Title 10 · Armed ForcesThe military
Changes to 10 U.S.C. § 1733
H.R. 8800 · National Defense Authorization Act for Fiscal Year 2027 · Engrossed The official text as one chamber (House or Senate) passed it.
Passed the House · step 3 of 5
10 U.S.C. § 1733 Product support manager
5 changes the bill asks for here, 4 carried out
- Carried out:
by redesignating paragraphs (4) through (9) as paragraphs (5) through (10), respectively;
- Carried out:
by redesignating the second paragraph (3) (relating to Adopting predictive analytics) as paragraph (4); and
- Carried out:
by adding at the end the following new paragraph:
(11) Maximizing the qualification, approval, integration, and adoption of advanced technologies and processes..
- Not carried out:
by redesignating the second paragraph (3) through paragraph (9) as paragraphs (4) through (10), respectively; and
We can't read how this instruction is worded yet, so it isn't shown in the text.
Technical detail
no-pattern: redesignating the second paragraph (X) through paragraph (X) as paragraphs (X) through (X), respectively; and - Carried out:
in paragraph (8), as so redesignated, by inserting
and
beforecritical readiness
.
§ 1733(d)–(e)
Start of § 1733 to (d)(3) unchanged ·
(A) in developing the life-cycle sustainment plan and product support strategy required under section 4324 of this title; and
(B) to analyze the operating and support costs to ensure cost-effective operation, management, and availability of the covered system.
[struck: (3)] [inserted: (4)] 1 Adopting predictive analytics and simulation and modeling tools to improve materiel availability and reliability, increase operational availability rates, and reduce operation and sustainment costs.
[struck: (4)] [inserted: (5)] Conducting product support business case analyses to provide a structured, iterative methodology to compare and assess the full impact of product support alternatives and provide data-informed recommendations that balance requirements with affordability. Such analyses shall—
(A) enable the development of the product support strategy as early as possible, but not later than Milestone B approval has been granted for the covered system; and
(B) inform proposed updates or changes in the product support strategy as needed.
[struck: (5)] [inserted: (6)] Reviewing and recommending resource allocations across product support integrators and product support providers to meet performance requirements of the product support strategy.
[struck: (6)] [inserted: (7)] Coordinating product support arrangements between product support integrators and product support providers across materiel commands, depots, sustainment working capital funds, and commercial entities to execute the product support strategy and maintain updated parts cataloging and provisioning.
[struck: (7)] [inserted: (8)] Seeking to resolve issues relating to diminishing manufacturing supply, material shortages, [inserted: and ]critical readiness items of supply.
[struck: (8)] [inserted: (9)] Managing the end-to-end coordination process related to qualification, certification, and testing of alternative sources of supply for critical readiness items of supply.
[struck: (9)] [inserted: (10)] Ensuring the evaluation and selection of product support integrators and product support providers that are best suited to execute the product support strategy.
(11) [inserted: Maximizing the qualification, approval, integration, and adoption of advanced technologies and processes.]
(e) Definitions.— In this section:
(1) The term “best value” has the meaning given in section 3101 of this title.
(2) The terms “covered system”, “critical readiness items of supply”, “product support”, “product support arrangement”, “product support integrator”, and “product support provider” have the meanings given, respectively, in section 4324 of this title.