out:
in subsection (i), by striking
2023
and inserting2030
.
§ 8107a(b)–(c)
Start of § 8107a to (b)(1) unchanged
| Where | Mark | The Code now | Mark | As the bill would leave it |
|---|---|---|---|---|
| (b)(1)(A) | (A) | (A) | ||
| any public power district, public utility district, or similar entity, or any electric cooperative described in section 501(c)(12) or 1381(a)(2) of title 26, that borrowed and repaid, prepaid, or is paying an electric loan made or guaranteed by the Rural Utilities Service (or any predecessor agency); | any public power district, public utility district, or similar entity, or any electric cooperative described in section 501(c)(12) or 1381(a)(2) of title 26, that borrowed and repaid, prepaid, or is paying an electric loan made or guaranteed by the Rural Utilities Service (or any predecessor agency); | |||
| (b)(1)(B) | (B) | (B) | ||
| any entity primarily owned or controlled by 1 or more entities described in subparagraph (A); | any entity primarily owned or controlled by 1 or more entities described in subparagraph (A); | |||
| (b)(1)(C) | (C) [inserted: ] | |||
| [inserted: any Indian Tribe (as defined in section 4 of the Indian Self-Determination and Education Assistance Act (25 U.S.C. 5304));] | ||||
| (b)(1)(D) | [inserted: (D)] | |||
| any other entity that is an eligible borrower of the Rural Utilities Service, as determined under section 1710.101 of title 7, Code of Federal Regulations (or a successor regulation). | any other entity that is an eligible borrower of the Rural Utilities Service, as determined under section 1710.101 of title 7, Code of Federal Regulations (or a successor regulation). | |||
| (b)(2) | (2) Energy efficiency measures | (2) Energy efficiency measures | ||
| The term “energy efficiency measures” means, for or at property served by an eligible entity, structural improvements and investments in cost-effective, commercial technologies to increase energy efficiency (including cost-effective on- or off-grid renewable energy or energy storage systems). | The term “energy efficiency measures” means, for or at property served by an eligible entity, structural improvements and investments in cost-effective, commercial technologies to increase energy efficiency (including cost-effective on- or off-grid renewable energy or energy storage systems). | |||
| (b)(3) | (3) Qualified consumer | (3) Qualified consumer | ||
| The term “qualified consumer” means a consumer served by an eligible entity that has the ability to repay a loan made under subsection (d), as determined by the eligible entity. | The term “qualified consumer” means a consumer served by an eligible entity that has the ability to repay a loan made under subsection (d), as determined by the eligible entity. | |||
| (b)(4) | (4) Secretary | (4) Secretary | ||
| The term “Secretary” means the Secretary of Agriculture, acting through the Administrator of the Rural Utilities Service. | The term “Secretary” means the Secretary of Agriculture, acting through the Administrator of the Rural Utilities Service. | |||
| (c) | (c) Loans to eligible entities | (c) Loans [inserted: and grants ]to eligible entities | ||
| (c)(1) | (1) In general | (1) In general[inserted: .—] | ||
| [inserted: Subject to the requirements of this subsection, the Secretary shall provide—] | ||||
| (c)(1)(A) | (A) [inserted: ] | |||
| [inserted: loans to eligible entities that agree to use the loan funds to make loans under subsection (d) to qualified consumers for the purpose of implementing energy efficiency measures; and] | ||||
| (c)(1)(B) | (B) [inserted: ] | |||
| [inserted: at the election of any eligible entity that receives a loan under subparagraph (A), a grant in accordance with paragraph (10).] | ||||
| (c)(1) | ||||
| (c)(2) | (2) Requirements | (2) Requirements[inserted: for loans] | ||
| (c)(2)(A) | (A) In general | (A) In general | ||
| As a condition of receiving a loan under this subsection, an eligible entity shall— | As a condition of receiving a loan under this subsection, an eligible entity shall— | |||
| (c)(2)(A)(i) | (i) | (i) | ||
| establish a list of energy efficiency measures | establish a list of energy efficiency measures expected to decrease energy use or costs of qualified consumers; | |||
| (c)(2)(A)(ii) | (ii) | (ii) | ||
| prepare an implementation plan for use of the loan funds, including use of any interest to be received pursuant to subsection (d)(1)(A); | prepare an implementation plan for use of the loan funds, including use of any interest to be received pursuant to subsection (d)(1)(A); | |||
| (c)(2)(A)(iii) | (iii) | (iii) | ||
| provide for appropriate measurement and verification to ensure— | provide for appropriate measurement and verification to ensure— | |||
§ 8107a(c)–(d)
(c)(2)(A)(iii)(I)–(3) unchanged
| Where | Mark | The Code now | Mark | As the bill would leave it |
|---|---|---|---|---|
| (c)(4) | (4) Eligibility for other loans | (4) Eligibility for other loans | ||
| The Secretary shall not include any debt incurred by a borrower under this section in the calculation of the debt-equity ratio of the borrower for purposes of eligibility for loans under the Rural Electrification Act of 1936 (7 U.S.C. 901 et seq.). | The Secretary shall not include any debt incurred by a borrower under this section in the calculation of the debt-equity ratio of the borrower for purposes of eligibility for loans under the Rural Electrification Act of 1936 (7 U.S.C. 901 et seq.). | |||
| (c)(5) | (5) Repayment | (5) Repayment | ||
| With respect to a loan under paragraph (1)— | With respect to a loan under paragraph (1)— | |||
| (c)(5)(i) | [inserted: (i)] | |||
| the term shall not exceed 20 years from the date on which the loan is closed; and | the term shall not exceed 20 years from the date on which the loan is closed; and | |||
| (c)(5)(ii) | [inserted: (ii)] | |||
| except as provided in paragraph (7), the repayment of each advance shall be amortized for a period not to exceed 10 years. | except as provided in paragraph (7), the repayment of each advance shall be amortized for a period not to exceed 10 years. | |||
| (c)(5)(B) | (B) [inserted: Extensions.—] | |||
| [inserted: The Secretary may extend the term of a loan under subparagraph (A)(i), or the deadline for the repayment of an advance under subparagraph (A)(ii), as the Secretary determines to be appropriate.] | ||||
| (c)(6) | (6) Amount of advances | (6) Amount of advances | ||
| Any advance of loan funds to an eligible entity in any single year shall not exceed 50 percent of the approved loan amount. | Any advance of loan funds to an eligible entity in any single year shall not exceed 50 percent of the approved loan amount. | |||
| (c)(7) | (7) Special advance for start-up activities | (7) Special advance for start-up activities | ||
| (c)(7)(A) | (A) In general | (A) In general | ||
| In order to assist an eligible entity in defraying the appropriate start-up costs (as determined by the Secretary) of establishing new programs or modifying existing programs to carry out subsection (d), the Secretary shall allow an eligible entity to request a special advance. | In order to assist an eligible entity in defraying the appropriate start-up costs (as determined by the Secretary) of establishing new programs or modifying existing programs to carry out subsection (d), the Secretary shall allow an eligible entity to request a special advance. | |||
| (c)(7)(B) | (B) Amount | (B) Amount | ||
| No eligible entity may receive a special advance under this paragraph for an amount that is greater than 4 percent of the loan amount received by the eligible entity under paragraph (1). | No eligible entity may receive a special advance under this paragraph for an amount that is greater than 4 percent of the loan amount received by the eligible entity under paragraph (1)[inserted: (A)]. | |||
| (c)(7)(C) | (C) Repayment | (C) Repayment | ||
| [inserted: Subject] [inserted: to an applicable extension under paragraph (5)(B), repayment ]of [inserted: a] special advance[inserted: under this paragraph]— | ||||
| (c)(7)(C)(i) | (i) | (i) | ||
| shall be required during the 10-year period beginning on the date on which the special advance is made; and | shall be required during the 10-year period beginning on the date on which the special advance is made; and | |||
| (c)(7)(C)(ii) | (ii) | (ii) | ||
| at the election of the eligible entity, may be deferred to the end of the 10-year period. | at the election of the eligible entity, may be deferred to the end of the 10-year period. | |||
| (c)(8) | (8) Limitation | (8) Limitation | ||
| All special advances shall be made under a loan described in paragraph (1) during the first 10 years of the term of the loan. | All special advances shall be made under a loan described in paragraph (1)[inserted: (A)] during the first 10 years of the term of the loan. | |||
| (c)(9) | (9) Accounting | (9) Accounting | ||
| The Secretary shall take appropriate steps to streamline the accounting requirements on borrowers under this section while maintaining adequate assurances of the repayment of the loans. | The Secretary shall take appropriate steps to streamline the accounting requirements on borrowers under this section while maintaining adequate assurances of the repayment of the loans. | |||
| (c)(10) | (10) [inserted: Grants.—] | |||
| (c)(10)(A) | (A) [inserted: In general.—] | |||
| [inserted: At the election of an eligible entity that receives a loan under this subsection, the Secretary shall provide to the eligible entity a grant to pay for a portion of the costs incurred in—] | ||||
| (c)(10)(A)(i) | (i) [inserted: ] | |||
| [inserted: applying for the loan;] | ||||
| (c)(10)(A)(ii) | (ii) [inserted: ] | |||
| [inserted: making a loan to a qualified consumer under subsection (d);] | ||||
| (c)(10)(A)(iii) | (iii) [inserted: ] | |||
| [inserted: making repairs to the property of a qualified consumer that facilitate the energy efficiency measures for the property financed through a loan provided to the qualified consumer under subsection (d);] | ||||
| (c)(10)(A)(iv) | (iv) [inserted: ] | |||
| [inserted: entering into a contract under subsection (e); or] | ||||
| (c)(10)(A)(v) | (v) [inserted: ] | |||
| [inserted: carrying out any other duties of the eligible entity under this section.] | ||||
| (c)(10)(B) | (B) [inserted: Amount.—] | |||
| (c)(10)(B)(i) | (i) [inserted: In general.—] | |||
| [inserted: Except as provided in clause (ii), the amount of a grant provided to an eligible entity under this paragraph shall be equal to not more than 5 percent of the amount of the loan provided to the eligible entity under this subsection.] | ||||
| (c)(10)(B)(ii) | (ii) [inserted: Persistent poverty counties.—] | |||
| [inserted: The amount of a grant provided under this paragraph to an eligible entity that will use the grant to make loans under subsection (d) to qualified consumers located in a persistent poverty county (as determined by the Secretary) shall be equal to 10 percent of the amount of the loan provided to the eligible entity under this subsection.] | ||||
| (d) | (d) Loans to qualified consumers | (d) Loans to qualified consumers | ||
| (d)(1) | (1) Terms of loans | (1) Terms of loans | ||
| Loans made by an eligible entity to qualified consumers using loan funds provided by the Secretary under subsection (c)— | Loans made by an eligible entity to qualified consumers using loan [inserted: or grant ]funds provided by the Secretary under subsection (c)— | |||
| (d)(1)(A) | (A) | (A) | ||
| may bear interest, not to exceed 5 percent, to be used for purposes that include— | may bear interest, not to exceed 5 percent, to be used for purposes that include— | |||
| (d)(1)(A)(i) | (i) | (i) | ||
| to establish a loan loss reserve; and | to establish a loan loss reserve; and | |||
§ 8107a(d)–(g)
(d)(1)(A)(ii)–(D)(ii) unchanged
| Where | Mark | The Code now | Mark | As the bill would leave it |
|---|---|---|---|---|
| (d)(1)(E) | (E) | (E) | ||
| shall require an energy audit by an eligible entity to determine the impact of proposed energy efficiency measures on the energy costs and consumption of the qualified consumer. | shall require an energy audit by an eligible entity to determine the impact of proposed energy efficiency measures on the energy costs and consumption of the qualified consumer. | |||
| (d)(2) | (2) Contractors | (2) Contractors | ||
| In addition to any other qualified general contractor, eligible entities may serve as general contractors. | In addition to any other qualified general contractor, eligible entities may serve as general contractors. | |||
| (e) | (e) Contract for measurement and verification, training, and technical assistance | (e) Contract for measurement and verification, training, [inserted: outreach, ]and technical assistance | ||
| (e)(1) | (1) In general | (1) In general | ||
| Not later than 90 days after February 7, 2014, the Secretary— | Not later than 90 days after February 7, 2014, the Secretary— | |||
| (e)(1)(A) | (A) | (A) | ||
| shall establish a plan for measurement and verification, training, and technical assistance | shall establish a plan for measurement and verification, training, [inserted: outreach, ]and technical assistance [inserted: relating] [inserted: to ]the program[inserted: under this section]; and | |||
| (e)(1)(B) | (B) | (B) | ||
| may enter into 1 or more contracts with a qualified entity for the purposes of— | may enter into 1 or more contracts with a qualified entity for the purposes of— | |||
| (e)(1)(B)(i) | (i) | (i) | ||
| providing measurement and verification activities; and | providing measurement and verification activities; and | |||
| (e)(1)(B)(ii) | (ii) | (ii) | ||
| developing a program to provide technical assistance and training to the employees of eligible entities to carry out this section. | developing a program to provide technical assistance[inserted: ,] [inserted: outreach, ]and training to the employees of eligible entities to carry out this section. | |||
| (e)(2) | (2) Use of subcontractors authorized | (2) Use of subcontractors authorized | ||
| A qualified entity that enters into a contract under paragraph (1) may use subcontractors to assist the qualified entity in carrying out the contract. | A qualified entity that enters into a contract under paragraph (1) may use subcontractors to assist the qualified entity in carrying out the contract. | |||
| (e)(3) | (3) [inserted: Funding.—] | |||
| [inserted: Of the amounts made available under subsection (i), the Secretary may use such sums as are necessary to provide outreach, training, and technical assistance under this subsection.] | ||||
| (f) | (f) Additional authority | (f) Additional authority | ||
| The authority provided in this section is in addition to any other authority of the Secretary to offer loans under any other law. | The authority provided in this section is in addition to any other authority of the Secretary to offer loans under any other law. | |||
| (g) | (g) Effective period | (g) Effective period | ||
| Subject to the availability of funds and except as otherwise provided in this section, the loans and other expenditures required to be made under this section shall be available until expended, with the Secretary authorized to make new loans as loans are repaid. | Subject to the availability of funds and except as otherwise provided in this section, the loans and other expenditures required to be made under this section shall be available until expended, with the Secretary authorized to make new loans as loans are repaid. | |||
§ 8107a(h)–(i)
(h) unchanged
| Where | Mark | The Code now | Mark | As the bill would leave it |
|---|---|---|---|---|
| (h)(3) | (3) | (3) | ||
| the recipients of the loans described in paragraph (2). | the recipients of the loans described in paragraph (2). | |||
| (i) | (i) Authorization of appropriations | (i) Authorization of appropriations | ||
| There is authorized to be appropriated to carry out this section $75,000,000 for each of fiscal years 2014 through | There is authorized to be appropriated to carry out this section $75,000,000 for each of fiscal years 2014 through [inserted: 2030]. |
15 U.S.C. § 717b Exportation or importation of natural gas; LNG terminals
6 changes the bill asks for here, 6 carried out
- Carried out:
Section 3 of the Natural Gas Act (15 U.S.C. 717b) is amended by adding at the end the following:
(g) Exportation of natural gas.— (1) Order required.— No person shall export any natural gas from the United States to a foreign country without first having secured an order of the Secretary of Energy authorizing it to do so. The Secretary of Energy may issue such order upon …
- Carried out:
by striking
export any natural gas from the United States to a foreign country or
; - Carried out:
by inserting
to the United States
afterfrom a foreign country
; and - Carried out:
by striking
exportation or
; and - Carried out:
by striking
, or the exportation of natural gas to a nation with which there is in effect a free trade agreement requiring national treatment for trade in natural gas,
; and - Carried out:
by striking
or exportation
.
§ 717b(a)–(d)
| Where | Mark | The Code now | Mark | As the bill would leave it |
|---|---|---|---|---|
| § 717b. Exportation or importation of natural gas; LNG terminals | § 717b. Exportation or importation of natural gas; LNG terminals | |||
| (a) | (a) Mandatory authorization order | (a) Mandatory authorization order | ||
| After six months from June 21, 1938, no person shall | After six months from June 21, 1938, no person shall [inserted: import] any natural gas from a foreign country [inserted: to] [inserted: the] [inserted: United] [inserted: States] without first having secured an order of the Commission authorizing it to do so. The Commission shall issue such order upon application, unless, after opportunity for hearing, it finds that the proposed importation will not be consistent with the public interest. The Commission may by its order grant such application, in whole or in part, with such modification and upon such terms and conditions as the Commission may find necessary or appropriate, and may from time to time, after opportunity for hearing, and for good cause shown, make such supplemental order in the premises as it may find necessary or appropriate. | |||
| (b) | (b) Free trade agreements | (b) Free trade agreements | ||
| With respect to natural gas which is imported into the United States from a nation with which there is in effect a free trade agreement requiring national treatment for trade in natural gas, and with respect to liquefied natural gas— | With respect to natural gas which is imported into the United States from a nation with which there is in effect a free trade agreement requiring national treatment for trade in natural gas, and with respect to liquefied natural gas— | |||
| (b)(1) | (1) | (1) | ||
| the importation of such natural gas shall be treated as a “first sale” within the meaning of section 3301(21) of this title; and | the importation of such natural gas shall be treated as a “first sale” within the meaning of section 3301(21) of this title; and | |||
| (b)(2) | (2) | (2) | ||
| the Commission shall not, on the basis of national origin, treat any such imported natural gas on an unjust, unreasonable, unduly discriminatory, or preferential basis. | the Commission shall not, on the basis of national origin, treat any such imported natural gas on an unjust, unreasonable, unduly discriminatory, or preferential basis. | |||
| (c) | (c) Expedited application and approval process | (c) Expedited application and approval process | ||
| For purposes of subsection (a), the importation of the natural gas referred to in subsection (b) | For purposes of subsection (a), the importation of the natural gas referred to in subsection (b) shall be deemed to be consistent with the public interest, and applications for such importation shall be granted without modification or delay. | |||
| (d) | (d) Construction with other laws | (d) Construction with other laws | ||
| Except as specifically provided in this chapter, nothing in this chapter affects the rights of States under— | Except as specifically provided in this chapter, nothing in this chapter affects the rights of States under— | |||
| (d)(1) | (1) | (1) | ||
| the Coastal Zone Management Act of 1972 (16 U.S.C. 1451 et seq.); | the Coastal Zone Management Act of 1972 (16 U.S.C. 1451 et seq.); |
§ 717b(f)–(g)
(d)(2)–(f)(1) unchanged
| Where | Mark | The Code now | Mark | As the bill would leave it |
|---|---|---|---|---|
| (f)(2) | (2) | (2) | ||
| The Commission shall enter into a memorandum of understanding with the Secretary of Defense for the purpose of ensuring that the Commission coordinate and consult2 with the Secretary of Defense on the siting, construction, expansion, or operation of liquefied natural gas facilities that may affect an active military installation. | The Commission shall enter into a memorandum of understanding with the Secretary of Defense for the purpose of ensuring that the Commission coordinate and consult2 with the Secretary of Defense on the siting, construction, expansion, or operation of liquefied natural gas facilities that may affect an active military installation. | |||
| (f)(3) | (3) | (3) | ||
| The Commission shall obtain the concurrence of the Secretary of Defense before authorizing the siting, construction, expansion, or operation of liquefied natural gas facilities affecting the training or activities of an active military installation. | The Commission shall obtain the concurrence of the Secretary of Defense before authorizing the siting, construction, expansion, or operation of liquefied natural gas facilities affecting the training or activities of an active military installation. | |||
| (g) | (g) [inserted: Exportation of natural gas.—] | |||
| (g)(1) | (1) [inserted: Order required.—] | |||
| [inserted: No person shall export any natural gas from the United States to a foreign country without first having secured an order of the Secretary of Energy authorizing it to do so. The Secretary of Energy may issue such order upon application only if, after opportunity for hearing, the Secretary of Energy finds that the proposed exportation will be consistent with the public interest. The Secretary of Energy may by its order grant such application, in whole or in part, with such modification and upon such terms and conditions as the Secretary of Energy may find necessary or appropriate, and may from time to time, after opportunity for hearing, and for good cause shown, issue such supplemental order for such exportation as it may find necessary or appropriate.] | ||||
| (g)(2) | (2) [inserted: Deadline.—] | |||
| [inserted: The Secretary of Energy shall find whether proposed exportation of natural gas will be consistent with the public interest under paragraph (1) by not later than the date that is 1 year after the later of—] | ||||
| (g)(2)(A) | (A) [inserted: ] | |||
| [inserted: the date on which the Secretary of Energy receives the final environmental impact statement for such proposed exportation from the Federal Energy Regulatory Commission; and] | ||||
| (g)(2)(B) | (B) [inserted: ] | |||
| [inserted: the date on which the Secretary completes each assessment required by paragraph (4).] | ||||
| (g)(3) | (3) [inserted: Public interest finding.—] | |||
| [inserted: The Secretary of Energy may find that proposed exportation of natural gas for which an application is submitted under paragraph (1) will be consistent with the public interest under such paragraph only if the Secretary of Energy determines, based on the applicable assessment under paragraph (4), that the proposed exportation of natural gas will not be likely to—] | ||||
| (g)(3)(A) | (A) [inserted: ] | |||
| [inserted: significantly contribute to climate change, including by slowing the global energy transition needed to achieve deep reductions of global greenhouse gas emissions within the next decade and net-zero global greenhouse gas emissions not later than 2050;] | ||||
| (g)(3)(B) | (B) [inserted: ] | |||
| [inserted: materially increase energy prices or energy price volatility for any segment of United States consumers; or] | ||||
| (g)(3)(C) | (C) [inserted: ] | |||
| [inserted: create a disproportionate cumulative burden of adverse human or environmental impacts on Tribes and communities with environmental justice concerns, including in rural and urban low-income areas.] | ||||
| (g)(4) | (4) [inserted: Assessments.—] | |||
| (g)(4)(A) | (A) [inserted: Climate change assessment.—] | |||
| [inserted: A determination under paragraph (3)(A) shall be based on an assessment of the expected impact of the proposed exportation of natural gas on climate change. Such assessment shall be based on the latest scientific information and use the 20-year global warming potential of methane, and shall include—] | ||||
| (g)(4)(A)(i) | (i) [inserted: ] | |||
| [inserted: quantified estimates of the greenhouse gas emissions associated with the full lifecycle of the natural gas proposed for exportation, including emissions associated with the extraction, transportation, liquefaction, storage, regasification, and consumption of such natural gas;] | ||||
| (g)(4)(A)(ii) | (ii) [inserted: ] | |||
| [inserted: a comparison of the estimated greenhouse gas emissions in clause (i) to a baseline that is consistent with the need to achieve deep reductions of global greenhouse gas emissions within the next decade and deep decarbonization pathways toward net-zero global greenhouse gas emissions not later than 2050;] | ||||
| (g)(4)(A)(iii) | (iii) [inserted: ] | |||
| [inserted: an assessment of the potential effects of the proposed exportation of natural gas on clean energy alternatives, including—] | ||||
| (g)(4)(A)(iii)(I) | (I) [inserted: ] | |||
| [inserted: any decrease in global investment in and deployment of renewable energy, electrification, and energy efficiency and conservation technologies; and] | ||||
| (g)(4)(A)(iii)(II) | (II) [inserted: ] | |||
| [inserted: any decrease in United States exports of clean energy technologies;] | ||||
| (g)(4)(A)(iv) | (iv) [inserted: ] | |||
| [inserted: quantified estimates of the social cost of the estimated greenhouse gas emissions in clause (i); and] | ||||
| (g)(4)(A)(v) | (v) [inserted: ] | |||
| [inserted: an identification of the extent to which climate change is accelerating the loss of economic value in the United States and, separately, in other countries, due to rising sea levels, more intense storms, eroding coasts, increased risk and severity of wildfires, and other impacts associated with climate change.] | ||||
| (g)(4)(B) | (B) [inserted: Economic assessment.—] | |||
| [inserted: A determination under paragraph (3)(B) shall be based on an assessment of the expected economic impact of the proposed exportation of natural gas, including an assessment of the impact of the proposed exportation on all United States consumers, with specific estimates regarding each of the following consumer subgroups:] | ||||
| (g)(4)(B)(i) | (i) [inserted: ] | |||
| [inserted: Low-income consumers.] | ||||
| (g)(4)(B)(ii) | (ii) [inserted: ] | |||
| [inserted: Working families.] | ||||
| (g)(4)(B)(iii) | (iii) [inserted: ] | |||
| [inserted: Small businesses.] | ||||
| (g)(4)(B)(iv) | (iv) [inserted: ] | |||
| [inserted: Manufacturers.] | ||||
| (g)(4)(B)(v) | (v) [inserted: ] | |||
| [inserted: State, Tribal, and local governments.] | ||||
| (g)(4)(B)(vi) | (vi) [inserted: ] | |||
| [inserted: Producers and users of fertilizer.] | ||||
| (g)(4)(B)(vii) | (vii) [inserted: ] | |||
| [inserted: Facilities with high electricity demand, including data centers.] | ||||
| (g)(4)(C) | (C) [inserted: Environmental justice assessment.—] | |||
| [inserted: A determination under paragraph (3)(C) shall be based on an assessment of the expected impact of the proposed exportation of natural gas on environmental justice (which shall be consistent with Executive Order 14096 (42 U.S.C. 4321 note; relating to revitalizing our Nation's commitment to environmental justice for all), as published April 21, 2023), including assessments of impacts on—] | ||||
| (g)(4)(C)(i) | (i) [inserted: ] | |||
| [inserted: the preexisting cumulative environmental burdens and social and health risks posed to Tribes and communities with environmental justice concerns, including in rural and urban low-income areas;] | ||||
| (g)(4)(C)(ii) | (ii) [inserted: ] | |||
| [inserted: local fisheries and the economic livelihood of the people employed by local fisheries;] | ||||
| (g)(4)(C)(iii) | (iii) [inserted: ] | |||
| [inserted: racial and socioeconomic disparities in impacted communities; and] | ||||
| (g)(4)(C)(iv) | (iv) [inserted: ] | |||
| [inserted: compliance with civil rights laws.] | ||||
| (g)(5) | (5) [inserted: Public participation.—] | |||
| [inserted: The Secretary of Energy shall—] | ||||
| (g)(5)(A) | (A) [inserted: ] | |||
| [inserted: provide to the public an opportunity to meaningfully participate, including by providing comments, in—] | ||||
| (g)(5)(A)(i) | (i) [inserted: ] | |||
| [inserted: the finding of the Secretary of Energy on whether proposed exportation will be consistent with the public interest under paragraph (1); and] | ||||
| (g)(5)(A)(ii) | (ii) [inserted: ] | |||
| [inserted: any study by the Department of Energy intended to inform such finding; and] | ||||
| (g)(5)(B) | (B) [inserted: ] | |||
| [inserted: ensure that opportunities to meaningfully participate under subparagraph (A) address barriers that affect members of communities with environmental justice concerns, including those related to disability, language access, and lack of resources.] | ||||
| (g)(6) | (6) [inserted: Major Federal action.—] | |||
| [inserted: Issuing an order authorizing the exportation of natural gas under this subsection shall be considered a major Federal action under section 102(2)(C) of the National Environmental Policy Act of 1969 (42 U.S.C. 4332(2)(C)).] | ||||
15 U.S.C. § 717n Process coordination; hearings; rules of procedure
1 change the bill asks for here, 1 carried out
- Carried out:
Section 15(b)(1) of the Natural Gas Act (15 U.S.C. 717n(b)(1)) is amended by striking
Commission
and insertingFederal Energy Regulatory Commission
.
§ 717n(a)–(c)
Start of § 717n to (a)(1) unchanged
| Where | Mark | The Code now | Mark | As the bill would leave it |
|---|---|---|---|---|
| (a)(2) | (2) | (2) | ||
| includes any permits, special use authorizations, certifications, opinions, or other approvals as may be required under Federal law with respect to an application for authorization under section 717b of this title or a certificate of public convenience and necessity under section 717f of this title. | includes any permits, special use authorizations, certifications, opinions, or other approvals as may be required under Federal law with respect to an application for authorization under section 717b of this title or a certificate of public convenience and necessity under section 717f of this title. | |||
| (b) | (b) Designation as lead agency | (b) Designation as lead agency | ||
| (b)(1) | (1) In general | (1) In general | ||
| The Commission shall act as the lead agency for the purposes of coordinating all applicable Federal authorizations and for the purposes of complying with the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.). | The [inserted: Federal Energy Regulatory ]Commission shall act as the lead agency for the purposes of coordinating all applicable Federal authorizations and for the purposes of complying with the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.). | |||
| (b)(2) | (2) Other agencies | (2) Other agencies | ||
| Each Federal and State agency considering an aspect of an application for Federal authorization shall cooperate with the Commission and comply with the deadlines established by the Commission. | Each Federal and State agency considering an aspect of an application for Federal authorization shall cooperate with the Commission and comply with the deadlines established by the Commission. | |||
| (c) | (c) Schedule | (c) Schedule |
Rest of § 717n unchanged
15 U.S.C. § 717s Enforcement of chapter
3 changes the bill asks for here, 3 carried out
- Carried out:
in the matter preceding paragraph (1), by striking
individual
and insertingperson
; - Carried out:
in paragraph (1), by inserting
with respect to a person who is an individual,
beforeacting
; and - Carried out:
in paragraph (2), in the matter preceding subparagraph (A), by inserting
, directly or indirectly,
afterengaging
.
§ 717s(c)–(d)
Start of § 717s to (b) unchanged
| Where | Mark | The Code now | Mark | As the bill would leave it |
|---|---|---|---|---|
| (c) | (c) Employment of attorneys by Commission | (c) Employment of attorneys by Commission | ||
| The Commission may employ such attorneys as it finds necessary for proper legal aid and service of the Commission or its members in the conduct of their work, or for proper representation of the public interest in investigations made by it, or cases or proceedings pending before it, whether at the Commission’s own instance or upon complaint, or to appear for or represent the Commission in any case in court; and the expenses of such employment shall be paid out of the appropriation for the Commission. | The Commission may employ such attorneys as it finds necessary for proper legal aid and service of the Commission or its members in the conduct of their work, or for proper representation of the public interest in investigations made by it, or cases or proceedings pending before it, whether at the Commission’s own instance or upon complaint, or to appear for or represent the Commission in any case in court; and the expenses of such employment shall be paid out of the appropriation for the Commission. | |||
| (d) | (d) Violation of market manipulation provisions | (d) Violation of market manipulation provisions | ||
| In any proceedings under subsection (a), the court may prohibit, conditionally or unconditionally, and permanently or for such period of time as the court determines, any | In any proceedings under subsection (a), the court may prohibit, conditionally or unconditionally, and permanently or for such period of time as the court determines, any [inserted: person] who is engaged or has engaged in practices constituting a violation of section 717c–1 of this title (including related rules and regulations) from— | |||
| (d)(1) | (1) | (1) | ||
| acting as an officer or director of a natural gas company; or | [inserted: with respect to a person who is an individual, ]acting as an officer or director of a natural gas company; or | |||
| (d)(2) | (2) | (2) | ||
| engaging in the business of— | engaging[inserted: ,] [inserted: directly or indirectly, ]in the business of— | |||
| (d)(2)(A) | (A) | (A) | ||
| the purchasing or selling of natural gas; or | the purchasing or selling of natural gas; or | |||
| (d)(2)(B) | (B) | (B) | ||
| the purchasing or selling of transmission services subject to the jurisdiction of the Commission. | the purchasing or selling of transmission services subject to the jurisdiction of the Commission. |
15 U.S.C. § 717t–1 Civil penalty authority
1 change the bill asks for here, 1 carried out
- Carried out:
Section 22 of the Natural Gas Act (15 U.S.C. 717t–1) is amended by adding at the end the following:
(d) Prohibition or suspension for violations.— The Commission may prohibit, conditionally or unconditionally, permanently or for such period of time as the Commission determines to be appropriate, any person who is engaged or has engaged in practices constituting a violation of …
§ 717t–1(a)–(d)
| Where | Mark | The Code now | Mark | As the bill would leave it |
|---|---|---|---|---|
| § 717t–1. Civil penalty authority | § 717t–1. Civil penalty authority | |||
| (a) | (a) In general | (a) In general | ||
| Any person that violates this chapter, or any rule, regulation, restriction, condition, or order made or imposed by the Commission under authority of this chapter, shall be subject to a civil penalty of not more than $1,000,000 per day per violation for as long as the violation continues. | Any person that violates this chapter, or any rule, regulation, restriction, condition, or order made or imposed by the Commission under authority of this chapter, shall be subject to a civil penalty of not more than $1,000,000 per day per violation for as long as the violation continues. | |||
| (b) | (b) Notice | (b) Notice | ||
| The penalty shall be assessed by the Commission after notice and opportunity for public hearing. | The penalty shall be assessed by the Commission after notice and opportunity for public hearing. | |||
| (c) | (c) Amount | (c) Amount | ||
| In determining the amount of a proposed penalty, the Commission shall take into consideration the nature and seriousness of the violation and the efforts to remedy the violation. | In determining the amount of a proposed penalty, the Commission shall take into consideration the nature and seriousness of the violation and the efforts to remedy the violation. | |||
| (d) | (d) [inserted: Prohibition or suspension for violations.—] | |||
| [inserted: The Commission may prohibit, conditionally or unconditionally, permanently or for such period of time as the Commission determines to be appropriate, any person who is engaged or has engaged in practices constituting a violation of section 4A or 4B (including related rules and regulations) from engaging, directly or indirectly, in the business of purchasing or selling—] | ||||
| (d)(1) | (1) [inserted: ] | |||
| [inserted: natural gas; or] | ||||
| (d)(2) | (2) [inserted: ] | |||
| [inserted: transmission services subject to the jurisdiction of the Commission.] | ||||
16 U.S.C. § 796 Definitions
1 change the bill asks for here, 1 carried out
- Carried out:
Section 3 of the Federal Power Act (16 U.S.C. 796) is amended by adding at the end the following:
(30) Energy storage project.— The term “energy storage project” means equipment that receives, stores, and delivers energy-using batteries, compressed air, pumped hydropower, hydrogen storage (including hydrolysis), thermal energy storage, regenerative fuel cells, flywheels, …
§ 796(28)–(40)
Start of § 796 to (28)(A) unchanged
| Where | Mark | The Code now | Mark | As the bill would leave it |
|---|---|---|---|---|
| (28)(B) | (B) | (B) | ||
| to ensure nondiscriminatory access to the facilities.3 | to ensure nondiscriminatory access to the facilities.3 | |||
| (29) | (29) Transmission organization.— | (29) Transmission organization.— | ||
| The term “Transmission Organization” means a Regional Transmission Organization, Independent System Operator, independent transmission provider, or other transmission organization finally approved by the Commission for the operation of transmission facilities. | The term “Transmission Organization” means a Regional Transmission Organization, Independent System Operator, independent transmission provider, or other transmission organization finally approved by the Commission for the operation of transmission facilities. | |||
| (30) | (30) [inserted: Energy storage project.—] | |||
| [inserted: The term “energy storage project” means equipment that receives, stores, and delivers energy-using batteries, compressed air, pumped hydropower, hydrogen storage (including hydrolysis), thermal energy storage, regenerative fuel cells, flywheels, capacitors, superconducting magnets, or other technologies identified by the Secretary of Energy.] | ||||
| (31) | (31) [inserted: Generating facility.—] | |||
| [inserted: The term “generating facility” means any facility that generates electricity.] | ||||
| (32) | (32) [inserted: Generator tie line.—] | |||
| [inserted: The term “generator tie line” means a dedicated transmission line that is used to transmit power from a generating facility or an energy storage project to a transmission facility or a transmission system.] | ||||
| (33) | (33) [inserted: Greenhouse gas.—] | |||
| [inserted: The term “greenhouse gas” includes each of the following:] | ||||
| (33)(A) | (A) [inserted: ] | |||
| [inserted: Carbon dioxide.] | ||||
| (33)(B) | (B) [inserted: ] | |||
| [inserted: Methane.] | ||||
| (33)(C) | (C) [inserted: ] | |||
| [inserted: Nitrous oxide.] | ||||
| (33)(D) | (D) [inserted: ] | |||
| [inserted: Sulfur hexafluoride.] | ||||
| (33)(E) | (E) [inserted: ] | |||
| [inserted: Any hydrofluorocarbon.] | ||||
| (33)(F) | (F) [inserted: ] | |||
| [inserted: Any perfluorocarbon.] | ||||
| (33)(G) | (G) [inserted: ] | |||
| [inserted: Nitrogen trifluoride.] | ||||
| (33)(H) | (H) [inserted: ] | |||
| [inserted: Any fully fluorinated linear, branched, or cyclic—] | ||||
| (33)(H)(i) | (i) [inserted: ] | |||
| [inserted: alkane;] | ||||
| (33)(H)(ii) | (ii) [inserted: ] | |||
| [inserted: ether;] | ||||
| (33)(H)(iii) | (iii) [inserted: ] | |||
| [inserted: tertiary amine; or] | ||||
| (33)(H)(iv) | (iv) [inserted: ] | |||
| [inserted: aminoether.] | ||||
| (33)(I) | (I) [inserted: ] | |||
| [inserted: Any perfluoropolyether.] | ||||
| (33)(J) | (J) [inserted: ] | |||
| [inserted: Any hydrofluoropolyether.] | ||||
| (33)(K) | (K) [inserted: ] | |||
| [inserted: Any other fluorocarbon, except for a fluorocarbon with a vapor pressure of less than 1 mm of Hg absolute at 25 degrees Celsius.] | ||||
| (34) | (34) [inserted: Advanced transmission technology.—] | |||
| [inserted: The term “advanced transmission technology” means any hardware or software that—] | ||||
| (34)(A) | (A) [inserted: ] | |||
| [inserted: increases the capacity, efficiency, reliability, resilience, or safety of transmission facilities and transmission technologies;] | ||||
| (34)(B) | (B) [inserted: ] | |||
| [inserted: is installed in addition to new or existing transmission facilities and transmission technologies—] | ||||
| (34)(B)(i) | (i) [inserted: ] | |||
| [inserted: to give operators of the transmission facilities and transmission technologies more situational awareness and control over the electric grid;] | ||||
| (34)(B)(ii) | (ii) [inserted: ] | |||
| [inserted: to make the transmission facilities and transmission technologies more efficient; or] | ||||
| (34)(B)(iii) | (iii) [inserted: ] | |||
| [inserted: to increase the transfer capacity of the transmission facilities and transmission technologies; and] | ||||
| (34)(C) | (C) [inserted: ] | |||
| [inserted: includes, but is not limited to, dynamic line ratings, advanced conductors, topology optimization, advanced power-flow controls, and other digital or physical systems that increase the usable transfer capability of the grid.] | ||||
| (35) | (35) [inserted: Interconnection customer.—] | |||
| [inserted: The term “interconnection customer” means an entity, or any affiliates or subsidiaries of an entity, that proposes to interconnect a generating facility or an energy storage project to a transmission facility or transmission system.] | ||||
| (36) | (36) [inserted: Transmission benefits.—] | |||
| [inserted: The term “transmission benefits” means the broad range of economic, operational, safety, resilience, public policy, and environmental benefits (as assessed by the Commission in accordance with section 224(e)) and other reasonably anticipated benefits of constructing, modifying, or operating a transmission facility, including—] | ||||
| (36)(A) | (A) [inserted: ] | |||
| [inserted: improved reliability;] | ||||
| (36)(B) | (B) [inserted: ] | |||
| [inserted: improved resilience;] | ||||
| (36)(C) | (C) [inserted: ] | |||
| [inserted: improved safety;] | ||||
| (36)(D) | (D) [inserted: ] | |||
| [inserted: reduced congestion;] | ||||
| (36)(E) | (E) [inserted: ] | |||
| [inserted: reduced power losses;] | ||||
| (36)(F) | (F) [inserted: ] | |||
| [inserted: greater carrying capacity;] | ||||
| (36)(G) | (G) [inserted: ] | |||
| [inserted: reduced operating reserve requirements;] | ||||
| (36)(H) | (H) [inserted: ] | |||
| [inserted: improved access to lower-cost electricity generation;] | ||||
| (36)(I) | (I) [inserted: ] | |||
| [inserted: improved access to electricity generating facilities with no direct emissions of greenhouse gases;] | ||||
| (36)(J) | (J) [inserted: ] | |||
| [inserted: improved public health from the closure of electricity generation facilities that emit harmful pollution;] | ||||
| (36)(K) | (K) [inserted: ] | |||
| [inserted: increased competition and market liquidity in electricity markets;] | ||||
| (36)(L) | (L) [inserted: ] | |||
| [inserted: improved energy resilience and resilience of Department of Defense installations;] | ||||
| (36)(M) | (M) [inserted: ] | |||
| [inserted: improved ability to integrate new sources of electrical demand; and] | ||||
| (36)(N) | (N) [inserted: ] | |||
| [inserted: other potential benefits of increasing the interconnectedness of the electric grid.] | ||||
| (37) | (37) [inserted: Network upgrade.—] | |||
| [inserted: The term “network upgrade” means—] | ||||
| (37)(A) | (A) [inserted: ] | |||
| [inserted: any addition to or expansion of any transmission facility or transmission system;] | ||||
| (37)(B) | (B) [inserted: ] | |||
| [inserted: the construction of a new transmission facility that will become part of a transmission system;] | ||||
| (37)(C) | (C) [inserted: ] | |||
| [inserted: the addition of an energy storage project to a transmission facility or a transmission system; or] | ||||
| (37)(D) | (D) [inserted: ] | |||
| [inserted: any construction, deployment, or addition of an advanced transmission technology to a transmission facility or a transmission system that eliminates or reduces the need to carry out any of the activities described in subparagraphs (A) through (C).] | ||||
| (38) | (38) [inserted: Participant funding.—] | |||
| [inserted: The term “participant funding” means any cost allocation method under which an interconnection customer is required to pay, without reimbursement, all or a disproportionate amount of the costs of a network upgrade that is determined by the Commission to be necessary to ensure the reliable interconnection of the interconnection customer’s generating facility or energy storage project.] | ||||
| (39) | (39) [inserted: Transmission planning region.—] | |||
| [inserted: The term “transmission planning region” means—] | ||||
| (39)(A) | (A) [inserted: ] | |||
| [inserted: when used in a geographical sense, a region for which the Commission determines that electric transmission planning is appropriate, such as a region established in accordance with Order No. 1000 of the Commission, entitled ‘Transmission Planning and Cost Allocation by Transmission Owning and Operating Public Utilities’ (76 Fed. Reg. 49842 (August 11, 2011)); and] | ||||
| (39)(B) | (B) [inserted: ] | |||
| [inserted: when used in a corporate sense, means the Transmission Organization or other entity responsible for planning or operating electric transmission facilities within a region described in subparagraph (A).] | ||||
| (40) | (40) [inserted: Transmission system.—] | |||
| [inserted: For purposes of sections 224 and 227, the term “transmission system” means a network of transmission facilities used for the transmission of electric energy in interstate commerce.] | ||||
16 U.S.C. § 824a Interconnection and coordination of facilities; emergencies; transmission to foreign countries
13 changes the bill asks for here, 12 carried out
- Carried out:
by striking Commission after During the continuance of any war in which the United States is engaged, or whenever the and inserting Secretary of Energy (referred to in this subsection as the
Secretary
); - Carried out:
by striking
exists
afterdetermines that an emergency
and insertingcurrently exists or will occur within 6 months
; - Carried out:
by striking
Commission
afteror other causes, the
and insertingSecretary
; - Carried out:
by inserting
As part of the order, the Secretary shall explain why such order best meets the emergency and serves the public interest.
afterserve the public interest.
; and - Carried out:
by striking Commission after carrying out such order, the and inserting Federal Energy Regulatory Commission (referred to in this subsection as the
Commission
); - Carried out:
by striking
Commission
afterlaw or regulation, the
and insertingSecretary
; and - Carried out:
by adding at the end the following:
(A) that are in effect for 96 or fewer hours, the specific hours that are necessary to meet the emergency and serve the public interest; or (B) that are in effect for more than 96 hours, the specific methodology by which such hours that are necessary to meet the emergency and …
- Carried out:
by striking
Commission
wherever it appears and insertingSecretary
; - Carried out:
in subparagraph (A), by striking
that may result in a conflict with a requirement of any Federal, State, or local environmental law or regulation
; - Carried out:
by inserting
that may result in a conflict with a requirement of any Federal, State, or local environmental law or regulation
afterIn renewing or reissuing an order under subparagraph (A)
; and - Carried out:
by inserting
The Secretary shall make available to the public the primary Federal agency consulted.
afterpracticable.
; and - Not carried out:
by adding at the end—(C) Before renewing or reissuing an order under subparagraph (A), the Secretary shall undertake a robust study of available alternatives that would reduce the net costs as compared to renewing or reissuing the order. (D) In the event the Secretary issues a renewed or reissued order under this paragraph, a petition for judicial review of such renewed or reissued order may be filed under section 313(b) without filing a request for rehearing or otherwise complying with any requirements of section 313(a).; and
We can't read how this instruction is worded yet, so it isn't shown in the text.
Technical detail
no-pattern: adding at the end — QCONTENT; and - Carried out:
by adding at the end the following:
(6) (A) Not later than 30 days after the date on which the Secretary issues an order under paragraph (1), the Commission shall publish— (i) estimates of the costs that are expected to be incurred by any electric utility and customers of such electric utility as a result of the …
§ 824a(a)–(e)
| Where | Mark | The Code now | Mark | As the bill would leave it |
|---|---|---|---|---|
| § 824a. Interconnection and coordination of facilities; emergencies; transmission to foreign countries | § 824a. Interconnection and coordination of facilities; emergencies; transmission to foreign countries | |||
| (a) | (a) Regional districts; establishment; notice to State commissions | (a) Regional districts; establishment; notice to State commissions | ||
| For the purpose of assuring an abundant supply of electric energy throughout the United States with the greatest possible economy and with regard to the proper utilization and conservation of natural resources, the Commission is empowered and directed to divide the country into regional districts for the voluntary interconnection and coordination of facilities for the generation, transmission, and sale of electric energy, and it may at any time thereafter, upon its own motion or upon application, make such modifications thereof as in its judgment will promote the public interest. Each such district shall embrace an area which, in the judgment of the Commission, can economically be served by such interconnection and coordinated electric facilities. It shall be the duty of the Commission to promote and encourage such interconnection and coordination within each such district and between such districts. Before establishing any such district and fixing or modifying the boundaries thereof the Commission shall give notice to the State commission of each State situated wholly or in part within such district, and shall afford each such State commission reasonable opportunity to present its views and recommendations, and shall receive and consider such views and recommendations. | For the purpose of assuring an abundant supply of electric energy throughout the United States with the greatest possible economy and with regard to the proper utilization and conservation of natural resources, the Commission is empowered and directed to divide the country into regional districts for the voluntary interconnection and coordination of facilities for the generation, transmission, and sale of electric energy, and it may at any time thereafter, upon its own motion or upon application, make such modifications thereof as in its judgment will promote the public interest. Each such district shall embrace an area which, in the judgment of the Commission, can economically be served by such interconnection and coordinated electric facilities. It shall be the duty of the Commission to promote and encourage such interconnection and coordination within each such district and between such districts. Before establishing any such district and fixing or modifying the boundaries thereof the Commission shall give notice to the State commission of each State situated wholly or in part within such district, and shall afford each such State commission reasonable opportunity to present its views and recommendations, and shall receive and consider such views and recommendations. | |||
| (b) | (b) Sale or exchange of energy; establishing physical connections | (b) Sale or exchange of energy; establishing physical connections | ||
| Whenever the Commission, upon application of any State commission or of any person engaged in the transmission or sale of electric energy, and after notice to each State commission and public utility affected and after opportunity for hearing, finds such action necessary or appropriate in the public interest it may by order direct a public utility (if the Commission finds that no undue burden will be placed upon such public utility thereby) to establish physical connection of its transmission facilities with the facilities of one or more other persons engaged in the transmission or sale of electric energy, to sell energy to or exchange energy with such persons: Provided, That the Commission shall have no authority to compel the enlargement of generating facilities for such purposes, nor to compel such public utility to sell or exchange energy when to do so would impair its ability to render adequate service to its customers. The Commission may prescribe the terms and conditions of the arrangement to be made between the persons affected by any such order, including the apportionment of cost between them and the compensation or reimbursement reasonably due to any of them. | Whenever the Commission, upon application of any State commission or of any person engaged in the transmission or sale of electric energy, and after notice to each State commission and public utility affected and after opportunity for hearing, finds such action necessary or appropriate in the public interest it may by order direct a public utility (if the Commission finds that no undue burden will be placed upon such public utility thereby) to establish physical connection of its transmission facilities with the facilities of one or more other persons engaged in the transmission or sale of electric energy, to sell energy to or exchange energy with such persons: Provided, That the Commission shall have no authority to compel the enlargement of generating facilities for such purposes, nor to compel such public utility to sell or exchange energy when to do so would impair its ability to render adequate service to its customers. The Commission may prescribe the terms and conditions of the arrangement to be made between the persons affected by any such order, including the apportionment of cost between them and the compensation or reimbursement reasonably due to any of them. | |||
| (c) | (c) Temporary connection and exchange of facilities during emergency | (c) Temporary connection and exchange of facilities during emergency | ||
| (c)(1) | (1) | (1) | ||
| During the continuance of any war in which the United States is engaged, or whenever the | During the continuance of any war in which the United States is engaged, or whenever the [inserted: Secretary] [inserted: of Energy (referred to in this subsection as the “Secretary”) ]determines that an emergency [inserted: currently ]exists [inserted: or will occur within 6 months ]by reason of a sudden increase in the demand for electric energy, or a shortage of electric energy or of facilities for the generation or transmission of electric energy, or of fuel or water for generating facilities, or other causes, the [inserted: Secretary] shall have authority, either upon its own motion or upon complaint, with or without notice, hearing, or report, to require by order such temporary connections of facilities and such generation, delivery, interchange, or transmission of electric energy as in its judgment will best meet the emergency and serve the public interest. [inserted: As part of the order, the Secretary shall explain why such order best meets the emergency and serves the public interest. ]If the parties affected by such order fail to agree upon the terms of any arrangement between them in carrying out such order, the [inserted: Federal Energy Regulatory ]Commission[inserted: (referred to in this subsection as the “Commission”)], after hearing held either before or after such order takes effect, may prescribe by supplemental order such terms as it finds to be just and reasonable, including the compensation or reimbursement which should be paid to or by any such party. | |||
| (c)(2) | (2) | (2) | ||
| With respect to an order issued under this subsection that may result in a conflict with a requirement of any Federal, State, or local environmental law or regulation, the | With respect to an order issued under this subsection that may result in a conflict with a requirement of any Federal, State, or local environmental law or regulation, the [inserted: Secretary] shall ensure that such order requires generation, delivery, interchange, or transmission of electric energy only during hours necessary to meet the emergency and serve the public interest, and, to the maximum extent practicable, is consistent with any applicable Federal, State, or local environmental law or regulation and minimizes any adverse environmental impacts. | |||
| (c)(2)(A) | (A) [inserted: ] | |||
| [inserted: that are in effect for 96 or fewer hours, the specific hours that are necessary to meet the emergency and serve the public interest; or] | ||||
| (c)(2)(B) | (B) [inserted: ] | |||
| [inserted: that are in effect for more than 96 hours, the specific methodology by which such hours that are necessary to meet the emergency and serve the public interest were determined.] | ||||
| (c)(3) | (3) | (3) | ||
| To the extent any omission or action taken by a party, that is necessary to comply with an order issued under this subsection, including any omission or action taken to voluntarily comply with such order, results in noncompliance with, or causes such party to not comply with, any Federal, State, or local environmental law or regulation, such omission or action shall not be considered a violation of such environmental law or regulation, or subject such party to any requirement, civil or criminal liability, or a citizen suit under such environmental law or regulation. | To the extent any omission or action taken by a party, that is necessary to comply with an order issued under this subsection, including any omission or action taken to voluntarily comply with such order, results in noncompliance with, or causes such party to not comply with, any Federal, State, or local environmental law or regulation, such omission or action shall not be considered a violation of such environmental law or regulation, or subject such party to any requirement, civil or criminal liability, or a citizen suit under such environmental law or regulation. | |||
| (c)(4) | (4) | (4) | ||
| (c)(4)(A) | (A) | (A) | ||
| An order issued under this subsection | An order issued under this subsection shall expire not later than 90 days after it is issued. The [inserted: Secretary] may renew or reissue such order pursuant to paragraphs (1) and (2) for subsequent periods, not to exceed 90 days for each period, as the [inserted: Secretary] determines necessary to meet the emergency and serve the public interest. | |||
| (c)(4)(B) | (B) | (B) | ||
| In renewing or reissuing an order under subparagraph (A), the | In renewing or reissuing an order under subparagraph (A)[inserted: that may result in a conflict with a requirement of any Federal], [inserted: State, or local environmental law or regulation, ]the [inserted: Secretary] shall consult with the primary Federal agency with expertise in the environmental interest protected by such law or regulation, and shall include in any such renewed or reissued order such conditions as such Federal agency determines necessary to minimize any adverse environmental impacts to the extent practicable. The [inserted: Secretary shall make available to the public the primary Federal agency consulted. The ]conditions, if any, submitted by such Federal agency shall be made available to the public. The [inserted: Secretary] may exclude such a condition from the renewed or reissued order if it determines that such condition would prevent the order from adequately addressing the emergency necessitating such order and provides in the order, or otherwise makes publicly available, an explanation of such determination. | |||
| (c)(5) | (5) | (5) | ||
| If an order issued under this subsection is subsequently stayed, modified, or set aside by a court pursuant to section 825l of this title or any other provision of law, any omission or action previously taken by a party that was necessary to comply with the order while the order was in effect, including any omission or action taken to voluntarily comply with the order, shall remain subject to paragraph (3). | If an order issued under this subsection is subsequently stayed, modified, or set aside by a court pursuant to section 825l of this title or any other provision of law, any omission or action previously taken by a party that was necessary to comply with the order while the order was in effect, including any omission or action taken to voluntarily comply with the order, shall remain subject to paragraph (3). | |||
| (c)(6) | (6) [inserted: ] | |||
| (c)(6)(A) | (A) [inserted: ] | |||
| [inserted: Not later than 30 days after the date on which the Secretary issues an order under paragraph (1), the Commission shall publish—] | ||||
| (c)(6)(A)(i) | (i) [inserted: ] | |||
| [inserted: estimates of the costs that are expected to be incurred by any electric utility and customers of such electric utility as a result of the order; and] | ||||
| (c)(6)(A)(ii) | (ii) [inserted: ] | |||
| [inserted: other expected impacts of the order.] | ||||
| (c)(6)(B) | (B) [inserted: ] | |||
| [inserted: Not later than 60 days after the date on which the Secretary issues an order under paragraph (1), an electric utility that has been, or is expected to be, affected as a result of the order, including any electric utility described in subparagraph (A)(i), shall provide in writing to customers of the electric utility a description of the costs incurred due to the order, or costs expected to be incurred as a result of the order, including any information relevant to the electric utility and the customers of the electric utility published under subparagraph (A).] | ||||
| (d) | (d) Temporary connection during emergency by persons without jurisdiction of Commission | (d) Temporary connection during emergency by persons without jurisdiction of Commission | ||
| During the continuance of any emergency requiring immediate action, any person or municipality engaged in the transmission or sale of electric energy and not otherwise subject to the jurisdiction of the Commission may make such temporary connections with any public utility subject to the jurisdiction of the Commission or may construct such temporary facilities for the transmission of electric energy in interstate commerce as may be necessary or appropriate to meet such emergency, and shall not become subject to the jurisdiction of the Commission by reason of such temporary connection or temporary construction: Provided, That such temporary connection shall be discontinued or such temporary construction removed or otherwise disposed of upon the termination of such emergency: Provided further, That upon approval of the Commission permanent connections for emergency use only may be made hereunder. | During the continuance of any emergency requiring immediate action, any person or municipality engaged in the transmission or sale of electric energy and not otherwise subject to the jurisdiction of the Commission may make such temporary connections with any public utility subject to the jurisdiction of the Commission or may construct such temporary facilities for the transmission of electric energy in interstate commerce as may be necessary or appropriate to meet such emergency, and shall not become subject to the jurisdiction of the Commission by reason of such temporary connection or temporary construction: Provided, That such temporary connection shall be discontinued or such temporary construction removed or otherwise disposed of upon the termination of such emergency: Provided further, That upon approval of the Commission permanent connections for emergency use only may be made hereunder. | |||
| (e) | (e) Transmission of electric energy to foreign country | (e) Transmission of electric energy to foreign country | ||
| After six months from August 26, 1935, no person shall transmit any electric energy from the United States to a foreign country without first having secured an order of the Commission authorizing it to do so. The Commission shall issue such order upon application unless, after opportunity for hearing, it finds that the proposed transmission would impair the sufficiency of electric supply within the United States or would impede or tend to impede the coordination in the public interest of facilities subject to the jurisdiction of the Commission. The Commission may by its order grant such application in whole or in part, with such modifications and upon such terms and conditions as the Commission may find necessary or appropriate, and may from time to time, after opportunity for hearing and for good cause shown, make such supplemental orders in the premises as it may find necessary or appropriate. | After six months from August 26, 1935, no person shall transmit any electric energy from the United States to a foreign country without first having secured an order of the Commission authorizing it to do so. The Commission shall issue such order upon application unless, after opportunity for hearing, it finds that the proposed transmission would impair the sufficiency of electric supply within the United States or would impede or tend to impede the coordination in the public interest of facilities subject to the jurisdiction of the Commission. The Commission may by its order grant such application in whole or in part, with such modifications and upon such terms and conditions as the Commission may find necessary or appropriate, and may from time to time, after opportunity for hearing and for good cause shown, make such supplemental orders in the premises as it may find necessary or appropriate. | |||
Rest of § 824a unchanged
16 U.S.C. § 824p Siting of interstate electric transmission facilities
7 changes the bill asks for here, 6 carried out
- Carried out:
in subsection (b)(2), by inserting
(including transmission of electric energy from the outer Continental Shelf to a State)
afterinterstate commerce
; and - Carried out:
by amending paragraph (2) to read as follows:
(2) Lead agency.— For the purposes of coordinating all applicable Federal authorizations and related environmental reviews— (A) the Commission shall act as the lead agency in the case of— (i) except as provided in subparagraph (B), a transmission facility of national …
- Carried out:
in each of paragraphs (3), (4)(B), (4)(C), (5)(B), (6)(A), (7)(A), (8)(A)(i), and (9), by striking
Secretary
each place it appears and insertingapplicable lead agency
; - Carried out:
in paragraph (4)(A), by striking
As head of the lead agency, the Secretary
and insertingThe applicable lead agency
; - Carried out:
in paragraph (5)(A), by striking
As lead agency head, the Secretary
and insertingThe applicable lead agency
; and - Not carried out:
in subparagraph (A), by striking
after the date of enactment of this section
and insertingafter the date of enactment of the Energy Bills Relief Act
; and“after the date of enactment of this section” isn't in § 824p(h)(7)(A) in the Code as we have it. The law may have changed since the bill was drafted.
Technical detail
“after the date of enactment of this section” not found in /us/usc/t16/s824p/h/7/A - Carried out:
in subparagraph (B), by amending clause (i) to read as follows:
(i) Not later than six months after the date of enactment of the Energy Bills Relief Act, the Secretary, the Commission, and the heads of all Federal agencies with authority to issue Federal authorizations shall enter into a memorandum of understanding to ensure the timely and …
§ 824p(b)Construction permit(1)–(4)
Start of § 824p to (b)(1)(C)(ii) unchanged
| Where | Mark | The Code now | Mark | As the bill would leave it |
|---|---|---|---|---|
| (1)(C)(iii) | (iii) | (iii) | ||
| has denied an application seeking approval pursuant to applicable law; | has denied an application seeking approval pursuant to applicable law; | |||
| (2) | (2) | (2) | ||
| the facilities to be authorized by the permit will be used for the transmission of electric energy in interstate commerce; | the facilities to be authorized by the permit will be used for the transmission of electric energy in interstate commerce[inserted: (including transmission of electric energy from the outer Continental Shelf to a State)]; | |||
| (3) | (3) | (3) | ||
| the proposed construction or modification is consistent with the public interest; | the proposed construction or modification is consistent with the public interest; | |||
| (4) | (4) | (4) | ||
| the proposed construction or modification will significantly reduce transmission congestion in interstate commerce and protects or benefits consumers; | the proposed construction or modification will significantly reduce transmission congestion in interstate commerce and protects or benefits consumers; |
§ 824p(h)Coordination of Federal authorizations for transmission facilities(1)–(6)
(b)(5)–(h)(1) unchanged
| Where | Mark | The Code now | Mark | As the bill would leave it |
|---|---|---|---|---|
| (1)(A) | (A) | (A) | ||
| The term “Federal authorization” means any authorization required under Federal law in order to site a transmission facility. | The term “Federal authorization” means any authorization required under Federal law in order to site a transmission facility. | |||
| (1)(B) | (B) | (B) | ||
| The term “Federal authorization” includes such permits, special use authorizations, certifications, opinions, or other approvals as may be required under Federal law in order to site a transmission facility. | The term “Federal authorization” includes such permits, special use authorizations, certifications, opinions, or other approvals as may be required under Federal law in order to site a transmission facility. | |||
| (2) | (2) | (2) [inserted: Lead agency.—] | ||
| [inserted: For the purposes of coordinating all applicable Federal authorizations and related environmental reviews—] | ||||
| (2)(A) | (A) [inserted: ] | |||
| [inserted: the Commission shall act as the lead agency in the case of—] | ||||
| (2)(A)(i) | (i) [inserted: ] | |||
| [inserted: except as provided in subparagraph (B), a transmission facility of national significance in a national interest electric transmission corridor designated by the Secretary under subsection (a); or] | ||||
| (2)(A)(ii) | (ii) [inserted: ] | |||
| [inserted: a transmission facility of national significance for which an application has been submitted for a certificate of public convenience and necessity under section 227;] | ||||
| (2)(B) | (B) [inserted: ] | |||
| [inserted: the Department of the Interior shall act as the lead agency in the case of a transmission facility of national significance in a national interest electric transmission corridor designated by the Secretary under subsection (a) that is located on a lease, easement, or right-of-way granted by the Secretary of the Interior under section 8(p)(1)(C) of the Outer Continental Shelf Lands Act (43 U.S.C. 1337(p)(1)(C)); and] | ||||
| (2)(C) | (C) [inserted: ] | |||
| [inserted: the Department of Energy shall act as the lead agency in the case of any other transmission facility of national significance.] | ||||
| (2) | ||||
| (3) | (3) | (3) | ||
| To the maximum extent practicable under applicable Federal law, the | To the maximum extent practicable under applicable Federal law, the [inserted: applicable] [inserted: lead agency ]shall coordinate the Federal authorization and review process under this subsection with any Indian tribes, multistate entities, and State agencies that are responsible for conducting any separate permitting and environmental reviews of the facility, to ensure timely and efficient review and permit decisions. | |||
| (4) | (4) | (4) | ||
| (4)(A) | (A) | (A) | ||
| [inserted: The] [inserted: applicable] lead agency, in consultation with agencies responsible for Federal authorizations and, as appropriate, with Indian tribes, multistate entities, and State agencies that are willing to coordinate their own separate permitting and environmental reviews with the Federal authorization and environmental reviews, shall establish prompt and binding intermediate milestones and ultimate deadlines for the review of, and Federal authorization decisions relating to, the proposed facility. | ||||
| (4)(B) | (B) | (B) | ||
| The | The [inserted: applicable] [inserted: lead agency ]shall ensure that, once an application has been submitted with such data as the [inserted: applicable] [inserted: lead agency ]considers necessary, all permit decisions and related environmental reviews under all applicable Federal laws shall be completed— | |||
| (4)(B)(i) | (i) | (i) | ||
| within 1 year; or | within 1 year; or | |||
| (4)(B)(ii) | (ii) | (ii) | ||
| if a requirement of another provision of Federal law does not permit compliance with clause (i), as soon thereafter as is practicable. | if a requirement of another provision of Federal law does not permit compliance with clause (i), as soon thereafter as is practicable. | |||
| (4)(C) | (C) | (C) | ||
| The | The [inserted: applicable] [inserted: lead agency ]shall provide an expeditious pre-application mechanism for prospective applicants to confer with the agencies involved to have each such agency determine and communicate to the prospective applicant not later than 60 days after the prospective applicant submits a request for such information concerning— | |||
| (4)(C)(i) | (i) | (i) | ||
| the likelihood of approval for a potential facility; and | the likelihood of approval for a potential facility; and | |||
| (4)(C)(ii) | (ii) | (ii) | ||
| key issues of concern to the agencies and public. | key issues of concern to the agencies and public. | |||
| (5) | (5) | (5) | ||
| (5)(A) | (A) | (A) | ||
| [inserted: The] [inserted: applicable ]lead agency, in consultation with the affected agencies, shall prepare a single environmental review document, which shall be used as the basis for all decisions on the proposed project under Federal law. | ||||
| (5)(B) | (B) | (B) | ||
| The | The [inserted: applicable] [inserted: lead agency ]and the heads of other agencies shall streamline the review and permitting of transmission within corridors designated under section 503 of the Federal Land Policy and Management Act (43 U.S.C. 1763) by fully taking into account prior analyses and decisions relating to the corridors. | |||
| (5)(C) | (C) | (C) | ||
| The document shall include consideration by the relevant agencies of any applicable criteria or other matters as required under applicable law. | The document shall include consideration by the relevant agencies of any applicable criteria or other matters as required under applicable law. | |||
| (6) | (6) | (6) | ||
| (6)(A) | (A) | (A) | ||
| If any agency has denied a Federal authorization required for a transmission facility, or has failed to act by the deadline established by the | If any agency has denied a Federal authorization required for a transmission facility, or has failed to act by the deadline established by the [inserted: applicable] [inserted: lead agency ]pursuant to this section for deciding whether to issue the authorization, the applicant or any State in which the facility would be located may file an appeal with the President, who shall, in consultation with the affected agency, review the denial or failure to take action on the pending application. | |||
| (6)(B) | (B) | (B) | ||
| Based on the overall record and in consultation with the affected agency, the President may— | Based on the overall record and in consultation with the affected agency, the President may— | |||
| (6)(B)(i) | (i) | (i) | ||
| issue the necessary authorization with any appropriate conditions; or | issue the necessary authorization with any appropriate conditions; or | |||
§ 824p(h)Coordination of Federal authorizations for transmission facilities(6)–(9)
(h)(6)(B)(ii)–(D)(iv) unchanged
| Where | Mark | The Code now | Mark | As the bill would leave it |
|---|---|---|---|---|
| (6)(D)(v) | (v) | (v) | ||
| the Federal Land Policy and Management Act of 1976 (43 U.S.C. 1701 et seq.). | the Federal Land Policy and Management Act of 1976 (43 U.S.C. 1701 et seq.). | |||
| (7) | (7) | (7) | ||
| (7)(A) | (A) | (A) | ||
| Not later than 18 months after August 8, 2005, the | Not later than 18 months after August 8, 2005, the [inserted: applicable] [inserted: lead agency ]shall issue any regulations necessary to implement this subsection. | |||
| (7)(B) | (B) | (B) | ||
| (7)(B)(i) | (i) | (i) | ||
| Not later than | Not later than [inserted: six] [inserted: months] after [inserted: the] [inserted: date] [inserted: of enactment of the Energy Bills Relief Act], the Secretary[inserted: ,] [inserted: the Commission, ]and the heads of all Federal agencies with authority to issue Federal authorizations shall enter into a memorandum of understanding to ensure the timely and coordinated review and permitting of [inserted: electric] transmission facilities. | |||
| (7)(B)(ii) | (ii) | (ii) | ||
| Interested Indian tribes, multistate entities, and State agencies may enter the memorandum of understanding. | Interested Indian tribes, multistate entities, and State agencies may enter the memorandum of understanding. | |||
| (7)(C) | (C) | (C) | ||
| The head of each Federal agency with authority to issue a Federal authorization shall designate a senior official responsible for, and dedicate sufficient other staff and resources to ensure, full implementation of the regulations and memorandum required under this paragraph. | The head of each Federal agency with authority to issue a Federal authorization shall designate a senior official responsible for, and dedicate sufficient other staff and resources to ensure, full implementation of the regulations and memorandum required under this paragraph. | |||
| (8) | (8) | (8) | ||
| (8)(A) | (A) | (A) | ||
| Each Federal land use authorization for an electricity transmission facility shall be issued— | Each Federal land use authorization for an electricity transmission facility shall be issued— | |||
| (8)(A)(i) | (i) | (i) | ||
| for a duration, as determined by the | for a duration, as determined by the [inserted: applicable lead agency], commensurate with the anticipated use of the facility; and | |||
| (8)(A)(ii) | (ii) | (ii) | ||
| with appropriate authority to manage the right-of-way for reliability and environmental protection. | with appropriate authority to manage the right-of-way for reliability and environmental protection. | |||
| (8)(B) | (B) | (B) | ||
| On the expiration of the authorization (including an authorization issued before August 8, 2005), the authorization shall be reviewed for renewal taking fully into account reliance on such electricity infrastructure, recognizing the importance of the authorization for public health, safety, and economic welfare and as a legitimate use of Federal land. | On the expiration of the authorization (including an authorization issued before August 8, 2005), the authorization shall be reviewed for renewal taking fully into account reliance on such electricity infrastructure, recognizing the importance of the authorization for public health, safety, and economic welfare and as a legitimate use of Federal land. | |||
| (9) | (9) | (9) | ||
| In exercising the responsibilities under this section, the | In exercising the responsibilities under this section, the [inserted: applicable] [inserted: lead agency ]shall consult regularly with— | |||
| (9)(A) | (A) | (A) | ||
| the Federal Energy Regulatory Commission; | the Federal Energy Regulatory Commission; | |||
| (9)(B) | (B) | (B) | ||
| electric reliability organizations (including related regional entities) approved by the Commission; and | electric reliability organizations (including related regional entities) approved by the Commission; and |
Rest of § 824p unchanged
16 U.S.C. § 824s Transmission infrastructure investment
12 changes the bill asks for here, 11 carried out
- Carried out:
Section 219(b)(4)(B) of the Federal Power Act (16 U.S.C. 824s(b)(4)(B)) is amended by striking
section 216
and insertingsections 216 and 227
. - Not carried out:
by striking
Not later than 1 year after the date of enactment of this section, the Commission shall establish, by rule,
and insertingThe Commission shall issue such rules as may be necessary to establish
; and“Not later than 1 year after the date of enactment of this section, the Commission shall establish, by rule,” isn't in § 824s(a) in the Code as we have it. The law may have changed since the bill was drafted.
Technical detail
“Not later than 1 year after the date of enactment of this section, the Commission shall establish, by rule,” not found in /us/usc/t16/s824s/a - Carried out:
by inserting
, improving efficiency,
afterensuring reliability
; - Carried out:
in the matter preceding paragraph (1), by striking
The rule shall
and insertingThe rules issued under this section shall
; - Carried out:
in paragraph (1), by inserting
, and operational improvements for,
aftercapital investment in
; - Carried out:
by inserting
or other incentive mechanism
afterreturn on equity
; and - Carried out:
by inserting
or incentivizes improvements that increase the efficiency of the transmission of electric energy and reduce costs for consumers
after(including related transmission technologies)
; - Carried out:
in paragraph (3), by inserting
, including performance-based measures,
afterother measures
; and - Carried out:
in subparagraph (A), by striking
; and
and inserting a semicolon;
- Carried out:
in subparagraph (B), by striking the period and inserting
; and
; and - Carried out:
by adding at the end the following new subparagraph:
(C) amounts determined pursuant to shared savings frameworks or other incentive mechanisms prescribed in such rules.; and
- Carried out:
by amending subsection (c) to read as follows:
(c) Transmission organization-Based incentives.— (1) Transmission organization membership.— In a rule issued under this section, the Commission shall, to the extent within its jurisdiction, provide for incentives to each transmitting utility or electric utility that joins a …
§ 824s(a)–(d)
| Where | Mark | The Code now | Mark | As the bill would leave it |
|---|---|---|---|---|
| § 824s. Transmission infrastructure investment | § 824s. Transmission infrastructure investment | |||
| (a) | (a) Rulemaking requirement | (a) Rulemaking requirement | ||
| Not later than 1 year after August 8, 2005, the Commission shall establish, by rule, incentive-based (including performance-based) rate treatments for the transmission of electric energy in interstate commerce by public utilities for the purpose of benefitting consumers by ensuring reliability and reducing the cost of delivered power by reducing transmission congestion. | Not later than 1 year after August 8, 2005, the Commission shall establish, by rule, incentive-based (including performance-based) rate treatments for the transmission of electric energy in interstate commerce by public utilities for the purpose of benefitting consumers by ensuring reliability[inserted: ,] [inserted: improving efficiency, ]and reducing the cost of delivered power by reducing transmission congestion. | |||
| (b) | (b) Contents | (b) Contents | ||
| The | The [inserted: rules] [inserted: issued under this section ]shall— | |||
| (b)(1) | (1) | (1) | ||
| promote reliable and economically efficient transmission and generation of electricity by promoting capital investment in the enlargement, improvement, maintenance, and operation of all facilities for the transmission of electric energy in interstate commerce, regardless of the ownership of the facilities; | promote reliable and economically efficient transmission and generation of electricity by promoting capital investment in[inserted: ,] [inserted: and operational improvements for, ]the enlargement, improvement, maintenance, and operation of all facilities for the transmission of electric energy in interstate commerce, regardless of the ownership of the facilities; | |||
| (b)(2) | (2) | (2) | ||
| provide a return on equity that attracts new investment in transmission facilities (including related transmission technologies); | provide a return on equity [inserted: or other incentive mechanism ]that attracts new investment in transmission facilities (including related transmission technologies)[inserted: or incentivizes improvements that increase the efficiency of the transmission of electric energy and reduce costs for consumers]; | |||
| (b)(3) | (3) | (3) | ||
| encourage deployment of transmission technologies and other measures to increase the capacity and efficiency of existing transmission facilities and improve the operation of the facilities; and | encourage deployment of transmission technologies and other measures[inserted: ,] [inserted: including performance-based measures, ]to increase the capacity and efficiency of existing transmission facilities and improve the operation of the facilities; and | |||
| (b)(4) | (4) | (4) | ||
| allow recovery of— | allow recovery of— | |||
| (b)(4)(A) | (A) | (A) | ||
| all prudently incurred costs necessary to comply with mandatory reliability standards issued pursuant to section 824o of this title; | all prudently incurred costs necessary to comply with mandatory reliability standards issued pursuant to section 824o of this title; | |||
| (b)(4)(B) | (B) | (B) | ||
| all prudently incurred costs related to transmission infrastructure development pursuant to | all prudently incurred costs related to transmission infrastructure development pursuant to [inserted: sections] [inserted: 216] [inserted: and] [inserted: 227;] [inserted: and] | |||
| (b)(4)(C) | (C) [inserted: ] | |||
| [inserted: amounts determined pursuant to shared savings frameworks or other incentive mechanisms prescribed in such rules.] | ||||
| (c) | (c) | (c) [inserted: Transmission organization-Based incentives.—] | ||
| (c)(1) | (1) [inserted: Transmission organization membership.—] | |||
| [inserted: In a rule issued under this section, the Commission shall, to the extent within its jurisdiction, provide for incentives to each transmitting utility or electric utility that joins a Transmission Organization.] | ||||
| (c)(2) | (2) [inserted: Initial membership incentive.—] | |||
| [inserted: In carrying out paragraph (1), the Commission shall provide for an electric utility to yield a return on equity incentive—] | ||||
| (c)(2)(A) | (A) [inserted: ] | |||
| [inserted: of not more than 50 basis points for the 3-year period beginning on the date on which the electric utility joins a Transmission Organization; and] | ||||
| (c)(2)(B) | (B) [inserted: ] | |||
| [inserted: the transfer of a transmitting utility from 1 transmission organization to another shall not trigger a new period under subparagraph (A).] | ||||
| (c)(3) | (3) [inserted: Regional and interregional facility incentive.—] | |||
| [inserted: After the expiration of the period under paragraph (2)(A), the Commission may provide a return on equity incentive of not more than 75 basis points with respect to transmission facilities of such utility that—] | ||||
| (c)(3)(A) | (A) [inserted: ] | |||
| [inserted: provide demonstrable benefits to customers on a regional or interregional basis, as determined by the Commission; and] | ||||
| (c)(3)(B) | (B) [inserted: ] | |||
| [inserted: are selected in a transmission planning process conducted by a Transmission Organization or by 2 or more such organizations on an interregional basis.] | ||||
| (c)(4) | (4) [inserted: Incentives for non-members.—] | |||
| [inserted: In the case of an electric utility that is not a member of a Transmission Organization, the Commission may provide an additional return on equity incentive of not more than 25 basis points with respect to transmission facilities that satisfy the criteria set forth in paragraph (3).] | ||||
| (c)(5) | (5) [inserted: Guardrails.—] | |||
| [inserted: In determining whether, and at what level, to provide incentives under this subsection, the Commission may consider—] | ||||
| (c)(5)(A) | (A) [inserted: ] | |||
| [inserted: measurable customer benefits, including reliability, resilience, and congestion cost reductions;] | ||||
| (c)(5)(B) | (B) [inserted: ] | |||
| [inserted: cost discipline, including consistency with least-cost planning and mitigation of excessive capital bias; and] | ||||
| (c)(5)(C) | (C) [inserted: ] | |||
| [inserted: the persistence and magnitude of expected benefits.] | ||||
| (c)(6) | (6) [inserted: Duration and review.—] | |||
| [inserted: The Commission may establish time limits for incentives under this subsection and shall provide for periodic review and adjustment or termination of such incentives if the underlying bases for the incentives no longer exist.] | ||||
| (c)(7) | (7) [inserted: Method of cost recovery.—] | |||
| [inserted: The Commission shall ensure that any costs recoverable pursuant to this subsection may be recovered by such utility through the transmission rates charged by such utility or through the transmission rates charged by the Transmission Organization that provides transmission service to such utility.] | ||||
| (c) | ||||
| (d) | (d) Just and reasonable rates | (d) Just and reasonable rates | ||
| All rates approved under the rules adopted pursuant to this section, including any revisions to the rules, are subject to the requirements of sections 824d and 824e of this title that all rates, charges, terms, and conditions be just and reasonable and not unduly discriminatory or preferential. | All rates approved under the rules adopted pursuant to this section, including any revisions to the rules, are subject to the requirements of sections 824d and 824e of this title that all rates, charges, terms, and conditions be just and reasonable and not unduly discriminatory or preferential. | |||
16 U.S.C. § 825m Enforcement provisions
7 changes the bill asks for here, 7 carried out
- Carried out:
by striking
individual
and insertingperson
; and - Carried out:
by inserting
or 222
aftersection 221
; - Carried out:
in paragraph (1), by inserting
with respect to a person who is an individual,
beforeacting
; and - Carried out:
in the matter preceding subparagraph (A), by inserting
, directly or indirectly,
afterengaging
; - Carried out:
in subparagraph (A), by striking
; or
and inserting a semicolon;
- Carried out:
by redesignating subparagraph (B) as subparagraph (C); and
- Carried out:
by inserting after subparagraph (A) the following:
(B) electric energy products, including financial transmission rights; or.
§ 825m(c)–(d)
Start of § 825m to (b) unchanged
| Where | Mark | The Code now | Mark | As the bill would leave it |
|---|---|---|---|---|
| (c) | (c) Employment of attorneys | (c) Employment of attorneys | ||
| The Commission may employ such attorneys as it finds necessary for proper legal aid and service of the Commission or its members in the conduct of their work, or for proper representation of the public interests in investigations made by it or cases or proceedings pending before it, whether at the Commission’s own instance or upon complaint, or to appear for or represent the Commission in any case in court; and the expenses of such employment shall be paid out of the appropriation for the Commission. | The Commission may employ such attorneys as it finds necessary for proper legal aid and service of the Commission or its members in the conduct of their work, or for proper representation of the public interests in investigations made by it or cases or proceedings pending before it, whether at the Commission’s own instance or upon complaint, or to appear for or represent the Commission in any case in court; and the expenses of such employment shall be paid out of the appropriation for the Commission. | |||
| (d) | (d) Prohibitions on violators | (d) Prohibitions on violators | ||
| In any proceedings under subsection (a), the court may prohibit, conditionally or unconditionally, and permanently or for such period of time as the court determines, any | In any proceedings under subsection (a), the court may prohibit, conditionally or unconditionally, and permanently or for such period of time as the court determines, any [inserted: person] who is engaged or has engaged in practices constituting a violation of section 824u of this title [inserted: or 222 ](and related rules and regulations) from— | |||
| (d)(1) | (1) | (1) | ||
| acting as an officer or director of an electric utility; or | [inserted: with respect to a person who is an individual, ]acting as an officer or director of an electric utility; or | |||
| (d)(2) | (2) | (2) | ||
| engaging in the business of purchasing or selling— | engaging[inserted: ,] [inserted: directly or indirectly, ]in the business of purchasing or selling— | |||
| (d)(2)(A) | (A) | (A) | ||
| electric energy; | electric energy; | |||
| (d)(2)(B) | (B) [inserted: ] | |||
| [inserted: electric energy products, including financial transmission rights; or] | ||||
| (d)(2)(C) | [inserted: (C)] | |||
| transmission services subject to the jurisdiction of the Commission. | transmission services subject to the jurisdiction of the Commission. | |||