Skip to content
The People's CodeSearch
Menu

Changes to the Code

H.R. 8262 · Build More Power Act ·

In committee · step 2 of 5

Sections are cited like “7 U.S.C. § 2012”: 7 of the , 2012.

42 U.S.C. § 16517 Energy infrastructure reinvestment financing

+11 −13 of 6 shown
More for 42 U.S.C. § 16517
Read § 16517Only this section
6 changes the bill asks for here, 3 carried out
  1. Carried out:

    Section 1706 of the Energy Policy Act of 2005 (42 U.S.C. 16517) is amended by adding at the end the following:(g) Section 202(c) facilities.— (1) Treatment of required electric energy generation.— Energy infrastructure that is required by an order issued under section 202(c) of the Federal Power Act to generate electric energy shall be considered to have ceased operations for purposes …

  2. Carried out:

    Section 1706(f) of the Energy Policy Act of 2005 (42 U.S.C. 16517(f)) is amended by striking 2028 and inserting 2032.

  3. Not carried out:

    in subsection (a), by striking 2026 and inserting 2032; and

    “2026” isn't in § 16517(a) in the Code as we have it. The law may have changed since the bill was drafted.

    Technical detail“2026” not found in /us/usc/t42/s16517/a
  4. Not carried out:

    by striking The Secretary may and inserting the following:(1) In general.— The Secretary may;

    The bill turns “The Secretary may” into a provision of its own, but in § 16517(b) the text doesn't begin with those words. The law may have changed since the bill was drafted.

    Technical detail“The Secretary may” does not open the text of /us/usc/t42/s16517/b
  5. Not carried out:

    by striking 2028 and inserting 2032; and

    “2028” isn't in § 16517(b) in the Code as we have it. The law may have changed since the bill was drafted.

    Technical detail“2028” not found in /us/usc/t42/s16517/b
  6. Carried out:

    by adding at the end the following:(2) Set aside for certain section 202(c) facilities.— Of the total principal amount described in paragraph (1), not less than $20,000,000,000 of such amount shall be used to guarantee loans for projects described in section 1706(a) of the Energy Policy Act of 2005 with respect …

§ 16517(a)–(c)

Start of § 16517 to (a)(2) unchanged

WhereMarkThe Code nowMarkAs the bill would leave it
(a)(3)(3) (3)
support or enable the provision of known or forecastable electric supply at time intervals necessary to maintain or enhance grid reliability or other system adequacy needs.support or enable the provision of known or forecastable electric supply at time intervals necessary to maintain or enhance grid reliability or other system adequacy needs.
(b)(b) Inclusion(b) Inclusion
A project under subsection (a) may include the remediation of environmental damage associated with energy infrastructure.A project under subsection (a) may include the remediation of environmental damage associated with energy infrastructure.
(b)(2)(2) [inserted: Set aside for certain section 202(c) facilities.—]
[inserted: Of the total principal amount described in paragraph (1), not less than $20,000,000,000 of such amount shall be used to guarantee loans for projects described in section 1706(a) of the Energy Policy Act of 2005 with respect to energy infrastructure required to generate electric energy by an order issued under section 202(c) of the Federal Power Act.]
(c)(c) Application(c) Application
To apply for a guarantee under this section, an applicant shall submit to the Secretary an application at such time, in such manner, and containing such information as the Secretary may require, including—To apply for a guarantee under this section, an applicant shall submit to the Secretary an application at such time, in such manner, and containing such information as the Secretary may require, including—
(c)(1)(1) (1)
a detailed plan describing the proposed project; anda detailed plan describing the proposed project; and

§ 16517(e)–(g)

(c)(2)–(d) unchanged

WhereMarkThe Code nowMarkAs the bill would leave it
(e)(e) Definition of energy infrastructure(e) Definition of energy infrastructure
In this section, the term “energy infrastructure” means a facility, and associated equipment, used for enabling the identification, leasing, development, production, processing, transportation, transmission, refining, and generation needed for energy and critical minerals.In this section, the term “energy infrastructure” means a facility, and associated equipment, used for enabling the identification, leasing, development, production, processing, transportation, transmission, refining, and generation needed for energy and critical minerals.
(f)(f) Funding(f) Funding
(f)(1)(1) In general(1) In general
In addition to amounts otherwise available, there is appropriated to the Secretary for fiscal year 2025, out of any money in the Treasury not otherwise appropriated, $1,000,000,000, to remain available through September 30, [struck: 2028], to carry out activities under this section.In addition to amounts otherwise available, there is appropriated to the Secretary for fiscal year 2025, out of any money in the Treasury not otherwise appropriated, $1,000,000,000, to remain available through September 30, [inserted: 2032], to carry out activities under this section.
(f)(2)(2) Administrative costs(2) Administrative costs
Of the amount made available under paragraph (1), the Secretary shall use not more than 3 percent for administrative expenses.Of the amount made available under paragraph (1), the Secretary shall use not more than 3 percent for administrative expenses.
(g)(g) [inserted: Section 202(c) facilities.—]
(g)(1)(1) [inserted: Treatment of required electric energy generation.—]
[inserted: Energy infrastructure that is required by an order issued under section 202(c) of the Federal Power Act to generate electric energy shall be considered to have ceased operations for purposes of subsection (a)(1).]
(g)(2)(2) [inserted: Solicitation of applications.—]
(g)(2)(A)(A) [inserted: In general.—]
[inserted: If the Secretary issues an order under section 202(c) of the Federal Power Act requiring energy infrastructure to generate electric energy, the Secretary shall, when issuing such order, solicit an application for a guarantee under this section for a project described in paragraph (1), (2), or (3) of subsection (a) with respect to such energy infrastructure.]
(g)(2)(B)(B) [inserted: Existing orders.—]
[inserted: With respect to any energy infrastructure required to generate electric energy by an order issued under section 202(c) of the Federal Power Act on or before the date of enactment of this subsection, and if such order is in effect on such date of enactment, the Secretary shall, not later than 60 days after such date of enactment, solicit applications for a guarantee under this section for projects described in paragraph (1), (2), or (3) of subsection (a) with respect to such energy infrastructure.]

Step through the changes